Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Whole-of-System Analysis Using CFD to Reduce Emissions of Fugitives Gases Inside a Copper Smelter BuildingBy E Nik, A Manzoori, H Namavari, P Witt
The smelter building at Sarcheshmeh Copper Complex, Iran, houses two reverberatory furnaces and five Pierce-Smith converters. Under normal operating conditions SO2 emissions fill the building, posing
Jan 1, 2004
-
Purification of Pressure Leach Liquor for Zinc Electrowinning - A Comparison of the Hematite and Magnetite Process for Iron RemovalBy Dixon D. R, Sparrow G. J
Pressure leach liquors from the pressure oxidation of a bulk flotation concentrate prepared from a complex Cu-Pb-Zn sulphide ore were treated to remove iron, either by pressure oxidation (the Hemat
Jan 1, 1989
-
Characterising the Blasting Properties of Iron OreBy A Scott, I Onederra
Most iron ores occur in mine benches as complex mixtures of lithologies and ore types. This significantly complicates their characterisation for both blast design and fragmentation modelling. A great
Jul 13, 2015
-
Murrin Murrin Heap Leaching ProjectBy N Meadows, M Rodriguez
A 200 000 tpa heap leach demonstration plant was approved by the Murrin Murrin Joint Venture (MMJV) in December 2005 and engineering commenced in January 2006. The demonstration plant will utilise sto
Jan 1, 2006
-
Is Measuring pH Enough?By J Kinal, I Mitchell
Many flotation plants use pH to adjust the pulp chemistry of their system to achieve optimum separation. For example, in a sequential lead/zinc circuit the pH during sphalerite flotation is increased
Jan 1, 2006
-
Iron Ore Characteristics and their Application in Optimising the Granulation ProcessBy R Zhang, X Huang, M Zhou, X Lv, C Bai
Iron ore sinter accounts for a large proportion of blast furnace ferrous burden in Chinese steel mills. Depleting high-grade iron ore resources and spreading complexity of iron ores in mineralogy and
Aug 12, 2013
-
Mine Project Risk ManagementRisk management has become an essential tool for mining companies to ensure their projects are well-managed and profit expectations are achieved. Risk management has also become a mandatory corporate
May 24, 2012
-
Technology Upgrades Improve TDM Moura's Overburden Blasting OperationThiess Dampier Mitsui's Moura-Mine is located in the south-eastern corner of Queensland's Bowen Basin, some 180 kms west of Gladstone. Current requirements of the open cut operation are
Jan 1, 1986
-
Differential Cut-Off GradesDetailed underground mine design and optimisation studies undertaken by the author over the past few years have clearly demonstrated that additional value can be created by varying the cut-off grade (
Jan 1, 2005
-
Calculating the Value of Iron Ores in Ironmaking and SteelmakingBy T Honeyands
At present we are witnessing large investments in the iron ore industry, fuelled by demand from Asia. At the same time, there is a changing landscape in pricing of iron ores, with the recent demise of
Jul 11, 2011
-
Lessons Learned from Geometallurgical Investigations Carried Out on a Nickel Sulfide Flotation PlantBy B Newcombe
From many years practical industrial experience the author has drawn together a list of the key points to consider when embarking on a large-scale geometallurgical project. Fundamental aspects which m
Sep 5, 2011
-
Determination of Gas Content of Coal SeamsBy Bartosiewicz H
A method for the determination of the gas content of coal seams is presented which improves upon existing methods. The method makes use of a gravitational technique for measurement of the gas deso
Jan 1, 1982
-
Optimisation of Asanko’s Obotan SABC circuit to achieve ‘Project 5 Million’By R Bradford, W Gift-Agbey, T Vorster, P Morgan, E Grobler
The Asanko Gold Mine in Ghana started processing ore from the Nkran pit in January 2016 at a production nameplate of 3 Mt/a. The flowsheet is a conventional SAG, ball mill and pebble crusher (SABC) w
Aug 29, 2018
-
Integrated Optimisation of Grinding and Flotation CircuitsBy P Holtham, K C. Runge, E Tabosa
Traditionally, comminution and flotation have been surveyed, analysed and optimised separately. This often results in less than optimal outcomes because of the complex interactions between the two pro
Sep 1, 2014
-
Fundamentals of Open Pit Planning and SchedulingOpen pit planning and scheduling play a significant role in establishing, maintaining and improving the economics of open pit mining ventures.The development of an open pit plan and schedule involves
Jan 1, 1992
-
How to Deal Effectively with the Media, Public, and GovernmentExternal pressures are being exerted on busi- ness, and especially the mining and energy in- dustries, as never before. These pressures are burdensome, they emerge in unique forms, and they constitu
Jan 1, 1978
-
Understanding the Kegold ElectrodeBy Wright D. C
The operation of the cyanide-sensitive Mintek/TB1 kegold electrode was studied in the laboratory, with regard to equilibration time and drift, the effects of pH, stirring, salinity, dissolved oxygen
Jan 1, 1996
-
Simplicity in Ore Reserve Calculation MethodsThe accurate calculation of ore reserves is one of the most important functions under- taken at a potential or operating mine. In recent years there has been a trend towards recommending more and mo
Jan 1, 1979
-
A Probabilistic Approach to the Design Optimisation of Overburden Slopes at Morwell Open CutBy Rieniets S, Somerville J. L
In Morwell Open Cut brown coal mine, the overburden 'firehole' materials which have resulted from ancient coal fires vary-from hard baked clays to firm laminated lacustrine clays. The need
Jan 1, 1994
-
Misima Mines milling operation: one of the World's lowest cost conventional gold extraction plantsMilling operations at Misima Mine are discussed, with specific reference to the application of energy and cost saving concepts. Design stage innovations and post-commissioning developments are covered
Jan 1, 1994