Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Brisbane Airport Link Earth Pressure Balance Machine Two Component Tailskin Grouting – A New Australian RecordBy A Reschke
The Thiess John Holland Group is undertaking the design and construction of Brisbane’s Airport Link Project, the largest single investment in transportation infrastructure in Australian history. Twin
Mar 8, 2011
-
Maintaining Sample Data Quality Through Robust Quality Assurance and Quality Control ProtocolsSuccessful evaluation and exploitation of resources and reserves relies on the collection of high quality sample data. The quality of the sample data must be maintained through the application of a ro
Mar 1, 2010
-
Better Prediction of Performance of a Slope Using Time-series Monitoring Data at Multiple Points in a Multistep ExcavationBy L M. Zhang, X Y. Li
Surface displacements are routinely monitored at multiple points during slope excavation. The monitoring data reveals the safety status of the slope under current loading conditions. They can be used
Nov 5, 2014
-
The North Strathfield Rail Underpass – Driven Tunnel Design and ConstructionBy E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares
The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,
Sep 17, 2014
-
The Cenozoic Detrital Iron Deposits of the Hamersley Province of Western Australia – A Tribute to Mal KneeshawBy R C. Morris
Two major types of economic secondary iron ores occur in the banded iron formation (BIF)-rich Hamersley Province of the Pilbara, Western Australia:dominant BIF-hosted bedded iron deposits (BID)detrita
Jul 13, 2015
-
Psychological Aspects of SafetyA considerable amount of psychological research has been conducted on human behaviour and its relationship to accidents. However, the research covers very wide fields and the findings drawn are so
Jan 1, 1975
-
Biohydrometallurgy of Gold: Present-Day Status and Future ProspectsBy Groudeva VI
The biohydrometallurgy of gold is based on different processes which could be grouped into four main groups (Attia, Litchfield and Vaaler, 1985; Karavaiko et al, 1988; Groudev, 1990): 1. bacterial o
Jan 1, 1993
-
Occupational Health Effects of Airborne Coal Dust and mine GasesThe last 40 years has seen a dramatic reduction in the prevalence of pneumoconiosis through improved mining engineering associated with continuing medical surveillance of those at risk. Presently t
Jan 1, 1983
-
Gretley Colliery, Miniwall Mining SystemBy McKendry J. B
Gretley Colliery is situated at Wallsend, a suburb of Newcastle in New South Wales and is owned and operated by the Newcastle Wallsend Coal Ccnpany, a wholly owned subsidiary of Peko Wallsend Limi
Jan 1, 1988
-
Some Practical Uses of Non-Linear Programming in Mine PlanningBy Beeforth C. G
The use of Non-Linear Programming to obtain improved schedules of future activity in two specific cases of mining and treatment of minerals is described. The two cases were (i) reclamation of gold,
Jan 1, 1977
-
Numerical Modelling of a Monitored Site in an Underground Coal Mine in the Bowen BasinBy Medhurst TP, Trueman R
The aim of the paper was to model numerically some aspects of the extraction of coal pillars by split and fendering. A two-dimensional elasto-plastic plane strain model with strain softening and in
Jan 1, 1992
-
The Development of the In Stream Analysis System as used at Z.C. MinesBy Freeman NV
The concept of an in stream analysis probe was developed at The Zinc Corporation (now Z.C. Mines) in the late 1960's and commercialised quite rapidly, by Phillips and then AMDEL, as an alternat
Jan 1, 1988
-
The Planning and Methods Used at Selby in the Design of High Productivity SystemsBritish Coal's Selby Complex is the newest producing mine in the United Kingdom. The reasons behind its origins, planning and design are explained. Some detail is given of equipment used, with th
Jan 1, 1991
-
Role of Quality Assurance in Manufacturing of Mining EquipmentCoal Mining machinery has undergone enormous changes in design and complexity of controls in the past 10 years. Specialised, high productivity equipment has been manufactured in Australia, in sufficie
Jan 1, 1991
-
The Planning and Design of the Prospect to Pipehead TunnelThe Prospect to Pipehead Tunnel is a component of the Sydney Water Board's multi-million dollar Drinking Water Quality Program to improve the quality of Sydney's potable water supply to meet
Jan 1, 1993
-
Modern Technology Applied to Wirebar CastingBy Hunter T. C
The wirebar furnacing and casting facility commissioned in 1970 at Copper Refineries Pty. Ltd. (CRL), Townsville, comprising a 70 tonne/ hour ASARCO shaft furnace and a Walker type casting wheel, c
Jan 1, 1977
-
Factors Affecting Ground Support Performance in MiningBy Dugan K. J
Mine operators are currently in a situation where market forces are acting to reduce profit margins and at the same time, regulatory bodies are insisting on improved mine safety and stability. This me
Jan 1, 1992
-
DeGrussa Copper Mine, Western Australia - Feasibility to First Production: A Case Study in Developing a Working Geometallurgy Model from First PrinciplesBy P Vass, C Butler, J Condon, B Hooper
DeGrussa Copper Mine, resource status 10.2 Mt at 5.7 per cent Cu, 2.1 g/t Au (Sandfire Resources, 2013), commenced concentrate production through its 1.5 Mt/a conventional copper flotation processing
Sep 29, 2013
-
Jameson Cell Test Work on Copper Streams in the Copper Concentrator of Mount Isa Mines LimitedBy Griffin PT, Espinosa-Gomez R, Jameson GJ
Two major issues are to be addressed in the Copper Concentrator of Mount Isa Mines Limited. The first of these is the need to increase concentrator flotation capacity to increase copper recovery, wh
Jan 1, 1993
-
The Winner's Curse: Fact or FallacyThe theme of the conference this year is diversification. One way to diversify is through acquisition. The principle underlying the winner's curse is that in competitive bidding situations wher
Jan 1, 1996