Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimising flotation plant operation by using a digital twin in the control room

    By R Tooher, S J. Oliver

    The operation of copper flotation circuit is a challenging task for the site metallurgists and plant operators. To optimise the performance requires meeting both grade and recovery objectives. These p

    Aug 29, 2018

  • AUSIMM
    The Autogenous Fine Grinding Kelsey Axial Displacement (KAD) Mill

    The Autogenous Fine Grinding Kelsey Axial Displacement (KAD) Mill The marginal improvements which continue to be made to fine grinding practices have exposed the limits of conventional technologies a

    Sep 13, 2010

  • AUSIMM
    Optimising Mining Data, With Emphasis on Rock Quality Designation, to Improve Groundwater Modelling of Fractured Rock Aquifers, (Pasminco Rosebery Mine, Tasmania)

    By R Willis, D Cooke, G J. Davidson

    Mine-groundwater interaction at the Pasminco Rosebery Mine (PRM), western Tasmania, deserves special attention due to the unique climate and mining environment present. High rainfall and low evapotran

    Jan 1, 2003

  • AUSIMM
    Computer Simulation of Vibrating Screen in a Dry Classification Circuit Case Study - Gol-e-Gohar Iron Ore Processing Plant

    By A Mehrani, F Zamani, A Dehghani

    Vibrating screens play an important role in the dry classification circuit of Gol-e-Gohar iron ore processing plant. This circuit was designed to classify the autogenous mill discharge and produce a s

    Jan 1, 2007

  • AUSIMM
    Gaskets for Segmental Tunnel Liners - New Development Since the Channel Tunnel

    Elastomeric compression gaskets for segmental tunnel liners are capable of fulfilling all sealing requirements for one pass constructed tunnels.Once the segments are mounted and the gaskets are compre

    Jan 1, 1993

  • AUSIMM
    Technical Considerations of Public Listing and Ongoing Compliance for Minerals Companies

    By P Stephenson, G Mosher, M Berry, C Arnold, P Stoker

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Globally, private minerals companies considering the transition to a public company and ent

    Mar 18, 2015

  • AUSIMM
    Mass Transfer Studies for a Pulsed Disc and Doughnut Extraction Column

    By H R. C Pratt, G W. Stevens

    Hydrodynamic and mass transfer performance are presented for a 72.5 mm diameter pulsed disc and doughnut column of the type used by Western Mining Corporation, Olympic Dam Operation, for the extractio

    Jan 1, 2000

  • AUSIMM
    Key Centre for Mines/International A New Regional Mineral Education Initiative

    The Key Centre for Mines consists of the School of Mines of the University of New South Wales and the Departments of Geology and Civil and Mining Engineering of Wollongong University. The Key Centre f

    Jan 1, 1990

  • AUSIMM
    Prospective Electric Pulse Processes for Sustainable Processing of Mineral Raw Materials

    By V A. Tsukerman

    Prospects a new energy saving method for an efficient destruction of the sturdy and hard materials (rocks, ores, frozen soils, concrete blocks, etc) û the Electric Pulse Discharge (EPD) method of mate

    Jan 1, 2002

  • AUSIMM
    Personal Gravimetric Dust Sampling for the South African Gold Mining Industry

    A review is given of progress made to- wards the development of personal gravimetric dust sampling for risk assessment on South African gold mines. The present strategy is critically examined on th

    Jan 1, 1988

  • AUSIMM
    Rainfall Patterns Rather than Climate Classification Control Cover Design for Closure

    By T Baumgartl, B Richards

    Covers on waste rock and tailings remain the primary choice for closure planning where the purpose is to create an environment where water ingress into reactive material can be controlled and/or preve

    Jun 28, 2016

  • AUSIMM
    Regulation of Overland Flow in Queensland - Implications for the Mining Industry

    By K Marler

    The Water Act 2000 includes provisions to manage the take of overland flow water. Overland flow water is water that runs across the land after rainfall either before it enters a watercourse, after it

    Jan 1, 2006

  • AUSIMM
    The Use of Blasting Models for the Optimisation of Mine Productivity

    By Paine GG

    In coal mining each of the unit operations are interrelated with each preceding operation having an effect on subsequent operations. This presents difficulties for determining when the lowest overa

    Jan 1, 1987

  • AUSIMM
    Simulation and Animation Model for the Millerton Coal Mine (New Zealand)

    A simulation and animation model was constructed for the Stockton Coal Mine. This mine is located in the north western area of the South Island of New Zealand. This model was used to study the optimum

    Dec 6, 2010

  • AUSIMM
    Use of Metallurgical Test Data in Resource Evaluation for Magnetite Deposits

    By J N. Farrell

    Metallurgists frequently use a small number of large samples to characterise expected mill performance, with the a priori assumption that these few samples are representative of the entire deposit. Ge

    Jul 11, 2011

  • AUSIMM
    Design and Construction of Tunnels for Northern Gateway Project, New Zealand

    By M Behrens, A McPhee, B D. Hegan

    This paper describes the design and construction of twin 400 m long road tunnels as part of the Northern Motorway Extension Project in Auckland, New Zealand. Construction of the tunnel civil works is

    Jan 1, 2008

  • AUSIMM
    Valid spontaneous combustion hazard assessment for surface mine environmental impact statements

    By J Theiler, B Beamish

    Spontaneous combustion hazard assessment from an environmental impact perspective is not well understood and is seldom given due consideration in environmental impact statements. In surface mining ope

    Jul 25, 2018

  • AUSIMM
    Banking Needs for Project Development Financing (591555b9-102c-4033-a3e1-dcf0b636a120)

    Some only types of bank finance are appropriate for mining development, with conventional fixed rate finance having significant limitations of flexibility. New, innovative and flexible instruments

    Jan 1, 1983

  • AUSIMM
    Data cross validation for a newly commissioned dynamic drop test facility

    By D W. Evans

    Research into the dynamic properties of ground support elements continues to grow at a global level, given the increasing importance of this field of application within underground hard rock mining. M

    Nov 29, 2022

  • AUSIMM
    Conditional Simulation for Resource Characterisation and Grade Control - Principles and Practice

    By Sjaw WJ

    Conditional simulation is a set of geostatistical tools that is becoming popular as powerful personal computers make the use of these tools less costly. The more familiar set of tools for spatial esti

    Jan 1, 1997