Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Strategy for Managing Acid Rock Drainage in Arid Climates ù The Mt Whaleback StoryBy P Waters, S Miller
BHPBilliton operates the Mt Whaleback Mine located in the semi-arid Pilbara Region of Western Australia. Approximately 200 Mt of net acid generating (NAG) material still remains to be mined. Acid Rock
Jan 1, 2003
-
Pumping Machinery for Mines, with Special Reference to the Plant at the Waihi Mine, N.Z.THE choice of a pumping plant for the drainage of a mine is a matter of such importance that it is obvious that in a short paper it is impossible to go fully into the reasons governing the adoption of
Jan 1, 1912
-
Tungsten-Carbide Drilling Investigations at Morning Star (G.M.A.) Mines N.L.By Clarke P. E
At the end of the recent war, reports became available from Europe of the use of tungsten-carbide inserts in percussion rockdrill bits. These bits were used with small size rockdrills, so that the onl
Jan 1, 1950
-
The Underutilised Role for Economic Geologists and Geochemists in Environmental Aspects of Mineral-Resource DevelopmentBy K S. Smith
Mineral-deposit geology, geochemical processes, and biogeochemical processes are fundamental controls on the environmental conditions that exist naturally in mineralised areas prior to mining, and tha
Jan 1, 1995
-
The Chemical Treatment of Gold Slime for the Recovery of High Purity Gold and SilverThe ready solubility of gold in dilute aqueous solutions of the cyanides of the alkalies or alkaline earths provides a convenient method for the separation of the precious metal -from the large surplu
Jan 1, 1956
-
Nucleation and Early Growth Pertinent to Near Net Shape CastingBy Dippenaar R, Evans T
Twin-roll continuous casting technology is rapidly approaching commercialisation. Fundamentally different than conventional continuous casting, heat transfer and hence solidification during twin-rol
Jan 1, 1999
-
The Geometry of Mineralisation and Exploration Models for the Blackwater Mine in the Reefton GoldfieldAt Waiuta near Reefton there is a remarkable vein of quartz <1 m thick which, apart from small offsets on late-stage faults, is a sheet like body essentially continuous down-dip and along-strike fo
Jan 1, 2000
-
Quality programs (QAQC) on Sample Stations – a prerequisite to achieve standards requirements and perform a robust reconciliationBy O Dominguez
Mine value chain reconciliation (MVC) is a necessary procedure to evaluate a mine’s performance against the assumptions and models used to plan mining and processing operations. Using nomenclature fro
Mar 22, 2022
-
Flotation as an Operation of Macromolecular Mass TransferBy M R. Drumond
The present work presents a new theoretical interpretation of the flotation process, which can also be applied to other mineral processing physical unit operations. This interpretation is part of the
Jan 1, 2005
-
The development and future of BHP Billiton’s Western Australian iron ore geological reconciliation systemBy S J. Loach
Geological reconciliation is an indispensable part of BHP Billiton’s Western Australian Iron Ore (WAIO) operations. Since 2009 our reconciliations have been calculated in a single, centralised sequel-
Jul 24, 2017
-
Developing Assessment Methods and Remediation Protocols for New Zealand Sites Impacted by Acid Mine DrainageBy A Black, A de Jo, J Cavanagh, J Harding
Acidic and metal-rich waters have been discharging from Sullivan Mine, West Coast, New Zealand since the closure of the mine during the early- 1990s. This has resulted in a decrease in pH from a backg
Jan 1, 2003
-
Fluorine Removal From Ok Tedi Copper/Gold ConcentratesBy J W. Glatthaar, M Mavotoi
The occurrence of fluorine in the copper/gold concentrates produced by Ok Tedi Mining Limited has provided a series of challenges to metallurgists since 1988. Although fluorine is distributed througho
Jan 1, 2003
-
Some Valuation Issues Concerning The Preparation of Independent Expert Reports for Mining and Petroleum CompaniesThere has been much debate in the past as to whether the Australasian Institute of Mining and Meteorology ("AusIMM") should issue valuation guidelines in addition to the ASX and NCSC requirements. M
Jan 1, 1989
-
In-Pit Crushing and Conveying System and Dexin Pit Copper Haulage Optimisation for Ore TransportThe output of Dexin Pit Copper is up to 33 million tonnes a year and the final depth is more than 500 m. As a cost reduction measure, the in-pit crushing and conveying system has was introduced to del
Jan 1, 2003
-
The Current State of Automation and Areas for Future Development in the Electrolytic Zinc IndustryThe paper discusses how automation is steadily proceeding throughout all areas of the electrolytic zinc industry. Fluid bed roasters with integral sulphuric acid plants are now on -computer control. H
Jan 1, 1985
-
Combined Pressure Leach Method for the Recovery of the Values from Low-Grade Molybdenite ConcentrateBy K Inoue
The pressure oxidation of molybdenite concentrates in acidic and alkaline media has been studied. The conditions of the selective oxidation of copper and iron sulphide minerals with a quantitative cop
Jan 1, 2000
-
The Application of the Environmental Assessment Prodedures to Licensing for Minerals, Petroleum and Geothermal EnergyBy Thorburn D
This paper reviews the history of environmental assessment in New Zealand with reference to mineral developments. Emphasis is given to larger more controversial projects particularly metal mines. The
Jan 1, 1990
-
Thoughts on Practical Tools for Early Identification of Environmental Challenges Associated With a Mining ProjectTo meet the objectives of sustainable development, mining projects must be executed with minimal environmental risks and impacts. To allow proper actions to be taken, it is helpful if the environmenta
Jan 1, 2003
-
A Computer Program for Selecting the Optimum Combination of Fans and Regulators in Underground MinesBy Mousset-Jones P, McPherson M. J
This paper explains and discusses a computer program developed to deter- mine the optimum combination of fan pressures that will give a required distribution of airflows in a mine ven- tilation sys
Jan 1, 1988
-
A Kinematic Model for the Prediction of Fragment Trajectories and Muckpile Shape during Bench BlastingBy Lilly PA, Kavetsky AP
An empirical, kinematic model is developed which calculates the trajectory of individual blocks of rock in a blast, their point of impact in the muckpile and the final shape of the muckpile. The m
Jan 1, 1986