Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Presidential Address, 1956

    Before presenting this address I desire to express my appreciation of the honour which has been conferred on me by my election as iPresident of The Australasian Institute of Mining and Metallurgy. At

    Jan 1, 1956

  • AUSIMM
    State of Affairs and Current Research Trends in Theory of Sampling Fundamentals, Including Segregation and Correctness

    By D François-Bongarçon

    The theory of sampling (TOS), and therefore representative sampling, is based on three fundamental principles: sample correctness, which handles the search for non-bias; segregation, the effects of wh

    Jul 29, 2014

  • AUSIMM
    Loader Cut and Fill Stoping the Zinc Corporation, Limited and New Broken Hill Consolidated Limited, Broken Hill

    By Bailey DJ

    Loader cut and fill stoping was first used at New Broken Hill Consolidated Limited mine in 1966. The equipment used included single boom pneumatic jumbos for drilling up- holes, diesel loaders for

    Jan 1, 1982

  • AUSIMM
    Government Role in Geoscience - The Queensland Way

    Government geoscience may be categorised by objective under three headings: Applied Research for Geoscientific Framework Studies, Resource Inventory, and Technical Advice. In Queensland, the Departmen

    Jan 1, 1990

  • AUSIMM
    Life Cycle Assessment of Copper and Nickel Production

    By W J. Rankin

    A study of refined metallic copper and nickel production was carried out using Life Cycle Assessment methodology to estimate the life cycle emissions of greenhouse and acid rain gases for these metals

    Jan 1, 2000

  • AUSIMM
    Production Scheduling Optimisation in a Nickel Laterite Deposit:MIP and LP Applications and Infeasibility in the Presence of Orebody Variability

    By R Dimitrakopoulos

    Optimisation and mathematical formulations for open pit design and long-term production scheduling have been available since the 1960s. There are two main concerns in the application of existing mixed

    Jan 1, 2003

  • AUSIMM
    State equity in mining and petroleum projects in Papua New Guinea

    The Mining Act (1992) and the Petroleum Act (1980) provide for the Government of Papua New Guinea (PNG) to take up equity holdings in mining and petroleum projects. The price the Government pays for i

    Jan 1, 1994

  • AUSIMM
    Recognition of Wall Rock Alteration Surrounding Central Victorian Gold Deposits

    By E House, V Lisitsin

    Recent whole-rock geochemical data from nearly 900 fresh drill core and underground samples taken from seven central Victorian gold deposits confirm the presence of distinct and identifiable primary a

    Jan 1, 2008

  • AUSIMM
    Tregoora Gold Project, North Queensland

    The Tregoora Gold Project is centred around the old Mitchell River Antimony Field located 100 kilometres west-northwest of Cairns, North Queensland. The project is currently the subject of a joint ven

    Jan 1, 1986

  • AUSIMM
    Mine Ventilation Network Optimisation Using MINOS

    By Wang Y. J

    This paper describes a more generalised or generic approach for the mine ventilation network problem. More specifically, it defines the network variables in a manner that establishes the network probl

    Jan 1, 1993

  • AUSIMM
    Exploration Philosophy and Future Trends

    Projections of metal requirements for Japan and the United States indicate growing competit- ion for Australia's mineral output and a critical need for continuing discovery of new reserves. Th

    Jan 1, 1973

  • AUSIMM
    The Bucket Wheel Excavator at Goonyella-A Case Study

    Utah's Blackwater mine began operations in 1967. The four CQCA mines controlled by Utah followed over the period 1971 to 1979. Project feasibility studies for all these were based on open cut

    Jan 1, 1983

  • AUSIMM
    Subsidence Prediction from the Beginning - Collie Coal Basin(Western Australia)

    By Evans A, Jones O

    Surface subsidence resulting from "total extraction" of coal in the Collie Basin first occured in 1987 when Western Collieries Ltd trialled the Wongawilli mining method. Because very little quantit

    Jan 1, 1992

  • AUSIMM
    Interferometric Synthetic Aperture Radar (InSAR) and its Potential to Monitor Subsidence Over Caving Zones Induced by Underground Mining

    By H Zahiri

    Utilisation of the InSAR technique for monitoring of subsidence in mining areas, employing open pit and underground mining methods, has large potential due to sensitivity and safety issues associated

    Jan 1, 2008

  • AUSIMM
    Modern Technology in Large Blasthole Drill Design, the Tamrock R110

    The large rotary blast hole drills for hole sizes of 250 to 375 mm in diameter have been utilized by large open pit metal and coal mines for production drilling all over the world. The design of suc

    Jan 1, 1989

  • AUSIMM
    Flotation of copper sulfide minerals and pyrite with new and existing sulfur-containing collectors

    By Wang SS, Frattaroll DR

    In the development of novel sulfide collectors, especially for the low-lime and acid circuits, flotation of chalcopyrite, chalcocite, covellite and pyrite was studied with both new and commerciall

    Jan 1, 1986

  • AUSIMM
    Ore Pass and Chute Maintenance at Xstrata Copper ù Mount Isa Copper Operations

    By L E. Krause

    This paper discusses the considerations for optimum maintenance of critical ore handling infrastructure in order to minimise the cost to the business of maintenance periods. As maintenance periods are

    Jan 1, 2005

  • AUSIMM
    Geostatistics in the Statigraphic Orebodies at Mount Isa

    By Scott IR

    In stratigraphic orebodies, estimation of footwall and hangingwall location is often of more importance than grade estimation. Contoured grade estimates often produce smeared boundaries and the us

    Jan 1, 1986

  • AUSIMM
    The Design and Evaluation of Acid Pickling Inhibitors

    The treatment of steels with acid solutions for the removal of oxide products represents possibly the largest outlet for chemicals in steel processing. Organic pickling inhibitors are required to prev

    Jan 1, 1980

  • AUSIMM
    Ore Selection to Maximise Value

    By J E. Everett

    Ore selection is generally a highly subjective task, with emphasis on producing product with a consistent target grade matching a perceived market requirement. A composite selection criterion ‘Comp’ (

    Jul 13, 2015