Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Valuation of Mineral in the Ground with Particular Reference to ExpropriationState ownership of mineral in the ground is not newthe Regalian Right is an ancient concept. And the compulsory purchase of land and the minerals beneath it by the State or a body approved by the Stat
Jan 1, 1957
-
The Practice and Economics of Heap LeachingHeap leaching for the recovery of precious metals is a comparatively new and rapidly expanding technology. The practical aspects of heap leaching are described and environmental and economic implicati
Jan 1, 1984
-
Aligning Resource Estimates with Mine PlanningBy D Kentwell
A resource model serves two main purposes depending on the stage of a project. The first is to provide an early indication of likely tonnages and grades at certain cut-offs so that decisions can be ma
Nov 24, 2014
-
Iron Isotope Fractionation in Magmatic-hydrothermal Minerals – A Porphyry Copper Case Study from the Batu Hijau Deposit, Sumbawa, IndonesiaBy C M. Wawryk, S L. Garwin, J D. Foden
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Batu Hijau porphyry Cu-Au deposit in south-western Sumbawa, Indonesia is an ideal natur
Mar 18, 2015
-
The Action of Soda on Aluminosilicate RefractoriesThe corrosion of aluminosilicate refractories by soda from three different sources has been studied by microscopic methods. Sodium sulphate from oil ash, sodium chloride used in glazing structural cla
Jan 1, 1964
-
Tarong Power Station Ash Thickening PlantBy C Hertle
GHD-Black & Veatch (GHD-BV) have completed design and specification of the ash thickening plant at Tarong Power Station, including operation of a pilot plant. Construction of the plant is in progress
Jan 1, 2003
-
Remediation Planning at a Derelict Mine Site Affected by Acid DrainageBy J Brisebois
The Wisemans Creek derelict mine site is located in native forest approximately 150 km west of Sydney. Mean annual rainfall at Bathurst, 20 km to the north, is 634 mm and reasonably distributed throug
Jan 1, 2003
-
Preparation of Mine Fill and Disposal of Residue at Zinc Corporation New Broken Hill Consolidated, Broken HillBy Johns AS
Comissioning of a new residue disposal tcluding upgraded classification for none backfill preparation, new variable speed pumps and a new residue dam took place in 1¦76. The system is described.
Jan 1, 1978
-
The Importance of Sampling in the Mineral IndustryBy R J. Holmes
An accurate knowledge of the chemical, mineralogical and physical characteristics of ores and mineral products that are mined, processed and traded is crucial to effective resource utilisation, plant
Jul 15, 2013
-
Iron Ore Ultrafines Challenges and OpportunitiesBy D Tucker, K Harney
Hatch forecasts that an increasing share of seaborne traded iron ore will be ultrafine, being either concentrate or pellet feed. This provides several challenges for the iron and steel industries, but
Jul 13, 2015
-
Fluid flow in discontinuous porous media with special reference to block caving of minesBy A Jafari, N Khalili, M Vahab, P Broumand
This paper presents the implementation of the eXtended Finite Element Method (XFEM) in the general-purpose commercial software package COMSOL Multiphysics for multi-field thermo-hydromechanical proble
Nov 29, 2022
-
Environmental Reclamation Practice in a Brazilian Coal Mine ù An Economical ApproachBy J F. Costa, A Grigorieff
Coal mining reclamation is a worldwide concern. This paper presents a Brazilian example where the economic aspects of reclamation are considered. The basic goal of the study is to transform the reclam
Jan 1, 2005
-
The Geology and Ore-Deposits of the Walhalla-Wood's Point Auriferous BeltThe following thesis is an outcome of an investigation undertaken by the writer, at the suggestion of Professor Skeats, of the dykes and associated auriferous reefs of the Walhalla-Wood's Point b
Jan 1, 1920
-
Geotechnical Reporting at Olympic Dam MineThe need for formalised geotechnical reporting has not been fully explored at many operations. With the continuing need to provide safer and more efficient workplaces, the requirement for good geotech
Jan 1, 2004
-
The Effects of Ore Petrology on Downstream Processing Performance: A ReviewOre petrology will fundamentally determine the types of metallurgical processes employed for ore treatment, their operational efficiency and the nature of processing problems encountered. It is ther
Jan 1, 1998
-
Activity Coefficient of Cobalt Oxide in Non-Ferrous Smelting Slags - A ReviewBy S Jahanshahi, D R. Swinbourne
A knowledge of the value of the activity coefficient of cobalt oxide in slag as a function of composition and temperature is necessary if effective strategies are to be devised to maximise the recover
Jan 1, 1998
-
The Gradation from Amphibolite to Potosi Gneiss in the Broken Hill Mine SequenceMackenzie (1968, p. 167) inferred that amphibolitelayers grade into and may be correlated with footwall Potosi gneiss where it is thin under the thickest development of the "lead lode" in th
Jan 1, 1972
-
Recovery of Arsenic from Lead Refinery ResiduesBy Wauchope AMH
Arsenic residues from BHAS Refinery operations are currently treated to form a calcium arsenic compound and stored in lined dams on site. Laboratory and large scale work on these residues has resu
Jan 1, 1984
-
Environmental Regulation in the Western Australian Mineral Sands Mining IndustryMineral sands make up only 3% of the value of mineral production in WA. However, the distribution of mining operations, close to the more highly populated south-west coastal areas, and the wide range
Jan 1, 1986
-
Experience with the Postgraduate Mining Geomechanics Course by Correspondence at the University of New South Wales School of MinesA Master of Applied Science degree course in Mining Geomechanics commenced in 1983 at The University of New South Wales, taught by extern- al (correspondence) studies. The course is aimed at gradua
Jan 1, 1986