Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Introducing and Sustaining a Continuous Improvement Program in Mines and SmeltersBy M Costa, L Polizzi
Process optimisation and continuous improvement are usually acknowledged when making a process more effective, efficient and transparent. During the last few decades, thousands of companies around the
Sep 1, 2014
-
Back to Basics ù The Way Forward at Pasminco Rosebery MineBy M Freeman
Significant improvements in the metallurgical performance at Pasminco Rosebery Mine have occurred over the last two years. Lead and silver recoveries have increased by more than ten per cent, lead con
Jan 1, 2000
-
Installation of an Automatic Truck Despatch System at Bougainville Copper LimitedIn early 1985, Bougainville Copper Limited commissioned an automatic truck despatch system to control its fleet of 44 trucks and 9 shovels. Productivity gains in the past have been the result of i
Jan 1, 1986
-
Flotation Circuit Analysis at WMC Ltd Olympic Dam OperationBy P Wigley
New methods of analysing and modelling flotation circuits have been developed as part of the AMIRA P9 mineral processing research project. A study using these techniques was conducted on the Olympic D
Jan 1, 2003
-
The Rationale and Evolution of a Post-Graduate Diploma in Minerals Processing Technology at La Trobe University College of Northern VictoriaBy Johnston RF
The motivation for, the structure of, and the overall features of a block release Graduate Diploma program designed for practising minerals engineers are outlined. It is demonstrated that because of
Jan 1, 1993
-
Continuous Improvement at a Large Open Pit OperationOne of the more recent developments within the mining industry has been the adoption of formal continuous improvement programs. A continuous improvement (CI) program was launched across Kalgoorlie Con
Jan 1, 2004
-
Improvement in Australian Bulk MineralsÆ Iron Ore Pellet Quality and Process PerformanceBy M Darby, B Burdett, F Lovell
The results of the process control improvement project aimed at improving the quality of Australian Bulk MineralsÆ (ABM) iron ore pellets produced by four vertical shaft furnaces are very positive. Th
Jan 1, 2005
-
WAD Cynoprobe - A Case Study for the Development of an Online Weak Acid Dissociable (WAD) Cyanide Measurement DeviceBy P Lotz
With the recent increase in environmental awareness, gold mining companies are fast becoming signatories of the International Cyanide Management Code (ICMI, 2007). The objective of the Code is to impr
Jan 1, 2007
-
Use of Backscattered Gamma Radiation for Determining Grade of Iron Ores in Blast Holes and Development Drill HolesBy Wylie A. W, Mathew P. J, Eisler P. L
Field studies of the radiations backscattered by iron ores from a 60Co source of primary gamma radiation located in a borehole logging probe have confirmed thatthe P" factor, a ratio of high ener
Jan 1, 1977
-
Wall Control Blasting Practices at BHP Billiton Iron Ore Mt WhalebackBy C T. Dunbar, P A. Walker, G E. LeJuge
A programme of blast improvement was initiated at the Mt Whaleback iron ore mine by BHPIO management in early-1998. One component of that work was the need to improve wall control blasting practices t
Jan 1, 2001
-
Technological Solution to Improvement in PGM Recovery, Upgrade Ratio and Cr<sub>2</sub>O<sub>3</sub> Reduction of UG 2 OreBy A N. Terblanche, D S. Smit
The paper discusses the improvements achieved after an external sparger flotation column, 1.42 m diameter by 9.5 m high, was installed as a re-recleaner unit at the Northam Platinum LtdÆs UG 2 plant i
Jan 1, 2005
-
Equipment Application to the Smaller Underground Mining Operations (d8943677-4201-469d-bc5d-d1682f128fb6)Mining companies in order to compete and succeed in being viable business propositions must look to the future and select mining methods which guarantee improved efficiency and productivity as well as
Jan 1, 1990
-
A Dynamic Sediment Simulation to Predict the Variability of Suspended Solids Concentrations over Life-of-Mine for Application to a Risk-based Environmental AssessmentBy M Ind, B Usher
Environmental regulators are increasingly adopting risk-based approaches to protect aquatic ecosystems. The Australian and New Zealand Environment and Conservation Council (ANZECC) and the Agriculture
Jul 16, 2014
-
Logistics in Mining Towards 2000 'The Low Cost Provider'A combination of the needs of business, employee desires and safety and health considerations is stimulating increasing attention to the time spent by people at work and the timing of that work. Pa
Jan 1, 1996
-
Productivity and safety improvements supported by MST’s ImPact System at Glencore’s Mount Isa Copper OperationsBy D Kent, J Bullock, M Wilkinson
Over the last few years at Glencore’s Mount Isa Copper Operations (MICO) mining conditions have become increasingly challenging through lower head grades and higher work indices. MICO has had great su
Oct 16, 2017
-
The Evolution of Stope Backfill at Olympic Dam OperationsBackfil ling of excavated Sub Level Open Stopes has been underway since March 1989 and as at December 1992 some 1 100 000 cubic metres of Cemented Aggregate Fill have been placed. During these three y
Jan 1, 1993
-
Mining Operational Effectiveness ù An Argyle Diamond Mine Case Study 2002Operational effectiveness is fundamental to any operation, becoming highly topical in those experiencing less than optimal output from their fleets. It is all encompassing aiming to identify those fac
Jan 1, 2003
-
Equipment Application to the Smaller Underground Mining OperationsMining companies in order to compete and succeed in being viable business propositions must look to the future and select mining methods which guarantee improved efficiency and productivity as well as
Jan 1, 1990
-
The Petroleum Industry's Future Self-Sufficiency and Taxes- A ReviewThe performance of the Australian Mining Industry over the past 10 years using key indicators of production, revenue, aftertax return investment, together with key cost elements, market changes and
Jan 1, 1987
-
Live Track Railroad Tunnel Repair and Clearance Improvement in the United StatesBy J Schrank
Double-stack trains in the United States date back to the early 1980s, starting about the time deregulation of the rail industry occurred. Freight rail became increasingly more competitive to trucking
Sep 17, 2014