Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    The successful deployment of a fatal risk system, designed for the front-line

    By C J. Pitzer

    The prevention of fatal risks is a key objective for the global resources industry, especially considering poor performance with regard to fatality rate reduction and the continued occurrence of mine

    Mar 29, 2023

  • AUSIMM
    Design of raise caving operations in LKAB mines

    By T Ladinig

    Raise caving is a novel cave mining method, which has been proposed for mass mining at increasing mining depths in LKAB operations. The method makes use of the raise mining technology and an active st

    Mar 29, 2023

  • AUSIMM
    The future is electrifying – introduction of a battery electric loader to CSA Mine

    By M Ireland

    Extensive use of diesel-powered mobile equipment in modern mines for materials handling, such as load-haul-dump machines, constitute a significant source of heat, exhaust gases and diesel particulate

    Mar 29, 2023

  • AUSIMM
    Black Rock Cave (BRC) – overcoming challenging ground conditions and mitigating the impacts to production

    By H Wright

    Black Rock Cave (BRC) is a sublevel cave which was developed in 2018–2020 and has been in production since November 2020. BRC is part of the Mount Isa Mines complex and extracts a leached orebody comp

    Mar 29, 2023

  • AUSIMM
    No entry mechanised presink of the Wira Hoisting Shaf

    By D Kilkenny

    This paper discusses the use of a mechanised shaft sinking machine Herrenknecht Vertical Shaft Sinking Machine (VSM) – to conduct the 93 m presink for the Wira Hoisting Shaft at the Prominent Hill Min

    Mar 29, 2023

  • AUSIMM
    E26 Lift 1 North block cave development and construction

    By R Cunningham

    The E26 Lift 1 North Project took 37 months from the approval on 1st January 2019 to the commencement of production on 1st March 2022. This was five months ahead of the feasibility plan. When compared

    Mar 29, 2023

  • AUSIMM
    Underground mining subsidence in mine planning and risk assessment for cave mining

    By P M. Cepuritis

    In hard rock mining, large-scale bulk mining methods such as block or panel caving (BC/PC) and sublevel caving (SLC) typically generate significant surface deformations such as subsidence. Surface def

    Nov 29, 2022

  • AUSIMM
    A design and construction methodology for deep mine development

    By E Villaescusa, C Drover

    The stability of access tunnels is one of the main engineering challenges in deep underground mine construction. Many underground hard rock mining operations are now reaching depths where the induced

    Nov 29, 2022

  • AUSIMM
    Support structure design for rock burst damage restraint initiated by a low-intensity seismic wave

    By E Kabwe, M Karakus

    Deep hard rock underground mines tend to experience high stress as such drives exhibit dynamic responses attributed to a rock burst variant (strainburst). This dynamic behaviour is difficult to predic

    Nov 29, 2022

  • AUSIMM
    Data cross validation for a newly commissioned dynamic drop test facility

    By D W. Evans

    Research into the dynamic properties of ground support elements continues to grow at a global level, given the increasing importance of this field of application within underground hard rock mining. M

    Nov 29, 2022

  • AUSIMM
    Admixture use in cemented rock fill

    By B Roache, J O’Brien, M Gray

    Admixture use in cement products is commonplace in the construction and mining industries. Many Australian mines have an operational concrete batch plant and stock hydration control and water reducing

    Nov 29, 2022

  • AUSIMM
    Mechanism analysis and particle flow simulation of water-sand inrush in thin bedrock working face

    By S Li, Y Lei, X Wu, C Ma, W Q. Zhang

    The failure of roof of thin bedrock working face under loose aquifer in a coalmine can lead to water-sand inrush disaster. Based on the accident of water-sand inrush in 30108 working face of a mine in

    Nov 29, 2022

  • AUSIMM
    Development of a damage/failure mechanisms database for Kazakhstan underground mining industry

    By A Mortazavi, M Akhmedya

    Mining is recognised as being one of the most dangerous industries in the world due to the difficult working conditions. Working in such hazardous circumstances in an underground mine often results in

    Nov 29, 2022

  • AUSIMM
    Creep properties and energy evolution characteristics of weakly cemented rock under step loading

    By C X. Zhang, W K. Ru, S C. Hu

    To study the creep properties and the energy evolution characteristics of the weakly cemented rock (WCR) in western China, the creep deformation damage law of weakly cemented mudstone (WCM) under grad

    Nov 29, 2022

  • AUSIMM
    Integration of Geoblast and D&B Engineering as an engineering tool in PT. Indo Muro Kencana

    By H Utama, hi, A Suw

    PT. Indo Muro Kencana (PT.IMK) is gold and silver mine located in Central Kalimantan province, Indonesia. Mining activities in PT.IMK is conducted in Bantian pit area by applying surface mining method

    Nov 29, 2022

  • AUSIMM
    An empirical system for primary and secondary support in US coalmines

    By C Mark, Z Agioutantis

    This paper presents an empirical design methodology that is based on successful US roof support systems using both primary and secondary support in coal mining entries and intersections. The recent na

    Nov 29, 2022

  • AUSIMM
    Formation of fracture zones under static and impact loading conditions and their characteristics

    By S Kodate, Ö Aydan, Y Suda, J Tomiyama

    Fracture zones are commonly found in the Earth’s crust. These zones may cause very severe engineering problems. Therefore, the formation and the assessment of the mechanical characteristics of these z

    Nov 29, 2022

  • AUSIMM
    Optimal slope profiles for maximum mine pit-wall steepness in banded iron formation rocks

    By S Utili, A Agosti

    The Overall Slope Angle (OSA) of pitwalls plays a crucial role in the financial return of an open pit mine. In current practice, pitwall profiles are designed to be planar in cross-section within each

    Nov 29, 2022

  • AUSIMM
    Evaluation of rock joint on construction tunnel face using convolutional neural network

    By H Kusumi, A Nishio, K D. Halim, Y Yun

    In Japan, evaluation of rock mass is crucial in mountain tunnels that are constructed using the NATM (New Austrian Tunneling Method) to determine the support pattern that in turns determine the final

    Nov 29, 2022

  • AUSIMM
    Analysis of horizontal opening stability in lunar regolith

    By N Barnett, M Dello-lacovo, J Oh, S Saydam, T Pelech

    In-Situ Resource Utilisation and Off-Earth mining require the application of horizontal drilling. The stability of such openings is challenging when excavating in the lunar regolith. Excavations on th

    Nov 29, 2022