Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Mining method, and controls, to cut back a failed slope at KCGMs Fimiston Pit (KCGM Superpit)

    By C E. Woolley, H Jebaliya, J Foster

    The East wall of the Kalgoorlie Consolidated Gold Mines Fimiston Open Pit (KCGM Superpit) has a history of wall instabilities impacting mining operations; the most significant of which occurred in May

    Jun 22, 2022

  • AUSIMM
    The use of collaboration and management to turn-around the performance of a failing copper mine

    By M Jacobs

    This abstract discusses a heap leach copper mine that was failing to perform and as a result was not meeting targeted production. The mine had numerous technical challenges including: high water inflo

    Jun 22, 2022

  • AUSIMM
    A tailored solution to determine plant capacity using strategic analysis

    By J Nortier, J Dray

    There is no single factor that determines the appropriate capacity for a mining project. It is driven by the size of the resource, the capacity of the market, the availability of capital, the availabi

    Jun 22, 2022

  • AUSIMM
    The role of fleet management in reducing carbon emissions from haul trucks

    By D Prior

    The Australian mining industry is a significant contributor to the nation’s greenhouse gas (GHG) emissions, and like any industry, it must make efforts to reduce these. Medium- and long-term strategie

    Jun 22, 2022

  • AUSIMM
    Transition from owner mining to contract mining – a structured tender process using a holistic approach

    By Y G. Anoman

    This paper discusses the operating model within Endeavour Mining Corporation regarding the options of owner mining against contract mining. It’s based on the concept of ‘are we carrying out the most e

    Jun 22, 2022

  • AUSIMM
    The application of digital twin machine learning models for Mine to Mill and Pit to Plant optimisation

    By X Hu, Z Pokrajcic, R Embry, P C. Stewart, J Carpenter, E Jones

    Whilst the value of Pit to Plant and Mine to Mill optimisation has been proven since the 1990s, sustaining the productivity and efficiency gains typically requires ongoing test work, blast trials, pla

    Jun 22, 2022

  • AUSIMM
    Managing uncertainty in large open pit geotechnical modelling

    By R Hao

    Uncertainties in large open pit geotechnical modelling has been a major concern for slope stability analysis. The level of confidence in the in-put assumptions, such as structural and rock mass model,

    Jun 22, 2022

  • AUSIMM
    Managing remediation, and risk of failure, to complete extraction of a short life open pit

    By C E. Woolley, A Hosseini, J Foster

    Northern Star’s Thunderbox Open Pit C-Zone cutback was designed to maximise extraction in a short life excavation; In fresh rock on the western wall this included 20 m to 30 m bench heights with 6.5 m

    Jun 22, 2022

  • AUSIMM
    Should earthquake loading be considered for open pit slope design in Australia?

    By F Weir, B Estrada

    The impact of seismic loading on open pit slope stability in Australia is often only considered where the slopes are located adjacent to tailings facilities or other major infrastructure. The debate r

    Jun 22, 2022

  • AUSIMM
    Social licence to operate – circular economy

    By L Schürmann, R Kendall

    Social licence to operate is becoming part of a mining company’s DNA in the same way as health and safety. Consequently, mining companies are receiving increasing pressure from their shareholders to e

    Jun 22, 2022

  • AUSIMM
    Slope stability is a critical issue for the open pit mining community

    By M Edgar, G Pattemore, M Auad, K Job, A Job, S Gale

    In recent decades, significant advances have improved the modelling techniques for predicting slope failure. Predicting failures is vital in open pit mining due to the significant risk posed to person

    Jun 22, 2022

  • AUSIMM
    Dredger drop impact on slope stability – Hazelwood Mine

    By J Stipcevich, N Patel, J Faithful5, S Narendranathan, L Tatnell4

    ENGIE, the current owner and operator of the Hazelwood Open Cut coalmine, are in the process of rehabilitating the mine site in preparation for mine closure. Bucket wheel excavators (dredgers) used du

    Jun 21, 2022

  • AUSIMM
    Is your risk management system providing you an accurate view of risks?

    By S Garnes, W Austerberry, S Fraser

    Despite significant investment in safety in the mining industry (mostly focused on processes and systems), many companies are unable to sustain and further improve their performance resulting in conti

    May 5, 2022

  • AUSIMM
    Leading people to use their brain as PPE

    By C Sylvestre

    Leaders have invested heavily in traditional safety management to improve safety performance over the years. This primarily involved: • fixing the environment (eliminating the hazard) • improving the

    May 5, 2022

  • AUSIMM
    Operation of mobile plant near underground voids

    By W Ilahi

    Underground metalliferous mining methods often result in the formation of vertical openings to facilitate the extraction of orebodies. These development and production techniques can result in the cre

    May 5, 2022

  • AUSIMM
    What do High Reliability Organisational principles look like in practice in Queensland mines?

    By M S. Tuohy

    Since the independent review of fatal accidents in the mining industry carried out by Dr Sean Brady (the ‘Brady Review’), High Reliability Organisations (HROs) and their operating principles have been

    May 5, 2022

  • AUSIMM
    Dust characterisation in Australian mines

    By N LaBranche

    The resurgence of Silicosis and Coal Worker’s Pneumoconiosis (CWP) in coalmines has placed the spotlight back on the management of worker exposure to particulate matter across all mining sectors (Coal

    May 5, 2022

  • AUSIMM
    Creating meaningful and measurable lead indicators for safety

    By A Gibbs

    The mining sector has been a leader in investing in safety improvement initiatives, yet relatively few mining organisations can accurately track the positive effects of these initiatives or identify a

    May 5, 2022

  • AUSIMM
    Safety is all around – state-of-the-art underground mining safety with Mobilaris Mining Intelligence

    By A Prill

    Safety First and zero accidents are the targets most mines in Australia are aiming for, but manual processes and procedures limit the capabilities and response time in emergency situations. Even with

    May 5, 2022

  • AUSIMM
    Managing major mining risks using bow-tie analysis

    By B Beale

    Bow-tie analysis is a commonly used tool in the Major Hazard Facility sector to identify, display and control risks that have the potential to pose serious harm to personnel. It is a simple but powerf

    May 5, 2022