    The Effect of Blast Design on the Lump:Fines Ration at Marandoo Iron Ore Operations

    By Chapman J, Kanchibolta S. S Poetschka N L

    A field study was undertaken at Marandoo iron ore operations to investigate the effect of blasting on the lump/fines ratio. Three blasts, each in a different ore domain were monitored and the blaste

    Jan 1, 1998

  • AUSIMM
    Recent Developments and Trends in Backfill Practices in Canada

    Planning of modern mines entails considerable challenges in the areas of ground control, materials handling, safety, environment, equipment and personnel. Many orebodies are not economical unless effi

    Jan 1, 1998

  • AUSIMM
    Integration of a Microseismic Monitoring System in Mining the Pasminco Broken Hill Southern Cross Area

    By K P. Tully

    In August 1996 a Microseismic Monitoring System developed by ISS International Limited was installed at the Pasminco Broken Hill Mine -Southern Cross area. The project aims were to:Assist in daily saf

    Jan 1, 1998

  • AUSIMM
    Role of On-Line Analysis in Quality Control of Iron Ore

    By P J. Mathew

    Quality and process control in the iron ore industry is based on measurements of ore grade from blast holes through to shiploading. Traditionally this has been carried out using conventional sampling,

    Jan 1, 1998

  • AUSIMM
    Optimum Drill and Blast

    The traditional concept of optimum drill and blast is that it is achieved when ore is produced at the lowest unit cost and, because of the complexities of most mining operations, represents a band w

    Jan 1, 1998

  • AUSIMM
    Going Underground - The Evolution of the Oaky Creek Mining Complex

    The evolution of the Oaky Creek mining complex provides a good example of the mining cycle in practice. Oaky Creek has been innovative in its choice of mining methods, with virtually the full range of

    Jan 1, 1998

  • AUSIMM
    Monitoring of the Performance of a Crushed Waste/Classified Tailings Backfill for Shaft Pillar Pre-extraction in the South Deep Section, Western Areas Gold Mine

    By S Z. Petho

    The South Deep surface shaft system is being sunk to a final depth of 2750 m below surface and on completion will be the deepest single drop shaft in the world. The shafts will intersect the target re

    Jan 1, 1998

  • AUSIMM
    The Effects of Ore Petrology on Downstream Processing Performance: A Review

    Ore petrology will fundamentally determine the types of metallurgical processes employed for ore treatment, their operational efficiency and the nature of processing problems encountered. It is ther

    Jan 1, 1998

  • AUSIMM
    The Investigation of High Density and Paste Fills for the Enterprise Mine Expansion Project at Mount Isa (ee90997b-915a-4723-962c-df13e11cf8b6)

    By Kuganathan K, Potvin Y

    Enterprise Mine at Mount Isa is to expand ore production from the current 1.4 to 3.5 mtpa by mining the 3500 Orebody, from which production is scheduled to start in February 1998 making this the dee

    Jan 1, 1998

  • AUSIMM
    Sublevel Open and Fill Stoping Method Used in the Hedong Gold Mine (9bf3555f-32de-4bf1-9441-2d6607584635)

    By Wang J, Ma Y, Jia H

    The Hedong Gold Mine is located in the Yan(ai area, tihandong hroo%ill, e. China. It is an underground mine with an annual gold output of some 700 0(H) grams. The orebody is located on the edge of t

    Jan 1, 1998

  • AUSIMM
    Remote Mining in the Canadian Arctic - The Falconbridge Limited Raglan Experience

    In February 1995, Falconbridge Limited approved the construction of a nickel mining and milling facility on its Raglan property situated in the Nunavik region of northern Quebec, Canada. The construct

    Jan 1, 1998

  • AUSIMM
    Flow Loop Testing of Different Paste Mixtures at Neves Corvo Mine, Portugal

    By M Byrne, P Newman, M Lindqvist

    SomincorÆs Neves Corvo Mine, one of the largest copper producers in Europe, is currently constructing a paste backfill plant in order to replace cemented rockfill in its bench and fill stopes and poss

    Jan 1, 1998

  • AUSIMM
    Getting Value From R&D

    New knowledge has no economic value unless it can be applied, or æcapturedÆ, as the R&D jargon has it. Australia probably spends more than $500 m per year on mineral industry R&D, distributed amongst

    Jan 1, 1998

  • AUSIMM
    New Development of Cemented Fill in Various Chinese Metal Mines

    By Sijing Cai, Chengpu Zhou

    The requirement of mineral resources is increasing as the economy is continually increasing in China. The mining practices of various complex sulphide deposits and precious metal deposits, and the tre

    Jan 1, 1998

  • AUSIMM
    Waihi Gold - Extended Project

    By M Maguire

    The purpose of this paper is to provide an illustration of the Resource Management Act processes at their best. Many of you will be aware of the Martha Mine situated in the middle of Waihi Township in

    Jan 1, 1998

  • AUSIMM
    Bench Stoping at Mount Isa Mines Limited Isa Lead Mine - Mount Isa, Queensland

    By J Robinson, D Herbert

    Bench stoping operations at the Isa Lead mine have been underway for over 11 years. They were implemented to address safety, productivity and mining cost concerns noted with cut and fill mining operat

    Jan 1, 1998

  • AUSIMM
    Introduction of Battery Powered Coal Haulers into Board and Pillar Panel Production

    Powercoal Pty Ltd operates eight underground coal mines in New South Wales and produces coal for both domestic power stations and the export market. Approximately 40% of total production is from conti

    Jan 1, 1998

  • AUSIMM
    The Myth of Mine Reconciliation

    Mine reconciliation is the practice of comparing the tonnage and grade of material processed by the mill with the tonnage and grade of ore in the reserve model of a deposit, and with the tonnage and

    Jan 1, 1998

  • AUSIMM
    2001 is Here Now - Teleoperation and Automation of UG Vehicle

    Teleoperation is one method by which an operator can remotely control and monitor a vehicle. The operator monitors the status and progress of the remote vehicle by watching the video transmitted from

    Jan 1, 1998

  • AUSIMM
    Description of the Shear Stree Distribution around and Excavation at WIPP

    The estimation of the shear stress distribution around an excavation is important to the design of the excavation since shear stresses can generate cracks, loosen grain boundaries or otherwise degrade