Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    The Planning and Design of the Prospect to Pipehead Tunnel

    The Prospect to Pipehead Tunnel is a component of the Sydney Water Board's multi-million dollar Drinking Water Quality Program to improve the quality of Sydney's potable water supply to meet

    Jan 1, 1993

  • AUSIMM
    The Strategic Role of Mineral Processing for BHP Minerals

    BlIP Minerals is a large, diversified, international mineral producer. This paper describes the company's operating strategy, and identifies the role of mineral processing in this strategy thro

    Jan 1, 1993

  • AUSIMM
    The Contribution of Geology to Achieving Mining Performance at Hilton Mine

    By Dennis B

    The Hilton Mine, 20 km north of Mount Isa was discovered in 1947. The underground mine has been a significant producer from 1989. The long development history is the result of complex orebody geometry

    Jan 1, 1993

  • AUSIMM
    Centrifugal Flotation of Coal at Particle Sizes Below 20 ?m

    By Bothe C

    Froth flotation processes use different surface properties of the minerals to be sorted. In an aqueous environment the hydrophobic mineral attaches selectively to air bubbles and is lifted to the s

    Jan 1, 1993

  • AUSIMM
    Ministry of Commerce Investigation into the Mineral Resources of the Proposed Northwest South Island National Park - A Summary

    By W L. Jennings

    This paper summarises work undertaken to date as part of an investigation into the mineral resources of the proposedNorth West South Island National Park. The area covered by the proposed national par

    Jan 1, 1993

  • AUSIMM
    Drilling Six Ventilation Shafts for the Porgera Goldmine

    Difficult ground conditions in the area planned for placement of vent rises to the surface at the Porgera Goldmine led engineers directing the project to chose blind shaft boring methods of shaft cons

    Jan 1, 1993

  • AUSIMM
    Coolgardie Gold NL - William Ford Decline: Narrow Vein Sub-Level Up-Hole Mechanised Stoping and Long Hole Rise Blasting Practices

    By Will D

    This presentation is to outline the current practice of mechanised stoping a one-metre wide, gold bearing ore body to optimise fragmentation, minimise dilution and reduce stoping costs.Coolgardie unde

    Jan 1, 1993

  • AUSIMM
    A New Mine Project - The 3000 and 3500 Copper Orebodies at Mount Isa

    The large, high grade 3000 and 3500 copper orebodies at Mount Isa lie greater than 1200 m below the surface, and partly beneath the silver-lead-zinc mining operations at the Isa Mine.Since discovery o

    Jan 1, 1993

  • AUSIMM
    The Role of Geologists in the Mining of Structurally Complex Narrow Vein Ore Deposits

    The narrow quartz vein deposits at Konongo and Ghana Main Reef gold mines in Ghana were emplaced during the plastic flow cross folding of pre-existing sub-isoclinally folded volcanic and perivolcanic

    Jan 1, 1993

  • AUSIMM
    Recovery and Removal of Uranium by Using Biosubstances

    By Nakajima A

    Some attempts were made to recover uranium from aqueous systems by using various biosubstances including microbial biomass. Of hundreds species of microorganisms tested, extremely high uranium absor

    Jan 1, 1993

  • AUSIMM
    The Potential for Cut-and-Break Roadheading Machines in Tunnelling

    This paper describes the principle of cut-and-break rock excavation, in which rock is first undercut, and the undercut material is subsequently broken free by a wedging action. The current work on cut

    Jan 1, 1993

  • AUSIMM
    Environmental Concerns in Operating a Mine

    The passage of a vast array of new State and Federal environmental legislation over the last couple of years has required many mine operators to sharpen their focus on environmental requirements. Esta

    Jan 1, 1993

  • AUSIMM
    Grinding, Pulp Chemistry and Particle Flotability

    In this paper the reactions which may lead to particle hydrophobicity/hydrophilicity as a function of grinding environment-are reviewed. The results of pulp chemical investigations related to a Cu-

    Jan 1, 1993

  • AUSIMM
    Density Separations in Heavy Inorganic Liquid Suspensions

    By Hall ST, Miles NJ

    Recently an inorganic salt, sodium polytungstate (SPT), has become available that allows the preparation of non-toxic solutions of relative densities up to 3.1. It is relatively expensive and at th

    Jan 1, 1993

  • AUSIMM
    Metallurigical Considerations in grade Control

    Grade control is an important factor in the on-going success of a mining operation. Grade control criteria will vary depending on the commodity being mined. Financial considerations determine the actu

    Jan 1, 1993

  • AUSIMM
    Remote Sensing and Image Processing - What is Available in New Zealand in 1993

    The status of remote sensing data availability in New Zealand is outlined and discussed. Currently, two multispectral remote sensing satellites are providing regular data over New Zealand; aircraft sc

    Jan 1, 1993

  • AUSIMM
    Waste Processing in the Zinc Industry Using Ausmelt Technology

    By Robbilliard K. R, Floyd J. M

    The problems facing the metallurgical industry from the viewpoint of the range of unacceptable residues, flue dusts and slags currently produced from the electrolytic zinc process, electric arc furn

    Jan 1, 1993

  • AUSIMM
    Waste Rock Geochemistry as an aid to the Development of Cost-Effective Mine Waste Planning and Rehabilitation Strategies

    The geochemistry of waste rock from mining operations is critical to the development of acidity-related environmental problems during mining operations, and following mine closure. Failure to recognis

    Jan 1, 1993

  • AUSIMM
    Geology and Genesis of the Tom Deposit, Yukon, Canada

    The Tom, East and West zone, stratiform Zn-Pb-Ag deposits at Macmillan Pass, Yukon, Canada were discovered by Hudson Bay Mining and Smelting Co Ltd prospectors in 1951. Further exploration, includin

    Jan 1, 1993

  • AUSIMM
    Mineral Processing Design and Simulation Using Geostatistical Modelling of Ore Characteristics

    By Guarascio M, Massacci P

    In process simulation, more reliable prediction of industrial results and evaluation of data for design purposes and process optimisation may be attained by the combined use of: the modelling and si

    Jan 1, 1993