Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Experience with Capping of Tailings Storage Facilities for Decommissioning Projects in Australia
By W Ludlow, C Harrington
This paper presents an overview of the design and construction challenges to implement capping systems on Tailings Storage Facility’s (TSF) based on recent projects in Australia. Key aspects discussed
Jul 23, 2018
-
Dingo – an optimisation tool to solve complex short interval control at Telfer underground mine
By S Graskoski
The allocation of boggers and trucks at Telfer’s sublevel cave mine is currently assigned by manual techniques, with decision-making primarily dependant on the judgement of the operators and mine cont
Oct 16, 2017
-
Vertical and inclined raise bore performance at Dugald River mine
By M Lee, J F. Carswell, G Reitsema
"The increased costs of underground mining have continually challenged engineers to identify opportunities for alternatives to common approaches to underground development. Considerations to the desig
Oct 16, 2017
-
Increasing stope recovery in an underground gold mine by using effective analysis, corrective action and employee engagement processes
By R F. Cota, C Freeman, A Heberle
"The Lamego mine is an underground gold mine in the Iron Ore Quadrangle in Minas Gerais state, Brazil. The mine produces 48 to 50 koz per annum, as part of the larger Cuiabá-Lamego Complex. This combi
Oct 16, 2017
-
Innovations in underground hard rock operator efficiency – through simulation-based training technologies and processes
By J A. de la Torre, I R. Cerna, G K. Karadjian
The La Colorada underground mine in Zacatecas, Mexico is a mechanised cut-and-fill silver mine with a capacity of 1250 t/d. The project focused on training the mine’s experienced operators for a fleet
Oct 16, 2017
-
Improving the prediction of stope hanging wall dilution – a critical factor to the success of Dugald River
By J Player, R de Vries, J F. Carswell, R Hassell
"The feasibility of Dugald River mine was highly sensitive to mining and geotechnical design assumptions, particularly stope dilution and strike length. Following the start of initial mine development
Oct 16, 2017
-
Towards an understanding of production costs at Australia’s underground gold mines
By A Trench, S Ulrich, S Hagemann
A synthesis of reported All-In Sustaining Costs (AISC) for 57 Australian gold mines in the period 2014–2016 reveals for the first time the clear influence of grade upon cost performance, most evident
Oct 16, 2017
-
Inflows into longwall mines from inundated overlying workings
By S Winter, G Klenowski
During longwall mining in the Bowen Basin, open tension cracks formed by overburden subsidence occur to a height of about 175 m above the mining horizon. Within this zone, water in aquifers or inundat
Oct 16, 2017
-
Improving safety through technology – Orica wireless electronic blasting system trials at Ernest Henry Mine
By S Thomson, M Lovitt, T Purvis, C te Kloot, T Nguyen, Z Liu
Ernest Henry Mine (EHM), located in north-western Queensland, is an underground copper/gold sublevel caving operation currently producing over 6 Mt/a of ore. The mass mining method of sublevel caving
Oct 16, 2017
-
Risk assessment tool for mines using diesel-powered mobile equipment
By A Reid, A W. Musk, O Jones
In this paper, the authors attempt to bridge the gap that currently exists between the duty-of-care responsibilities of underground mining industry personnel, and the multifaceted health challenges fa
Oct 16, 2017
-
Hot water management at PT Nusa Halmahera Minerals’ Toguraci Mine
By J Isles, S King, A Valenza, R Lawolo, J Evert
PT Nusa Halmahera Minerals (PT NHM) is an Indonesian joint venture company owned by a subsidiary of Newcrest Mining Limited (75 per cent) and PT Aneka Tambang (Persero) (25 per cent). PT NHM operates
Oct 16, 2017
-
Productivity improvement through collaborative shift planning and tracking
By E Deucker, A White
Gold Fields Australia (Gold Fields) has identified that improving productivity through more detailed shift planning and operational control of mining activities is a key driver to the success of their
Oct 16, 2017
-
The evolution of production blasts at Ernest Henry Mine
By C te Kloot, Z Liu
Blast performance and the resulting drawpoint condition and volume of oversize has the potential to impact operator safety and mine productivity. Underground measurements showed that approximately 14
Oct 16, 2017
-
Attractive workplaces in future underground mining
By J Johansson, B Johansson
The mining industry needs to attract and recruit young talented people. An important task is, therefore, to create an attractive mining workplace that engages with, and motivates youngsters who are no
Oct 16, 2017
-
Improving calibration of flow models against SLC marker trials by linking blasting effects to particle mobility
By A D. Campbell, G R. Power
Many caving mines use numerical flow models to simulate mine production, forecast recovered ore grades and optimise the draw strategy. In sublevel caving (SLC) mines, the effects of blasting and fragm
Oct 16, 2017
-
Improving the performance of blind uphole rises at Ernest Henry Mine – a case study
By T Purvis, Z Liu
Ernest Henry mine (EHM) is an underground sublevel caving mine located in north-west Queensland with a production rate of 6.4 Mt/a. The mine has sublevels spaced with a 25 m vertical interval. The pro
Oct 16, 2017
-
Productivity and safety improvements supported by MST’s ImPact System at Glencore’s Mount Isa Copper Operations
By D Kent, J Bullock, M Wilkinson
Over the last few years at Glencore’s Mount Isa Copper Operations (MICO) mining conditions have become increasingly challenging through lower head grades and higher work indices. MICO has had great su
Oct 16, 2017
-
Fatigue risk in your operations – real or rubbish? It actually depends
By T Dawson, B Haskins
Fatigue is it the newest buzz word or is fatigue a real phenomenon that is creating safety and organisational risk for you? There is no debate that fatigue is natural, and it affects us all, just lik
Oct 16, 2017
-
Mt Wright – managing unique risks
By S Long, D Carnovale, L Louwrens
The Mt Wright underground mine (MTW) is located near the town of Ravenswood in north Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited.The Mt Wright
Oct 16, 2017
-
Technology change in underground mining – things to consider
By A G. L Pratt
Change and its relationship with the introduction of new technology is a constant of human history. The mining industry has many examples of this relationship. This record contrasts with its present d
Oct 16, 2017