Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Lucky Friday’s No. 4 Shaft - Ten Years from Concept to Completion

    By David Berberick

    "Hecla Limited’s No. 4 Shaft at the Lucky Friday Mine is the largest capital expenditure in the corporation’s 128-year history and is considered the deepest shaft in the United States. This paper will

    Jan 1, 2019

  • CIM
    Renewal of the Saganoseki Flash-Smelting Furnace

    By Yuki Soma, Tsutomu Ogawa, Jae Hyung Hong, Toshihiro Nagato

    The Saganoseki flash furnace was built in 1973. The steel frames of the flash furnace were designed to absorb the expansion of refractories and contain expansion-absorbing materials between their fram

    Jan 1, 2019

  • CIM
    New Opportunities for Closed Mining Sites: Bioprospecting for Antibacterial Agents

    By G. N. A. Senhorinho, J. A. Scott, C. A. Laamanen

    "Closed mine sites are widely regarded as a negative asset due to their legacy of environmental impacts. These sites are often characterized by waterbodies with elevated metal concentrations and low p

    Jan 1, 2019

  • CIM
    Advances in Complex Copper Concentrate Smelting at the Tsumeb Smelter

    By B. Kruger

    The Dundee Precious Metals Tsumeb Smelter has evolved over the last decade to meet the challenges and opportunities brought about by a changing copper concentrate market, technological advances, env

    Jan 1, 2019

  • CIM
    Advanced Thermodynamic Modeling in the Pyrometallurgy – Refractory Corrosion Simulations

    By C. Pichler, S. Luidold, C. Wagner, C. Sagadin, D. Kreuzer

    Engineers and scientists have been combating the attack upon refractory materials of molten metals/matte and slags for hundreds of years. The details in many cases are still questionable or at least d

    Jan 1, 2019

  • CIM
    Incorporating Ventilation Fan Plants in Rail and Vehicular Roadway Overbuilds

    By R. E. Ray

    "As real estate for new development in urban settings becomes scarce, commercial high rises are being constructed above open passenger rail tracks and vehicular roadways. Rail and roadway overbuilds a

    Jan 1, 2019

  • CIM
    Cu Extraction from Naturally-Sourced CuFeS2 Coupled to Zn Electrowinning in a Battery-Like System

    By K. M. Deen, E. Asselin

    Hydrometallurgical processes, i.e., Cu extraction from a mineral concentrate and Zn electrowinning, are coupled in a battery-like system. A naturally-sourced CuFeS2 concentrate mixed with activated ca

    Jan 1, 2019

  • CIM
    ILTEC Technology – New Pathways towards Safe and Effective Cooling

    By T. Lux, M. Hanel, Degel, A. Filzwieser, R., H. Joubert

    It is the increasing demand for an economic and cost saving operation mode that requires effective cooling in order to achieve low refractory wear and good furnace lifetime, which is making cooling te

    Jan 1, 2019

  • CIM
    Ventilation Strategy Related to Battery Powered Equipment at Macassa Mine

    By S. Ross, M. Mayhew

    "Kirkland Lake Gold introduced battery equipped vehicles (BEVs) at the Macassa Mine in 2011. The fleet of underground BEV haulage trucks and loaders has grown over the years to over 30 units, the worl

    Jan 1, 2019

  • CIM
    Overview of Active Explosion Barrier Systems for Underground Coal Mines

    By Laura Steeves, Inoka Eranda Perera, Jhon Silva, Arend Spaeth

    "This paper reviews the main concepts ruling the design, implementation and performance of active explosion barrier systems for underground coal mines in the USA. The document examines the parameters

    Jan 1, 2019

  • CIM
    Investigation on Flotation Behavior of a Copper Sulfide Ore after Dry Grinding By Loesche Vertical Roller Mill

    By I. Silin, M. Stapelmann, H. Wotruba, K. M. Hahn, C. Gerold, J. Katzmarzyk

    New deposits are often characterized as low-grade and complex ore bodies. To date, processing of fine grained ore deposits implies complex processing routes with high energy consumption. For that reas

    Jan 1, 2019

  • CIM
    Outotec® Flash Smelting Technology Development

    By Jaana Romppanen, Satu Jyrkönen, Tiina Ranki, Peter Björklund, Markku Lahtinen, Kaj Eklund, Päivi Suikkanen

    Outotec is continuously developing our existing process equipment and new equipment solutions to enhance the Flash Smelting process. Thanks to the long operating history of the Outotec Flash Smelting

    Jan 1, 2019

  • CIM
    Effect of CaO and Al2O3 on the Liquidus Lines of the CU2O-Fe2O3-SiO2 System in Equilibrium with Metallic Copper

    By H. Henao, E. Kohnenkamp, L. Rojas

    The slags generated in the copper conversion process are mainly composed of Cu2O-Fe2O3-SiO2 with the compounds CaO and Al2O3 in concentrations up to 10 wt%. The present work contributes to the knowled

    Jan 1, 2019

  • CIM
    A Kinetic Model of Anode Copper Reduction and Comparison with Industrial Data

    By Paul E. Mather, Matthew J. M. Krane

    Anode or fire refining is the final pyrometallurgical step in the production of copper anode. Part of this process purifies liquid copper by reducing its dissolved oxygen with a natural gas-steam mixt

    Jan 1, 2019

  • CIM
    Technology Options and Innovation for Copper Heap Leaching

    By Damian Connelly

    The metallurgical heart of the majority of copper oxide processes is the heap leaching operation. Fresh low grade sulfide ores is a far greater challenge.The success of this unit operation is so impor

    Jan 1, 2019

  • CIM
    Auction-Based Control as a Site Implementable Means of Stabilising the Movement of Material through a Train of Countercurrent Decantation Thickeners

    By B. R. Maas

    Processing material at a consistent rate through the continuous countercurrent decantation (CCD) thickeners presented a major bottle neck to unlocking additional value from one of the post-flotation s

    Jan 1, 2019

  • CIM
    Preventing and Managing Fires at Deep and Ultra-Deep Level Gold Mines in South Africa

    By M. G. Beukes

    "In South Africa most of the large gold mines operate between 1500m and 4500m below surface where reef is accessed initially through a vertical shaft system then via a network of tunnels and mined in

    Jan 1, 2019

  • CIM
    Optimization Initiatives at Altonorte on the Path to Becoming a World Class Smelter

    By Beatrice Pierre, Juan Carrasco

    Altonorte began as a concentrate roasting operation in 1988 under the name of Refimet. In 1993, a copper smelter was built with a design capacity of 203,000 tonnes per annum of concentrate. Since 2001

    Jan 1, 2019

  • CIM
    Start Up, Commissioning and Optimization of the Gravity Circuit at Atlantic Gold’s Moose River Project in Eastern Canada

    By C. Hudson, D. Tremblay, A. Frey

    "A discussion of the design, challenges and successes associated with the commissioning of the gravity recovery circuit at Canada’s newest open pit gold mine - Atlantic Gold’s Moose River Consolidated

    Jan 1, 2019

  • CIM
    Maximising Hoisting Capacity Whilst Minimising Capital Investment

    By A. A. Wessels, D. P. Allison

    "Mine hoists are built to handle a certain nameplate capacity; they are specified and designed according to the required duty. However, as production capacity increases in other parts of an operation,

    Jan 1, 2019