Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • ISEE
    Computational Fluid Dynamics (CFD) Versus Traditional Methodologies to Assess Airblast from Blasting

    By Estefania Aramayo, Jhon Silva, Todor Petrov

    Blasting is one of the most critical activities in a mining operation. Nowadays, many quarries have to follow a considerable quantity of environmental restrictions that drive the need to improve the c

    Feb 6, 2023

  • ISEE
    A New Method of Reactive Ground Testing

    By Gary Cavanough

    The spontaneous exothermic reaction of ammonium nitrate explosives with sulphide-containing rocks, commonly referred to as reactive ground, is a site-specific condition that can lead to spontaneous de

    Feb 6, 2023

  • ISEE
    Floor Blasting for Establishment of a New Crusher in Underground Limestone Mine

    By Chris Searing

    An underground room-and-pillar limestone mine in Western Missouri acquired a new primary crusher, physically larger in every dimension than the unit it replaced. Due to the space constraints within th

    Feb 6, 2023

  • ISEE
    Controlled Blasting in Natural Geotechnical Structures (cavities) at the Hierro Mine - Brazil

    By Sérgio Augusto Ferreira, Alan Gerson Diaz Butron, Carlos E. Arroyo, Marcus Neves, Jorhs Enrique Casimiro Huayhua, Dieggo Santos, Eventomar Junior

    The presence of natural underground cavities is normally a characteristic of iron ore deposits, specifically in tropical deposits. Brazil and the United States are the only countries that have a legis

    Feb 6, 2023

  • ISEE
    Development of Controlled Blasting Pattern for Rock Excavation to Create Foundation of an Industrial Establishment

    By Dipankar Gorain, A K. Vishwakarma, Vivek K. Himanshu, Murari P. Roy, Shubham Singh, R S. Yadav

    The industrial establishments of a power plant consist of many important structures viz. cooling tower, wagon tippler, track hopper, plants and offices. The leveled foundation is the utmost need for e

    Feb 6, 2023

  • ISEE
    Electronic Initiation System in Fosterville Gold Mine Development

    By C. Zuniga, S. Combrinck, C. Peters

    Agnico Eagle Gold have partnered with Enaex Australia at their Fosterville gold mine to leverage a combination of drill and blast technologies to optimise underground development mining. The mine is t

    Feb 6, 2023

  • ISEE
    Encounter with Potential Acidic Sulphate Soil (PASS) and Bulk Emulsion Reaction in a South Africa Iron Ore Mine

    By Dirk Voogt, Quentin Steyl, D. Scott Scovira

    A South Africa iron ore mine reported a decline in blast performance and ore and waste fragmentation. Preliminary investigation by the explosives services company found that the straight gassed bulk e

    Feb 6, 2023

  • ISEE
    Reducing Impact on the Wall Generated by Blasting and Increasing Slope Design Adherence Using Controlled-Energy Explosives and Presplitting Technique

    By Orica Chile, Orica Brasil, Orica Brasil Victor Morais, Kinross Paracatu Leopoldo Muñoz, Kinross Paracatu Luis Marinho, Gubio Barsottini, Orica Brasil José Vergara, Lucas Steffen, Orica Brasil Washington Vilas

    In drill and blast activities, it has been a challenge to sculpt walls accordingly to what has been designed in state-of-art mining design software. Obviously, the perfection of making neat and smooth

    Feb 6, 2023

  • ISEE
    Measurement of the Vibration Delay Window for an Iron-Ore Mine

    By Maria Sullivan

    There have been many papers and articles presented over the last 60 years questioning the relevance of the 8-millisecond blasting delay window as an ‘Industry rule of thumb’. The concept of using dela

    Feb 6, 2023

  • ISEE
    Christmas Day 2020 VBIED Blast Investigation Findings and Damage Assessment of Nearby Historic Buildings in Nashville, Tennessee, USA

    By J. Mikhael Erekson, Connie Campbell Brashear, Brent Meins

    Christmas morning 2020, an IED in an RV was detonated along an evacuated section of downtown Nashville, Tennessee. The blast damaged over 40 buildings, including AT&T’s Main Central Office and caused

    Feb 6, 2023

  • ISEE
    Controlled the Blasting Performance with Electronic Detonator near High Voltage Tower (SUTET) using Signature Hole and Scale Distance Regression Analysis (A Case Study: Coal Mining in Indonesia)

    By Raden Haris Handayana, Jihan Farhan Lubis, Milia Putri, Tengku Deli Hamonangan Hasibuan, Sani Salahudin

    An environmental issue that must be controlled from coal overburden blasting near the structure is ground vibration. Damaging ground vibration is the effect exerted from residual energy from blasting

    Feb 6, 2023

  • ISEE
    Driving Continuous Improvement Through Blast Design Technologies in a Surface Quarry

    By Toby Forney, Joshua Schoonover

    In typical surface quarry operations, productivity and efficiency related to pit development begin with drilling and blasting efforts. By embedding technology within drilling and blasting operations,

    Feb 6, 2023

  • ISEE
    Prediction of Fines in Mining and Quarrying Applications Using the Fracture Density Model (FDM)

    By C. Mick Lownds, Dale S. Preece, Ali Bhuiyan

    FDM (Fracture Density Model) is a three-dimensional mechanistic model of blast induced rock fragmentation. FDM uses several computational mechanics algorithms to simulate the effect of blasting in dif

    Feb 6, 2023

  • ISEE
    Case Study: Blasting with Air Decks to Maintain Performance While Saving Costs

    By Brian Lewis, Reinhold Daykin Schnell

    Blasting is the primary and most effective method for breaking and moving material at most mine sites. The blast design is often adjusted in efforts to optimize the effectiveness of the blasts’ explos

    Feb 6, 2023

  • ISEE
    Optimization of Blast Design Parameter for Ring Blasting in Underground Hard Rock Mine Using Numerical Simulation

    By VIVEK KUMAR HIMANSHU, Murari Prasad Roy, Kaushik Dey, Rakesh Kumar Singh, Ashish Kumar Vishwakarma

    Sublevel stoping is commonly adopted method in underground hard rock mining. Proper planning and its execution is the key requirement for stope extraction using this method. The stope extraction has b

    Feb 6, 2023

  • ISEE
    Evaluation of Drilling and Blasting Using Explosives Based on General Adherence of the Drilling and Rock Blasting Plan

    By Jair Koppe

    The unsatisfactory blasting effect is mainly related to the improper selection of design parameters of drilling and blasting scheme. In order to evaluate the rationality of drilling and blasting schem

    Feb 6, 2023

  • ISEE
    Implementation of an Integrated Quality Assurance and Control System Applied to High Complexity Blasting Open Pit

    By Regina Rocha, Miguel Humpire

    One of the challenges within unitary mining operations is blasting, which has a significant downstream impact on the following processes, which is why mining companies ensure the results of the blasti

    Feb 6, 2023

  • ISEE
    Study of Sheet Charge Initiation with Varied Cap Type, Orientation, and Distance

    By C. E. Johnson, R. L. Bauer, E. M. Johnson

    In industry, the strength of a blasting cap is often equated to the type of explosive it can detonate. Comparable cap strength is becoming less important as nearly all caps manufactured today can init

    Feb 6, 2023

  • ISEE
    Modular Ballistic Pendulum for Measurement of Impulse from Tamped Explosives

    By Roland Alford

    The ballistic pendulum is a well-established piece of test equipment originally developed for estimating the velocity of bullets and projectiles. When trying to understand the effects of different tam

    Feb 6, 2023

  • ISEE
    Varying Stemming Heights Based on the Horizontal Relief Available to Each Hole

    By Neal Lee

    Reduced relief horizontally means an increase in energy expended vertically into the rock surrounding the stemming column, and potentially through the stemming column. The vast majority of holes in an

    Feb 6, 2023