Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
- 
                     Mine To Metal: A Practical Balance For A Large Platinum Producer Mine To Metal: A Practical Balance For A Large Platinum ProducerBy H. E. Bartlett This paper deals with the sampling and mass measurement for ore delivered from a shaft to a processing plant and the contribution of the data from these measurements to the metal balances from shaft d Jan 1, 2014 
- 
                     The Relix process for the resin-in-pulp recovery of uranium The Relix process for the resin-in-pulp recovery of uraniumBy F. L. D. Cloete The Relix process is based on direct contact between an ion-exchange resin and undiluted pulp, thus avoiding prior solid-liquid separation. The resin particles float near the surface of the pulp, form Jan 1, 1981 
- 
                     Sampling, sample preparation and analytical practices for power station-type coals Sampling, sample preparation and analytical practices for power station-type coalsBy V. Moodley Strict implementation of International Standards for representative sampling of coal is difficult for routine monitoring, due to time, technical, and economic constraints. A large percentage of the to Jan 1, 2009 
- 
                     Assessment Of Current Mining Strategy For Steep Reefs At Mine A Assessment Of Current Mining Strategy For Steep Reefs At Mine ABy A. Nhasengo Paper written on project work carried out in partial fulfilment of B. sc. Eng (Mining Engineering) The purpose of this investigation was to assess the mining strategy for steep reefs at Mine A mine Jan 1, 2007 
- 
                     Optimizing Medium - Term Operational Plans for a Group of Copper Mines Optimizing Medium - Term Operational Plans for a Group of Copper MinesBy M. Splaine, W. Davidson, D. C. Atkinson Since 1964, Nchanga Consolidated Copper Mines, Ltd., has been developing and using production scheduling methods for optimizing its metallurgical operations in the short term (up to one year). Medium- 
- 
                     Electric Rock Drilling System For In-Stope Mining In Platinum Operations Electric Rock Drilling System For In-Stope Mining In Platinum OperationsBy P. J. Petit The strategic mission of the South African mining industry is to extract the mineral assets in an energy efficient, economical and safe manner. Drilling has received particular attention in the last f Jan 1, 2006 
- 
                     Criteria For Utilization Of By-Products From The Ferro-Alloy Industry Criteria For Utilization Of By-Products From The Ferro-Alloy IndustryBy Willem C. A. van Niekerk, David A. Baldwin, Nardus Potgieter, Willie A. Gericke Authorities that regulate environmental issues pertaining to industrial wastes in South Africa regard landfill disposal as the only effective environmental management option for slag and other inorgan Jan 1, 2007 
- 
                     Guide to the Preparation of Papers for Publication in the Journal Guide to the Preparation of Papers for Publication in the JournalThe following notes have been compiled to assist authors in the preparation of papers for presentation to the Institute and for publication in the Journal. STANDARDS FOR ACCEPTANCE To merit consid 
- 
                     Optimization of mill performance by using online ball and pulp measurements - Synopsis Optimization of mill performance by using online ball and pulp measurements - SynopsisBy B. Clermont Ball mills are usually the largest consumers of energy within a mineral concentrator. Comminution is responsible for 50% of the total mineral processing cost. In today?s global markets, expanding min Jan 1, 2010 
- 
                     Keynote address: hydrometallurgical process development for complex ores and concentrates - Synopsis Keynote address: hydrometallurgical process development for complex ores and concentrates - SynopsisHydrometallurgical processing of complex ores and concentrates is becoming increasingly important as the mining and metallurgical industry seeks to exploit mineral deposits that are difficult to treat Jan 1, 2009 
- 
                     The same-level arrangement technology of flotation plant: Fundamentals and practice, M. Zhang, S. Shi, X. Xia, Z. Shen, and Y. Yang The same-level arrangement technology of flotation plant: Fundamentals and practice, M. Zhang, S. Shi, X. Xia, Z. Shen, and Y. YangBy Y. Yang, M. Zhang, X. Xia, S Shi, Z. Shen A stepwise arrangement of flotation cells is the most common layout of a flotation circuit in the mineral processing industry. In such a design, slurry flows from upstream to downstream by means of gr Jan 1, 2020 
- 
                     Analysis Of Transport Phenomena In Submerged Arc Furnace For Ferrochrome Production Analysis Of Transport Phenomena In Submerged Arc Furnace For Ferrochrome ProductionFerrochrome is the major chromium source for stainless steel production, and submerged-arc furnaces (SAF) are most commonly utilised to smelt chromite ores into ferrochrome by using suitable carbonace Jan 1, 2004 
- 
                     Hydraulic Hoisting Technology For Platinum Mines (3622213b-45e5-4e01-99ed-721e60559e61) Hydraulic Hoisting Technology For Platinum Mines (3622213b-45e5-4e01-99ed-721e60559e61)By G. van den Berg Anglo Platinum has initiated a project to investigate hydraulic hoisting technology for platinum mines. Hydraulic hoisting systems are categorized as pumping, fluidizing feeder or displacement feeder Jan 1, 2005 
- 
                     An on-board diagnostic system for the South African mining industry An on-board diagnostic system for the South African mining industryBy E. Adlard This paper sketches an expert system for use underground in pinpointing problem areas in the operation of machines. The system is typically a software 'shell' designed to accommodate a serie Jan 1, 1990 
- 
                     The commissioning of a test facility for the calibration of anemometers The commissioning of a test facility for the calibration of anemometersBy J. J. Van Rensburg The commissioning of a test facility for the calibration of anemometers by J. J. VAN RENSBURG (Student Member). After the erection of a commercially produced open-jet wind tunnel for the calibration o Jan 4, 1975 
- 
                     South African Council for Professional Engineers Policy Statement no. 1/3 South African Council for Professional Engineers Policy Statement no. 1/31. TRAINING IN ENGINEERING WORK FOR ENGINEERS IN TRAINING 1.1 Registration as engineer in training An engineering graduate who has passed an examination recognised by the Council1 is eligible for re Jan 1, 1979 
- 
                     Scale-Up Procedures For Gold-Adsorption Systems. Part 1: Adsorption Kinetics Scale-Up Procedures For Gold-Adsorption Systems. Part 1: Adsorption KineticsBy K. I. Afewu, L. C. Woollacott Little is reported in the literature that is directly useful for the interpolation film coefficients for the in-pulp adsorption circuits used in gold metallurgy. This can create a problem if the desig Jan 1, 1995 
- 
                     On The Development Of Bainitic Alloys For Railway Wheel Applications - Synopsis On The Development Of Bainitic Alloys For Railway Wheel Applications - SynopsisBy A. Kapito The ferrite-pearlite microstructure is the most popular microstructure for alloys used in structural applications, including railway wagon wheels. These alloys have been designed through alloying and Jan 1, 2012 
- 
                     Guidelines for the derivation of reliable material balances from plant data Guidelines for the derivation of reliable material balances from plant dataBy L. C. Woollacott Some of the factors that may influence the reliability of a consistent material balance derived from plant data were investigated, data taken from a sampling of the Iow-grade tin-flotation circuit at Jan 1, 1987 
- 
                     Suggested thermal stress limits for safe physiological strain in underground environments Suggested thermal stress limits for safe physiological strain in underground environmentsBy J. M. Stewart, C. H. Wyndham Suggested thermal stress limits for safe physiological strain in underground environments by J. M. STEW ART M.Sc. (Eng) (Witwatersrand) (Visitor) and C. H. WYNDHAM M.B., D.Sc. (Witwatersrand), F.R.C.P Jan 8, 1975 
