Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Review Of Optimal Planning Of Level And Raise Spacing In Inclined Narrow ReefsBy C. Musingwini
The subject of optimal planning of level and raise spacing for inclined narrow reef deposits has received intermittent attention over the years because the subject matter is inherently complex. Previo
Jan 1, 2010
-
Optimizing The Performance Of Wet Drum Magnetic SeparatorsBy M. Dworzanowski
The difference in the magnetic properties of minerals is the basis for magnetic separation. All minerals can be generally classified as ferromagnetic (strongly magnetic), paramagnetic (weakly magnetic
Jan 1, 2010
-
Prediction Of Blast Induced Ground Vibrations In Karoun III Power Plant And Dam: A Neural NetworkBy M. Kamali
In this research, in order to predict the peak particle velocity (PPV)(as vibration indicator) caused by blasting projects in the excavations of the Karoun III power plant and dam, three techniques in
Jan 1, 2010
-
Identification Of Global Diamond Metallogenic Clusters To Assist ExplorationBy Mike de Wit
Of the approximately 6,500 kimberlites known to date, less than 3% are diamondiferous and less than half of those are economically viable. Admittedly, this is a global figure and varies from area to a
Jan 1, 2010
-
Process design of the Phola coal preparation plant - SynopsisBy G. M. Cresswell
The 2 360 t/h two module Phola coal preparation plant represents anew era of large plant in the Witbank coalfield designed to extend its life to 2020 and beyond. The plant uses the optimum processing
Jan 1, 2010
-
Ferroalloy Design, Ferroalloy Selection And Utilization Optimization With Particular Focus On Stainless Steel Materials - SynopsisBy C. -J. Rick
The ferroalloy market is characterized by a very long communication distance between the consumer and the producer. This has created a situation where it has been difficult to change ferroalloy proper
Jan 1, 2010
-
Theoretical, practical, and economic difficulties in sampling for trace constituents - SynopsisMany industries base their decisions on the assaying of tiny analytical sub-samples. The problem is that most of the time several sampling and sub-sampling stages are required before the laboratory pr
Jan 1, 2010
-
Design of Merensky Reef Crush PillarsBy B. P. Watson
The Bushveld platinum group metal deposits are two distinct, shallow-dipping stratiform tabular orebodies which strike for many hundreds of kilometres. Mining is extensive, with depths ranging from cl
Jan 1, 2010
-
HPGR?FAQ - SynopsisThe successful commissioning of the Cerro Verde project in Peru at the end of 2006 marked the culmination of the efforts of many in the industry over many years to have high pressure grinding roll tec
Jan 1, 2010
-
Rapid Underground Development Optimisation At Cullinan Diamond Mine Using Computer SimulationBy J. Botha
There are many underground mining software tools available to plan and schedule the development of underground mines. A shortfall of these tools is the optimization of the underground equipment and st
Jan 1, 2010
-
Application of the Palla? vibrating mill in ultra fine grinding circuits - SynopsisBy K. Andres
This paper presents the vibrating mill technology and summarizes the grinding principle of ultra fine grinding. In addition, a variety of operations is described and the benefits of these different op
Jan 1, 2010
-
How Electronics Can Release the ImaginationBy G. V. R. Landman
It is self-evident that economic pressure demands that today?s mines stay ahead and stay competitive. The challenge, however, isto find fresh approaches to the pursuit of efficiency and operational ef
Jan 1, 2010
-
Relationships between comminution energy and product size for a magnetite ore - SynopsisAn extensive laboratory grinding study was carried out on a magnetite ore in order to assess the grinding behaviour of magnetic concentrate and tail from low intensity magnetic separation (LIMS).The t
Jan 1, 2010
-
Finsch Mine Treatment Plant Upgrade ProjectBy D Olivier
De Beers' Finsch Mine is situated in the Northern Cape province, 170 km northwest of Kimberley. The concentrator facility, designed and constructed by Bateman Engineering, was commissioned in 196
Jan 1, 2010
-
A Comparison of Limit Equilibrium and Numerical Modelling Approaches to Risk Analysis for Open Pit MiningBy H. T. Chiwaye
Risk analysis is an important step in the design of rock slopes in open pit mining. Risk is defined as the product of the probability of slope failure and the consequences of the failure, and is gener
Jan 1, 2010
-
Towards Sustainability In Ferroalloy Production ? SynopsisBy L. Holappa
Ferroalloy production is an energy-intensive industrial sector with significant CO2 emissions. In this paper the current situation in ferroalloy processes is discussed from the standpoint of global en
Jan 1, 2010
-
The socio-economic aspects of mine closure and sustainable development?guideline for the socio-economic aspects of closure: Report 2 - Guideline for the socio-economic aspets of mine closureBy J. Stacey
There are four components to this guideline 1. Guidance on the socio-economic aspects of closure policy 2. Socio-economic closure activities mapped against the mining project life-cycle (a ?check st
Jan 1, 2010
-
Bias testing of cross-belt samplers - SynopsisBy G. Lyman
The cross-belt sampler is a device that is very widely used even though it has not been ratified by the Standards associations. This paper is concerned with the bias testing of two cross-belt sampler
Jan 1, 2010
-
The application of the AMIRA P754 metal accounting code in the coal industry ? SynopsisBy D. P. Power
The development of an accounting code for the metallurgical industry has been debated for many years. Following the series of tumultuous economic events in the nineties and earlier this century that h
Jan 1, 2010
-
Experiences in the Production of Metallurgical and Chemical Grade UG2 Chromite Concentrates from PGM Tailings StreamsBy N. F. Dawson
Recovery of a chromite concentrate from UG2 flotation tailings streams, of a grade suitable for further pyrometallurgical treatment for the production of ferrochrome, has certain specific challenges n
Jan 1, 2010