Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Computational Fluid Dynamics Simulations And Experimental Validation Of Tracer Gas Distribution In An Experimental Underground Mine
Following a disaster in a mine, it is important to understand the state of the mine damage immediately with limited information. Computational fluid dynamics can be used to simulate and ascertain info
Jan 1, 2011
-
Securing Talent In This New Decade Of Mining
By Grover Wallace
At is important for today?s mining executives and leaders not to underestimate the fact that, while the recent downturn in the economy did take its toll on balance sheets and productivity, factors suc
Jan 1, 2011
-
Effect on best practices by the lack of mineral policy
By E. Steiakakis, A. Athousaki
Nowadays, stakeholders have a strong say to the enforcement of best practices by mining and quarrying companies. In most cases there is a direct relationship between sustainable development principles
Jan 1, 2011
-
Robbins Double Shield Breaks Through On Sochi Project
In early March 2011, a 6.2 m (20.3 ft) diameter Rob-bins Double Shield tunnel boring machine (TBM) crossed the finish line in Sochi, Russia. The machine completed a 4.5-km- (2.8-mile-) long section o
Jan 1, 2011
-
Strategies for ensuring a sustainable supply of quality mining professionals for the world
The mining industry continues to experience a skills shortage and this is having an impact on the ability of mining companies to operate sustainably. Apart from a few exceptions, there is a dearth of
Jan 1, 2011
-
Non Contacting Sensor Technology For Measuring Level And Density
By T. Hart
Nuclear gauging is used world-wide in almost every industry. From mining and ore-grading to finished product, the metallurgical industry is one of the biggest users of nuclear sensors for inventory,
Jan 1, 2011
-
Enhancing the benefits of projects through local procurement
By M. A. Barclay, D. Samson, A. M. Esteves
Several companies have adopted policies and standards aimed explicitly at increasing ‘local procurement’, recognising that local economic participation has benefits for companies and communities alike
Jan 1, 2011
-
Cemented Rock Fill System Design And Application In Leeville Underground Mine
By C. Sun
The Leeville underground mine has been in operation since 2006 and currently produces 3,500 tons of ore per day with an average gold grade of 0.34 opt. The mine has a large horizontal extent of 2,500
Jan 1, 2011
-
Performance Of A Full-Scale Horizontal-Flow Wetland For Treating Zinc From Legacy Tailings Pond
By J. Schoenbacher
Park City Municipal Corporation (PCMC), long before being recognized as an Olympic venue was known as one of the great American silver mining towns. During a century of active mining, the Park City mi
Jan 1, 2011
-
SME Arizona Conference: Challenges And Opportunities In Mining
By Emily Wortman-Wunder
Attendees at December?s Arizona SME Section Conference at the Hilton El Conquistador Resort outside of Tucson, AZ were feeling optimistic and ready to get to work after a year of steady growth and rec
Jan 1, 2011
-
Elko Roundtable 2011: High-Density Tailings, Paste And Filtered Tailings
By Bryan Ulrich
Knight Piésold and Co. hosted its annual roundtable discussion on March 17, 2011 at the Stockman Hotel and Casino in Elko, NV. The theme for Roundtable 2011 was, ?High density tailings, paste, and fil
Jan 1, 2011
-
Study On Performance-Based Design For Mine Fire Safety System
As opposed to a prescriptive-based design, a performance-based fire-protection system design allows the system planner the flexibility in choosing specific method, materials and design tools to achiev
Jan 1, 2011
-
Comparing Tracer Gas Sampling Methods In Underground Mines Using Solid-Phase Microextraction (SPME) Fibers
By R. Patterson
Tracer gas sampling methods are useful for monitoring ventilation systems, especially in remote or inaccessible areas, and can be utilized for analysis of the ventilation system immediately following
Jan 1, 2011
-
Life Of Mine Schedule From Multiple Pits: A Case Study For The Tenke Fungurume Mining District
By R. Benito
This paper describes the development of a life of mine schedule (LOM) for one of the world?s largest known sedimentary Copper-Cobalt districts located in the Katanga Province, Democratic Republic of C
Jan 1, 2011
-
Implementation Of Corporate Biodiversity Management Program
By M. Hamarat
Freeport-McMoRan Copper & Gold (FCX) is committed to preserving and enhancing biodiversity in the areas in which we operate. As a member of the ICMM, FCX is committed to implement the 10 Sustainable D
Jan 1, 2011
-
Knelson-Deswik Mill: Evaluation Of Operating Variables ? Introduction
By D. Rahal
All ores have an economic optimum particle size (Wills and Napier-Munn, 2006). This optimum value is often a compromise between the need to achieve adequate liberation for the efficient separation and
Jan 1, 2011
-
Measurements At A State Of The Art 2 X 5 Mw Dual Pinion Mill Drive
By M. Rufli
Until not so long ago most ring geared mills were operated with fix speed motors only. By using the latest generation of medium voltage frequency converters, new possibilities have arisen to improve t
Jan 1, 2011
-
Modified Tail Section Reduces Noise On A Continuous Mining Machine (5b570952-5e1d-4ba6-8a08-6c5b579cf020)
By A. K. Smith
Overexposure to noise remains a widespread, serious health hazard in the U.S. mining industry. Most other categories of illnesses and injuries associated with mining have improved, with the exception
Jan 1, 2011
-
Response Surface Methodology For Optimization Of Copper Leaching From A Low-Grade Flotation Middling
By Jian Liu
The study aims to leach copper from a low-grade flotation middling by optimizing the leaching process using response surface methodology. The effect of key parameters, i.e., sulfuric acid concentratio
Jan 1, 2011
-
Designing, Scheduling And Managing Waste Rock Facilities - A Case Study On The Waste Rock Facilities At The Phoenix Mine, Nevada.
By V. Galla
Waste rock facilities (WRF) generally have a large footprint depending on the strip ratio the mine plan provides. Considerable planning is involved during the initial phase of the mine plan regarding
Jan 1, 2011