Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Investigation Of Longwall Face Ventilation Air-Splitting Methods For Improved Dust Control (1658b77e-7327-46b3-838d-f4e876cbf125)

    By J. A. Organiscak

    Two types of airflow splitting methods for improving longwall dust control were investigated by NIOSH's Pittsburgh Research Laboratory. These methods included a translucent mesh barrier and a sta

    Jan 1, 1999

  • SME
    Design Of Impoundment And Evaporation Ponds And Embankments For Cyanide And Other Toxic Effluents

    By George C. Toland

    Most existing impoundment ponds and dams leak effluent into the soil or rock upon which they are constructed. However, proposed environmental legislation will require very stringent control on the rel

    Jan 1, 1975

  • SME
    Applied Geology: The Foundation For Mine Design At Exxon Minerals Company?s Crandon Deposit

    By Roger G. Rowe

    The Crandon deposit, located in northern Wisconsin, is a 65.8 million ton Precambrian volcanogenic massive sulfide deposit which averages 1.4% copper and 5.8% zinc. The deposit is classic in origin, m

    Jan 1, 1983

  • SME
    Improved Drill and Blast Designs Free $3.6m of Ore for Surface Copper Mine - SME Annual Meeting 2025

    By Liz Diaz, Tacio Ferreira

    Capstone Copper’s Pinto Valley Mine faced challenges in recovering rock and ore on final walls because of geotechnical constraints that require restrictions on methods for loading blastholes adjacent

    Feb 1, 2025

  • SME
    Area monitoring and spot-checking for diesel particulate matter in an underground mine

    By E. McCullough, S. Gaillard

    "Diesel particulate matter (DPM) has been regulated by the U.S. Mine Safety and Health Administration since 2002 in underground metal and nonmetal mines. To demonstrate regulatory compliance, DPM samp

    Dec 1, 2016

  • SME
    Process Development Testing for Comminution Circuit Design

    "Metallurgical process development in greenfield projects must define the comminution flowsheet and establish the equipment sizes that are required to deliver the project design criteria. These are cr

    Jan 1, 2016

  • SME
    In Situ Mining A Design For Positive Results

    By Albert L. St. Peter

    The "Old Reliable" four million pound blast in March of 1972 marked the opening, as far as is known, of serious efforts to commercialize the In Situ concept. That was a coyote shot, and it was followe

    Jan 1, 1976

  • SME
    Estimating Transportation Costs For Large Volume Shipments

    By Elizabeth Anne Semon

    The marketability of a large volume bulk material is significantly effected by transportation costs. Hence, it is essential for anyone that deals with minerals or mineral wastes to be able to reliably

    Jan 1, 1973

  • SME
    The Adaptability Of Illinois Coal For Use In Iron And Steel Production - Introduction

    By Hubert E. Risser

    At the outset of a discussion on the adaptability of Illinois coals for use in iron and steel production, it is perhaps well to define terms. ?Adaptability? as used in this context, means that a coal

    Jan 1, 1961

  • SME
    An Overview of Capital and Operating Cost Estimation Techniques for Heap Leach Projects

    By William E. Cobb

    15.1 INTRODUCTION The mine development process, as discussed in Chapter 2, is a series of data gathering and analysis steps. As the mine development process proceeds, information about the geology, m

    Jan 1, 1988

  • SME
    “They Want to Dig a 100-Foot Hole in Front of My House for Two Years!” - Community Mitigation and Outreach for DC Water’s First Street Tunnel

    By Carlton M. Ray, William P. Levy, Thomas Lindberg

    "The District of Columbia Water and Sewer Authority (DC Water) is implementing its $2.6 billion DC Clean Rivers Project to reduce combined sewer overflows to the District’s receiving waterbodies and m

    Jan 1, 2016

  • SME
    A New Technique For Mining Oil

    By Gordon B. French, Donald E. Garrett

    INTRODUCTION Crude oil reserves in the United States are still very large, even though for many years they have not been sufficient to supply our entire domestic requirements. They are continuously

    Jan 1, 1983

  • SME
    Lix®-64 As An Extractant For Copper Pilot Plant Data

    By D. W. Agers

    This paper is an extension of previous work evaluating a new extractant, LIX®-64, for recovery of copper from dilute acidic solutions. Large scale pilot plant operations have confirmed the technical a

    Jan 1, 1967

  • SME
    Horizontal Geotechnical Investigations for Tunneling

    By Nick Salisbury, Alan Howard, Scott Tunison

    INTRODUCTION Geotechnical investigations for tunneling projects typically use vertical test borings and, to a lesser extent, angled borings. Horizontal drilling applications were often limited to

    Jan 1, 2005

  • SME
    Surface Chemistry Modification of Rock Dust for Improved Dispersion and Coal Dust Explosion Prevention

    By K. Perry, B. Lusk, Q. Huang, R. Honaker

    "Rock dust is applied in underground coal mines to prevent the propagation of coal dust explosions. The application is conducted either dry or wet. Both methods have advantages and disadvantages howev

    Jan 1, 2015

  • SME
    Methods For Estimating Nonpoint Pollution Loads From Mining Activities - Introduction: Nature Of Nonpoint Pollution

    By John W. Nebgen

    Surface water quality is determined by complicated interactions between water and land. Runoff--the flow of waters in surface streams and rivers-¬represents the total amount of water collected in a dr

    Jan 1, 1975

  • SME
    Overcoming Challenges in Tunneling for Albany’s Beaver Creek Clean River Project, Albany, New York - NAT2022

    By Jerry Wang, Greg Bold, Mahmood Khwaja, Rebecca Caldon, William Simcoe

    Phase III and Phase IV of the Beaver Creek Clean River Project, Albany, NY, includes microtunnel construction of 2,320 feet of 48-inch/36-inch internal diameter (ID) conveyance pipe and a 525 foot lon

    Dec 1, 2022

  • SME
    A New Model For Effects Of Impersistent Joint Sets On Rock Slope Stability

    By W. Pariseau, S. Puri, S. Schmelter

    Introduction Joints often have profound effects on elastic properties and strength of rock masses and therefore on rock slope stability. In surface mine slopes, joints are usually too numerous to be t

    Jan 1, 2007

  • SME
    A Computer Vision System for Terrain Recognition and Object Detection Tasks in Mining and Construction Environments

    By S. Frimpong, E. Gbadam, W. Nyaaba, G. Somua-Gyimah

    Recent studies towards dragline excavation efficiency have focused on incrementally achieving automation of the entire excavation cycle. Initial efforts resulted in the development of an automated dra

    Jan 1, 2019

  • SME
    Measurement Techniques For The Characterization Of The Flotation Performance Of A Complex Sulphide Ore

    By D J. Bradshaw

    It is well known that the chemical environment determines the success of the flotation process, however its characterization and control is difficult to achieve. This work evaluates the use of various

    Jan 1, 1999