Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
AFBC Development Experience At TVA?s 20-MW Pilot PlantBy James W. Bass
Atmospheric fluidized bed combustion (AFBC) is an improvement in coal-fired boiler design that offers several advantages over conventional boilers. AFC can meet sulfur and nitrogen oxide emission regu
Jan 1, 1985
-
On-line Monitoring And Computer Control Of Heap Leach SystemsBy James P. Sabogal
A control and monitoring system is being developed by Betz Laboratories for the heap leach process in gold recovery. Called Betz 14000GL, the system is designed to improve gold leaching and provide sa
Jan 1, 1998
-
Trona: An OverviewBy R. T. Leigh
The continued decline In the production of synthetic soda ash (sodium carbonate) due to high costs and associated environmental factors, has improved the world demand for natural soda ash. The largest
Jan 1, 1989
-
Ball Mill Classification System Optimization through Functional Performance ModelingBy O. M. Arafat, J. A. Finch
"The Functional Performance Equation calculated from a plant grinding survey defines two distinct ball mill circuit efficiencies and how they relate to total production rate through the target grind s
Jan 1, 2017
-
Improved Drilling Controls Through Forecasting - SME Annual Meeting 2024By Karl Ingmarsson
Larger mines spend millions of dollars annually on rock drilling tools, but often purchase based on historic consumption. The results vary from excess inventory to acute tools shortages. These lead to
Feb 1, 2024
-
Design And Operation On Sintering Plants Incorporating Cooling Of The Sinter On The Strand ? IntroductionBy J. Astier
The idea of using only one strand for both sintering and cooling of the sinter is not new. In 1952, in the U.S.A. a sintering plant was built at Benson Mine (Star Lake, N.Y.), including : - 68 m2 o
Jan 1, 1974
-
Vertical Crater Retreat Stoping As Applied At The Homestake Mine (b951c862-019d-41c7-9c89-45bf8f9e7535)By Steven T. Mitchell
The introduction of Vertical Crater Retreat (VCR) Stoping at the Homestake Mine in Lead, SD, constitutes a major advance in Homes take Mining Company's efforts to improve productivity and reduce
Jan 1, 1980
-
Using Simulation and Optimization to support the Mining Execution PlanBy Katherine Hynard, Colin Eustace
Development quarterly mine plans is generally time-consuming and requires consideration for many operational constraints and competing objectives. With lengthy turnaround times, there is often limited
Jun 25, 2023
-
Selective Elution Of Gold, Silver And Mercury Cyanide From Activated CarbonBy K. Bunney
A high-pressure laboratory elution rig was commissioned to simulate industrial Zadra and AARL elution conditions for the stripping of gold, silver and mercury from loaded activated carbon. It was fou
Jan 1, 2010
-
Large-Scale Renovation Work to Improve Operation in the Tokyo Subway Network - Plans to Improve Turn-Back Facilities Between Iidabashi Station and Kudanshita StationBy Yasushi Arai
"Among Tokyo Metro’s approximately 200km of subway lines, the Tozai Line that connects Chiba Prefecture and mid-Tokyo experiences congestion of up to 199% at worst and relief of this has become urgent
Jan 1, 2016
-
Predicting Mine-Wide Seismogenic Hazard with Confidence Using Calibrated Numerical Models - RASIM 2022By Kathy Kalenchuk
To develop strategic and tactical strategies to manage seismic hazard in a safe and economic manner, it is necessary to understand the spatial and temporal distribution of mine wide seismogenic behavi
Apr 26, 2022
-
The Application Of Trend Surface Analysis To The White Pine Copper Deposit ? IntroductionBy S. C. Nordeng
The program described in this paper is primarily a test of the possible utility of multiple regression in ore search, It was carried out as a cooperative project between White Pine Copper Company, the
Jan 1, 1964
-
Block Cave Production Scheduling Using PCBCBy T. Diering
Gemcom PCBCTM is a software package which has been developed over the last 22 years for the planning and scheduling of block cave mines. This paper presents an update of the various research and devel
Jan 1, 2010
-
Computer Design Of Grinding Circuit Flowsheets - Application To Cement And Ore ProcessingBy T. Gelpe
A digital simulator of classification and grinding circuits is used to evaluate the performances of various flowsheets. For a given flowsheet configuration, unit processes dimensions and operating con
Jan 1, 1983
-
Flowsheet Description And Process Development Sept-Iles ConcentratorBy Benoit Gagnon
Mining of the Schefferville iron deposits began in 1954 on completion of the 574 km railway linking the mines and the St-Lawrence river port of Sept-Iles. Apart from crushing, no treatment of these or
Jan 1, 1980
-
2003 MSHA Survey - Atmospheric Monitoring Systems In U.S. Underground Coal MinesBy William J. Francart
In 2003, MSHA initiated a survey of the 11 Coal Mine Safety and Health Districts to develop a database for the implementation of Atmospheric Monitoring Systems (AMS) in underground coal mines. Mine o
Jan 1, 2005
-
Mine To Model Reconciliation At The Rosebud MineBy K. D. Allen, M. J. Blattman
The problem of measuring the amount of rock removed during a given time interval is faced by most mining operations. Many methods have been developed with varying degrees of success, dependent upon th
Jan 1, 1999
-
Effect Of Variance On Control AlgorithmBy Rajive Ganguli
A control algorithm was developed previously for loading coal trains such that each car met customer specifications (Ganguli, 2001). In developing the algorithm, the effect of the variance of coal was
Jan 1, 2002
-
Corporate Culture: What Is It, Why Should I Care?By Edward C. Dowling
Dilbert, management mumbo-jumbo, and human resource buzzwords aside, this paper defines corporate culture and why it is important to understand it. The sum of company experience, both good and bad, de
Jan 1, 2001
-
Matching Longwall And Continuous Miner Productivity RequirementsBy R. L. Grayson, M. P. Miano, S. Yuan
Matching the productivity gains of continuous mining machines with the increasing performance levels achieved by longwall units has required creative thinking to assure that development is completed i
Jan 1, 1995