Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Rock Mechanics Property Data Bank For Coal Measure Strata

    By G. C. Sun

    Rock mechanics properties, i.e. uniaxial and triaxial compressive strength, indirect tensile strength shear strength, Young's modulus, and poisson's ratio were collected for coal and related

    Jan 1, 1993

  • SME-ICGCM
    A Method For Determination Of Strength Of Coal Mass

    By Guo Junfeng

    The strength of coal mass saturated with gas is an essential parameter in studying the mechanism of gas and coal outburst, and its prediction method. Up to now, there has not been a method for determi

    Jan 1, 1992

  • SME-ICGCM
    An Analytical Approach For The Estimation Of Pillar Strength

    A procedure fm the estimation of pilla1 strength is presented where the design of underground coal pillars is emphasized. An analytical approach has been developed, proposing that the effect of end co

    Jan 1, 1990

  • SME-ICGCM
    Entry Stability Monitoring & Analysis For Longwall & Continuous Mining Systems

    By Wm. Mark Hart

    Under a specific geological condition, roof supporting method, and pillar-entry system, an entry convergence concept may be the most effective means that can be used to effectively indicate the longwa

    Jan 1, 1995

  • SME-ICGCM
    Support Resistance And Roof Behaviour Of A Longwall Face With 4-Leg Shields

    By S. S. Peng

    The hydraulic powered supports have been employed in U. S. longwall mining for the past two decades. Yet the sciences of roof control at the powered supported faces remain largely unknown. In order to

    Jan 1, 1982

  • SME-ICGCM
    Longwall Production, Maintenance, And Roof Control System

    By W. Mark Hart

    The current Automatic Data Acquisition system developed by some support manufacturers make it possible to monitor and record changes in leg pressure, DA RAM stroke in every shield and shearer position

    Jan 1, 1994

  • SME-ICGCM
    Modeling the Effect of Bolts on the Behavior of Rock Pillars and Associated Insights on Rib Reinforcement

    By Gabriel Walton, Sankhaneel Sinha

    "Rib failures are a major hazard in underground mining. When pillars are subjected to loading, extensile cracks are generated parallel to the excavation boundary, which can manifest as rib falls. A co

    Jan 1, 2017

  • SME-ICGCM
    Roadway Roof Support Design in Critical Areas at Anglo American Metallurgical Coal's Underground Operations

    By Ismet Canbulat

    "In order to ensure the stability of roadways, Anglo American Metallurgical Coal (AAMC) has developed a roof support design methodology that integrates analytical, numerical and empirical modelling. T

    Jan 1, 2010

  • SME-ICGCM
    Deep Cover Bleeder Entry Performance and Support Loading: A Case Study

    By Tulu B. Ihsan, Mark A. Van Dyke, Ted M. Klemetti

    "How well do current modeling procedures calculate the rear abutment extent and loading? Does an improved understanding of the rear abutment extent warrant a change in standing support in bleeder entr

    Jan 1, 2017

  • SME-ICGCM
    A Case Study of Multi–Seam Coal Mine Entry Stability Analysis with Strength Reduction Method

    By Ihsan Berk Tulu, Michael Sloan, Ted Klemetti, Michael M. Murphy, Gabriel S. Esterhuizen, Jame Sumner

    "In this paper, the advantage of using numerical models with the strength reduction method (SRM) to evaluate entry stability in complex multiple-seam conditions is demonstrated. A coal mine under vari

    Jan 1, 2015

  • SME-ICGCM
    Load Transfer Distance Measurements at Two Mines in the Western U.S.

    By Mark K. Larson, Douglas R. Tesarik, Heather E. Lawson

    "Load transfer distance (LTD) is simple in concept and usually evident in underground coal mines. Many people in the mining industry recognize LTD as the distance from the panel to where the mine ribs

    Jan 1, 2015

  • SME-ICGCM
    Highwall Control At Homestake's Open Cut Mine

    By Don Berger

    Highwall scaling, bolting and technical blasting are important aspects in the remediation of existing highwall exposures. Proper planning, design and research are important first steps in the developm

    Jan 1, 1996

  • SME-ICGCM
    Mine Stability Mapping

    By Collin L. Stewart

    The high cost and limited flexibility of modern longwall systems has resulted in the need for mine engineers and geologists to predict possible adverse mining areas ahead of mining and to then design

    Jan 1, 2006

  • SME-ICGCM
    Critical Roof Span Approach To Selection Of Proper Coal Mine System

    By Antoni Kidybinski

    Coal mining both with longwall and room-and-pillar method often encounters severe operational difficulties due to had roof conditions. Rooffalls at entry cross-cuts or along the rib line in longwalls

    Jan 1, 1982

  • SME-ICGCM
    Effects of Bolt Spacing, Bolt Length, and Roof Span on Bolt Loading in a Trona Mine

    By Steve P. Signer

    Researchers from the Spokane Research Laboratory of the National Institute for Occupational Safety and Health installed 39 instrumented, fully grouted bolts at six test sites in a trona mine retreat p

    Jan 1, 2001

  • SME-ICGCM
    Horizontal Stress and Coal Mines: Twenty-Five Years of Experience and Perspective

    By G. J. Hasenfus

    Although theoretical and conceptual knowledge regarding the impact of horizontal stress on underground coal mining excavations have existed since at least the mid-1900s, it wasn?t until the late 1970?

    Jan 1, 2006

  • SME-ICGCM
    Potential Application of Short Encapsulation Pull Test (Sept) Data to Project Relative Roof Control Risk

    By Yoginder Paul Chugh, Jason E. Tinsley

    "Over the last five years, the authors have compiled a database of Short Encapsulation Pull Test (SEPT) evaluations from Interior Basin (Basin) coal mines. Typically, SEPT data are analyzed to obtain

    Jan 1, 2016

  • SME-ICGCM
    A Case Study of a Low Overburden Longwall Recovery with Pre?Developed Recovery Entries

    By John C. Stankus

    The 3 Right pre-developed longwall recovery entry at Signal Peak Energy?s Bull Mountain No. 1 mine was designed to prevent the abnormal roof conditions encountered in its firsttwo recovery entries. Un

    Jan 1, 2014

  • SME-ICGCM
    Controlled Thrust And Torque Placement Of Mechanical Anchor Bolts And Their Relationship To Improved Roof Control

    By Anil Mahyera

    Under contract to the Bureau of Mines, a roofbolting machine has been developed which will: control torque on the bolthead to within 4 percent of a set point, control thrust to a low level (150 lbf),

    Jan 1, 1981

  • SME-ICGCM
    Optimisation Of Reinforcement Design Of Coal Mine Roadways (ef04df4d-16ce-4e1d-9fd1-73fd46706558)

    By Winton J. Gale

    The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of security o

    Jan 1, 1992