Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Fiber Reinforced Polymer Rockbolts for Ground Control in a Strong Jointed Rock Mass

    By Samrat Mohanty

    The construction of underground hydrocarbon storage caverns in Jurong Island, Singapore, is nearing completion. The facility, located beneath the seabed of Banyan Basin, is comprised of five storage

    Jan 1, 2014

  • SME-ICGCM
    Stress Analysis and Support Design for Longwall Mine-Through Entries (A Case Study)

    By Keith Heasley

    An eastern longwall mine was required to mine through a set of three entries located midway down the length of a panel. Of course, the mine desired to design a successful support system for the mine-t

    Jan 1, 2003

  • SME-ICGCM
    Innovative Tailgate Support For Heavy Ground: 11 Left Longwall Panel, Cyprus Shoshone Mine

    By Christopher C. Woomer

    Cyprus Shoshone Mine uses the longwall method to extract a deep, thick, pitching coal seam in the Hanna Basin of South Central Wyoming. The immediate, and main roof rock consists of weak, thinly-bedde

    Jan 1, 1995

  • SME-ICGCM
    In Situ Stress For Underground Excavation Design In A Naturally Fractured Rock Mass

    By Andrew J. Hyett

    The ISRM commission on testing methods has recently presented Suggested Methods for rock stress determination (Kim & Franklin, 1987). This proposes that even if the magnitude of in situ stress is not

    Jan 1, 1989

  • SME-ICGCM
    Automation Of A Progressive Failure Procedure For Analysis Of Underground Mine Pillar Designs

    By N. P. Kripakov

    The U.S. Bureau of Mines (USBM) is conducting research to develop a practical computer-based tool that will allow coal mine planners to anticipate rock mass behavior surrounding mine entries prior to

    Jan 1, 1994

  • SME-ICGCM
    Experimental Study of Acoustic Emission Characteristics for Burst-prone Coal/Rock Fracture Process

    By Liu Changyou

    This paper analyzes experimentally the stress-strain relationship and the characteristics and variation trends of acoustic emission signals of the medium- and high-burst-prone coal/rock fracture proce

    Jan 1, 2003

  • SME-ICGCM
    Mine Planning For Longwall And Pillar Retreat Panels Subject To Seam Interaction Effects

    By Thomas L. Vandergrift

    Multiple-scam mining is becoming more common in the United States, especially in the East, where primary reserves arc being depleted, forcing mining companies to develop secondary seams, Although mine

    Jan 1, 2000

  • SME-ICGCM
    Behavior of Welded Wire Mesh Used for Skin Control in Underground Coal Mines

    By Murali M. Gadde

    Welded wire mesh is the most commonly used skin control technique in the United States underground coal mines. Currently, selection of the mesh is based on trial and error rather than any rigorous des

    Jan 1, 2006

  • SME-ICGCM
    Stability Mapping as a Tool for Production Planning at Bowie No. 3 Mine

    By Collin Stewart

    Bowie Resources, LLC (Bowie) has been using the Stability Mapping System (SMS) developed by Dr. Keith Heasley, West Virginia University, since 2005. Seven three-entry longwall gateroads, four longwall

    Jan 1, 2007

  • SME-ICGCM
    Roof Screening for Underground Coal Mines: Recent Developments (45f180e8-0601-41d7-bc8b-2e9de87bd46d)

    By Craig Compton

    Falls of small pieces of rock from between roof bolts continue to cause fatalities and to injure hundreds of coal miners each year. Roof screen is the most effective way to prevent these incidents,

    Jan 1, 2007

  • SME-ICGCM
    Simulation Test on Accumulation Laws of Paste-Like Slurry in Cavity Goaf of a Coal Mine

    By Boqiang Wu, Ganggang Xu, Xiaodong Wang, Hai Wang, Shibin Zhu

    "Using a paste-like slurry as a filling from the ground surface to the goaf, artificial pillars can be built in the cavity goaf to support the goaf roof to prevent roof collapse and ground subsidence.

    Jan 1, 2018

  • SME-ICGCM
    Mining Method For Extracting An Eight Metre Coal Horizon Containing A Sandstone Layer

    By Freddie Hunter

    An underground mining method for extracting an eight metre (26') coal horizon, containing a sandstone layer. A decrease in the thickness of the rock strata between the number two and number th

    Jan 1, 2003

  • SME-ICGCM
    Eclipse Bolting System

    By Alan Campoli

    The Eclipse System was developed by Minova USA Inc. formerly Fosroc Inc. to improve the performance of 5/8-inch deformed rebar fully grouted into a one inch borehole. An 1/8-inch offset bolt head comb

    Jan 1, 2003

  • SME-ICGCM
    A Comparison between Empirical and Numerical Methods in Underground Galleries Support System Design

    By Saeed Zandi, Kazem Oraee

    "Tunnels and galleries are the most important structures in coal mines. They are used for variety of purposes, such as transporting ore and people and for ventilation. A well-designed support system i

    Jan 1, 2016

  • SME-ICGCM
    Enlightening Bolts: Using Distributed Optical Sensing to Measure the Strain Profile along Fully Grouted Rock Bolts

    By Andrew Hyett

    Over the last 30 years, a transition away from end-anchored bolts to fully grouted rock bolt systems has occurred in many underground mines. It seems geomechanically intuitive that the success of such

    Jan 1, 2013

  • SME-ICGCM
    Strata Control Advances At Jim Walter Resources, Mining Division

    By Eddie Martin

    Jim Walter Resources, Mining Division, employs the retreat longwall mining system as the primary method of coal production. The strata control aspects of developing and maintaining roadways for retrea

    Jan 1, 1988

  • SME-ICGCM
    Directional Rock Bolt Pullout Tests as Index Tests for Estimating Rock Mass Quality

    By Michael Alber

    Pullout tests on resin grouted rock bolts have been executed in coal mines and surface test sites. The goal of this study was to provide some qualitative information about the rock mass quality from m

    Jan 1, 2003

  • SME-ICGCM
    Enhanced Surface Control For Roof And Rib Support (8fec630d-2a24-4d9d-8993-15ef5bf95858)

    By Stephen C. Tadolini

    The risk of injury caused by minor roof falls continues to increase in underground mining. Most ground control injuries result from small rock falls that occur in a supported area, but do not involve

    Jan 1, 2001

  • SME-ICGCM
    Application Of A Static And Geophysical Monitoring System For Detection Of Stability Problems

    By Maleki. Hamid

    The U.S. Bureau of Mines implemented an inte¬grated static and geophysical monitoring program in a southern Wyoming mine to study changes in seismic wave propagation properties in roof strata. The pur

    Jan 1, 1993

  • SME-ICGCM
    Improvement in Roof Support Systems at a New Underground Coal Mine Developed from Open-Cut Highwall in Indonesia

    By Takashi Sasaoka

    Indonesia is the second largest coal exporter to Japan, accounting for about 30 M tons annually. They produced about 150 M tons in 2005, over 99% of which being from open-cut mines [1]. However, t

    Jan 1, 2007