Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    A Study Of Displacement Field Of Main Roof In Longwall Mining And Its Application

    By Deren Zhu

    Based on the results of in-situ observations and physical model analysis, a computer simulation method, FEAEBP, has been developed to predict the behaviors of main roof breakage in longwall mining by

    Jan 1, 1989

  • SME-ICGCM
    Direct determination of failure surfaces in earth slopes

    By S. L. Huang

    The location and shape of potential failure surfaces in soil slopes were directly determined based on the stresses induced in the soil mass and the strength of the soil itself. Stress calculations wer

    Jan 1, 1989

  • SME-ICGCM
    Geotechnical Mapping By Seismic Imaging In Underground Mines

    By W. J. Mcgaughey

    A crosshole seismic imaging (tomography) experiment has been carried out in an underground mine in order to delineate waste rock within a massive sulphide ore body. Data comprising 1526 travel time me

    Jan 1, 1989

  • SME-ICGCM
    Changes In The Seismic Properties Of The Cover Produced By Longwall Mining

    By Guoqi He

    Common offset seismic data collected over two active longwall panels at different stages of mining reveal that significant arrival time delays are produced in reflections from different levels within

    Jan 1, 1989

  • SME-ICGCM
    Longwall Mining in Illinois: A Controversy over Planned Subsidence of Flat Farmland

    By Daniel Barkley

    Underground coal mining in Illinois has a lengthy history dating back to the early 1800?s. High extraction underground mining has played a significant role in production through out this time. Mode

    Jan 1, 2007

  • SME-ICGCM
    Coal and Gas Outburst in a Coal Mine Shaft Development: A Case Study

    By Mingju Liu

    China has been suffering from coal and gas outbursts since 1950s. Nowadays, the situation has become worse than ever with the need to mine deeper coal deposits at higher production rates in a more com

    Jan 1, 2007

  • SME-ICGCM
    Techniques To Investigate Subsidence Events Over Inactive Room-And-Pillar Mines (f8b483c2-2524-4334-950b-cd6315d7aeaa)

    By Yi Luo

    Subsidence events occurred over inactive room and pillar (R&P) mines, including abandoned mines or sealed portions of active mines, are classified as unplanned subsidence because of their timing and d

    Jan 1, 2009

  • SME-ICGCM
    System behavior analysis of the ground movement around a longwall

    By Jian Wu

    In this paper, the surrounding rocks and the supports in a longwall are taken as an integral, i.e. a system. The structural characteristics and behavior of the system are discussed based on in-situ ob

    Jan 1, 1989

  • SME-ICGCM
    Ropes mine crown pillar rock mechanics

    By W. G. Pariseau

    A crown pillar cave occurred at the Ropes Mine in December, 1987, that resulted in closure of the mine. Production was resumed soon afterwards with the formulation of a rock mechanics plan designed to

    Jan 1, 1989

  • SME-ICGCM
    Effects of Rock/Coal Interface Property on Coal Pillar Strength

    By Jun Lu

    There are many factors affecting the strength of pillar, including width-to-height (W/H) ratio, mechanical properties of coal and surrounding rocks, property of partings in the coal, and the interface

    Jan 1, 2008

  • SME-ICGCM
    Cavability Study Of A Competent Roof - A Case Study

    By T. N. Singh

    An evaluation was made on the cavability of the roof formation of Dishergarh seam including caving sequence, caving span, and load on powered support.

    Jan 1, 1994

  • SME-ICGCM
    An analysis of roof-pillar-weak floor interaction in partial extraction room-and-pillar mining

    By W. M. Pytel

    The applicability of the beam theory in analysis of roof- pillar-weak floor interaction in partial extraction room-and-pillar mining is presented. The mine structure is modeled as an equivalent multi-

    Jan 1, 1989

  • SME-ICGCM
    Numerical simulation of coal pillar loading with the aid of a strain-softening finite difference model

    By A. T. Iannacchione

    Numerical simulation of coal pi1lar loading has traditionally been a difficult task due to the unique and highly variable properties of coal and the inability of numerical procedures to duplicate thes

    Jan 1, 1989

  • SME-ICGCM
    Cost Preventive System To Control Unstable Roof In Main Line Haulage Entries

    By John Popovich

    The MICON RokLok binder system including component and consolidation processes and safety and its first aide are described. The implementation procedures and selection of injection parameters are disc

    Jan 1, 2001

  • SME-ICGCM
    Factors Influencing the Occurrence of Coal Pillar Bumps at the 9-Right Section of the Olga Mine

    By David C. Oyler

    The Bureau of Mines conducted research at the 9-Right Section of the Olga Mine to determine the cause of bumps and aid in the development of appropriate control techniques. The purpose of this paper i

    Jan 1, 1987

  • SME-ICGCM
    Classification of Chock Shields Behaviour in an Indian Longwall Mine in Real Time

    By Srinivasulu Tadisetty

    The productivity and safety of Indian longwall operations are insignificant because of complex geomechanical conditions. Therefore, the continuous monitoring and forecasting of abnormalities is impera

    Jan 1, 2006

  • SME-ICGCM
    A Mine Evaluation Protocol Using Applied Rock Mechanics Techniques

    By Gary B. Petersen

    The author has developed a seven-step process called the Applied Rock Mechanics (ARM) Protocol that the author has used to solve numerous roof stability problems in mines throughout North America sinc

    Jan 1, 2012

  • SME-ICGCM
    Top Coal Failure Mechanism Of Extremely Thick Seam In Top Coal Caving Mining (b4774a45-fd0f-4916-8ea9-0dac0bf96077)

    By Nan Hua

    As a high production and high efficient mining method, top coal caving method is now widely used in China. However, as more extra-thick coal seams are mined, it becomes more and more difficult to make

    Jan 1, 2009

  • SME-ICGCM
    Field Monitoring of Rock Bolting Performance in Weak Roof Strata

    By Tingkan Lu

    To understand the reinforcing mechanisms of the fully grouted resin bolt and clarify its performance in weak roof strata, the field monitoring investigation using instrumented bolts has been conducted

    Jan 1, 1998

  • SME-ICGCM
    A Review of Effective Parameters on Roof Fall During Retreat Mining in Room and Pillar Coal Mines

    By Ebrahim Ghasemi

    Problem statement: One of the most challenging safety problems in room-and-pillar coalmines is controlling roof falls during retreat mining. Roof falls not only cause both fatal and non-fatal injuries

    Jan 1, 2012