Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • TMS
    The Kivcet Furnace Construction at Portovesme

    By A. Perillo

    The process, realized in. the Kivcet furnace, can convert continuously lead concentrates, residues and secondary lead bearing materials into a lead bullion free of sulphur and a discardable slag. The

    Jan 1, 1990

  • TMS
    Recovery of Specialty Metals, Mainly Germanium and Indium from Zinc Primary Smelting

    By J. M. Demarthe

    The recovery of minor metals from zinc concentrates is dependent on the process used for their treatment. The behaviour of gennanium and indium in pyrometallurgical processes such as the Imperial Smel

    Jan 1, 1990

  • TMS
    Integration of Direct Leaching of Zinc-Based Sulphidic Concentrates and the Vieille-Montagne Goetifite Process

    By Thierry De Nys

    A direct leaching process of sulphidic zinc-based concentrates in aqueous sulphuric acid solutions has been developed by the V.M. R & D Department. By a very accurate control of the oxidation potentia

    Jan 1, 1990

  • TMS
    The New Cominco Lead Smelter at Trail

    By M. J. Walker

    The lead .smelter at Cominco's operations at Trail, B.C. has been undergoing. a modernization program since 1986. In that year a contract agreement was reached with German-based Lurgi GmbH which

    Jan 1, 1990

  • TMS
    Secondary Lead Blast Furnace Smelting at East Penn Manufacturing Co., Inc.

    By Kenneth N. Pike

    The need to comply with environmental regulations and increase production has resulted in modifications to the East Penn blast furnace operation. Changes made include furnace design modifications, clo

    Jan 1, 1990

  • TMS
    Zinc Industry in the 1990s

    By Gary A. Wickham

    In the zinc industry, this past decade has seen both prosperity and depression. Significant changes have occurred throughout the world in mining, smelting, refining, and marketing. This paper will re

    Jan 1, 1990

  • TMS
    Silver Leaching Fundamentals

    By D. M. Wyslouzil

    The fundamentals of dissolving silver and silver minerals are discussed in the following sections: 1) Basic chemical reactions in the silver system 2) Leaching of pure silver minerals 3) Leaching o

    Jan 1, 1990

  • TMS
    The Monaca Electrothermic Smelter - The Old Becomes The New

    By Roger L. Williams

    The Zinc Corporation of America Monaca smelter continues to use the St. Joe-developed electrothermic process for producing zinc metal and zinc oxide. As we enter the 1990s, the electrothermic process

    Jan 1, 1990

  • TMS
    Use of Natural Gas and Evaporative Cooling for Slag Fuming at the Chimkent Lead Plant, USSR

    By K. S. Izbakhanov

    The Chimkent Lead Plant was constructed in 1934 and since that time has undergone many revisions. In 1975 the slag fuming operation was changed from pulverized coal to natural gas fuel. In 1981 the sl

    Jan 1, 1990

  • TMS
    Mineralogical Characteristics that affect Recoveries of Galena from Base Metal Ores

    By William Petruk

    Mineralogical and image analysis studies have been performed on four volcanogenic base metal ores that contain 0.01 to 4.5 wt% Pb to determine the behaviour of galena during mineral processing. The ga

    Jan 1, 1990

  • TMS
    Production of Zinc Oxide for Zinc Smelting Process From EAF Dust at Shisaka Works

    By N. Tsuneyama

    Sumitomo Metal Mining Company has been operating Waelz Kiln at the Shisaka Works for 12 years to recover zinc and lead from electric arc furnace (EAF) dust. To increase the capacity and cut down the o

    Jan 1, 1990

  • TMS
    A Practical Model of the Imperial Smelting Zinc-Lead Blast Furnace

    By Herbert H. Kellogg

    A model of the ISF is described. which reproduces with accuracy the "normal" operation of three industrial furnaces. The model, written in Fortran, is based on detailed heat and material balances, and

    Jan 1, 1990

  • TMS
    Electric Arc Smelting at RSR Corporation

    By Don Eby

    The application of electric arc furnace smelting of lead, antimony, and tin bearing slag from a reverberatory furnace will be discussed. The selection procedure for the 4.0 MVA electric arc furnace in

    Jan 1, 1990

  • TMS
    Top Submerged Lancing for Recovery of Zinc From ISF Slag

    By M. Waladan

    The top submerged lancing Sirosmelt system has been developed through laborator.y scale testwork and pilot plant trials for recovery of zinc from ISF slag. The effects of the process variables of gas

    Jan 1, 1990

  • TMS
    The Cellhouse Based on New Concept at Mitsubishi Akita Zinc Refinery

    In accordance with the new concept described in the paper presented at the TMS annual meeting in 1989, 1 a new zinc cellhouse was constructed and successfully operated. The new concept was proposed in

    Jan 1, 1990

  • TMS
    The Cost of Oxygen in Hydrometallurgical Processing of Refractory Gold Sulphides

    By Gus Van Weert

    The cost of oxygen is a major and common factor in the hydrometallurgical processes developed or proposed tor the oxidation of refractory pyrites. This cost involves charges for the generation and the

    Jan 1, 1990

  • TMS
    Lead Smelting in a Submerged Arc Furnace

    By H. Cepin

    Production of non-ferrous metals is still principally performed in shaft and flame fired furnaces. Electric furnaces increase metal recovery, reduce environmental burdens and decrease energy consumpti

    Jan 1, 1990

  • TMS
    Effect of Heat Treatment on Surface Morphology and Crystallography of Zn and Zn-Fe Electrogalvanized Coatings

    By M. M. Kim

    As-electrogalvanized coatings of pure Zn, Zn-11% Fe, and Zn-18% Fe coatings were characterized in terms of initial crystal structure and surface morphology. Samples were then subjected to heat treatme

    Jan 1, 1990

  • TMS
    The Continuous Pressure Filtration of Zn-Leaching Residue in a Brazilian Preparation Plant

    By Reinhard Bott

    The Companhia Mineira de Metais (Brazil) runs a Zn-recovery plant in Tres Marias, federal state Minas Gerais, Brazil. The Zn-production is about 65,000 t/a, This corresponds to a concentrate throughpu

    Jan 1, 1990

  • TMS
    Recycling Lead and Cadmium, as well as Zinc, from .EAF Dust

    By S. E. James

    EAF dust has been listed as a "hazardous waste" due to the presence of lead and cadmium, and at times chromium. The 550,00 tpy production of . .EA]' dust, estimated for the United States alone, c

    Jan 1, 1990