Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Pyromejallurgical Recovery And Thermodynaic Behavior Of Cu-Pb-Zn Sulphide Concentrates
By M. Benavides
An experimental study is carried out With sulphide ore obtained from Bailadores-Venezuela as well as artificial concentrates. Concentrates of the minerals from froth flotation are fused to study equil
Jan 1, 1983
-
Optimization Of Flash Smelter Offgas Cooling And Cleaning
By Bengt T. Andersson
Outokumpu Consulting Engineers, Outokumpu Oy SF-02200 Espoo 20, Finland This paper describes experiences from some operating non-ferrous flash -smelters and focuses on the advances in smelter byprodu
Jan 1, 1983
-
Recent Developments In Electric Furnace Smelting Technology At Mufulira Zambia
By I. S. Blair
The introduction of the 36 MVA smelting furnace at Mufulira, and the experience gained during the first five years of operation have been described previously (6). Based on this experience the furnace
Jan 1, 1983
-
A New Continuous Copper Converting Process
By K. J. Richards
The converting of copper mattes to blister copper has seen few technical advances since the introduction of batch furnaces using submerged tuyeres over a hundred years ago. The first side-blown conver
Jan 1, 1983
-
Recent Improvement At Tamano Smelter
By Shuichiro Okada
Various efforts to reduce energy consumption and smelting cost are made at Tamano Smelter. Production of anode copper has been increased by about 30 % and energy requirement has been decreased about 5
Jan 1, 1983
-
High-Pressure Injection Of Air Into A Peirce-Smith Copper Converter
By J. K. Brimacombe
Plant trials have been conducted at the Tacoma Smelter of ASARCO to assess the effect on tuyere blockage and refractory erosion at the tuyere line, of increasing the injection pressure of air into a P
Jan 1, 1983
-
Selection Of A Location For A Copper Smelter
By P. Rooney
In due course, new smelters will have to be installed in order to meet the increasing worldwide demand for copper. This paper presents the results of a study made for the purpose of identifying the mo
Jan 1, 1983
-
New And Emerg1ngtechnobogies In Sulphide Smelting
By P. J. Mackey
New and emerging, as well as proven technologies for the smelting of copper, nickel, lead and zinc are briefly reviewed. The number of new technologies available today is greater than at any time in t
Jan 1, 1983
-
Investigation Of Direct Smelting Of Copper Concentrat,Es
By R. R. Odle
A laboratory and pilot-scale investigation of direct smelting of copper concentrates was conducted to determine the effect of concentrate analysis and the degree of roasting on the yield and quality o
Jan 1, 1983
-
Thermoilynamic Behavior Of Sulfur And Oxygen In Cu-Matte, 1200°C
By J. F. Elliott
The thermodynamic behavior of sulfur and oxygen in copper matte has been measured by equilibration of the melt 00 a gas consisting of CO, SO2 and Ar. The oxygen potential ranges from 10-9 to 10-7 and
Jan 1, 1983
-
The Development Of A Tin Sulphide Fuming Process At Capper Pass Limited
By P. Halsall
Smelters of medium or low grade tin concentrates must recover a high proportion of tin from iron-bearing slags or concentrates; the volatility of tin sulphide makes possible the production of iron-fre
Jan 1, 1983
-
The Kidd Smelter Start-Up And Early Operation
By R. M. Sweetin
Detailed descriptions by operating area of the Kidd copper smelter are presented, together with accounts of complement staffing, training, and preparation activities for smelter start-up in June 1981.
Jan 1, 1983
-
Systematic Evaluation Of Copper Smelting Alternatives
By W. P. lmrie
The recent years have seen many copper smelting operations become uneconomic due to a combination of low metal prices, high energy and labor costs, environmental requirements and high investment costs
Jan 1, 1983
-
Developments In Flash Smelting At BCL Limited
By B. J. Elliot
The Outokumpu Oy flash smelting furnace was designed for a capacity of 69,5 mtph of concentrate. The history of developments on the flash furnace, from the original operating capacity of 55 mtph to a
Jan 1, 1983
-
Impurity Eliminations From Molten Copper By Alkaline Flux Injection
By S. Mondon
Hibi Smelter which is a Copper Smelter lining a blast furnace, produces 2,700 metric tons of anode copper per month. Generally, in a copper refinery, arsenic and antimony are considerably troublesome
Jan 1, 1983
-
Improvements In Smelting And Refining Of Lead At Brunswick Smelting
By M. D. Street
Lead and zinc production commenced in 1966 at Brunswick Smelting using the Imperial Smelting Process. In 1972 the blast furnace was modified to produce lead bullion only which was refined to corroding
Jan 1, 1983
-
Principles of Sulfiae Smelting
By N. J. Themelis
The basic chemical, thermal and transport principles that underlie sulfide smelting of. copper, nickel and lead are reviewed. Two basic types of modern smelting processes are distinguished?: flash-sme
Jan 1, 1983
-
Catalysis And Synergism In The Reduction Smelting Of Lead Sulfide With Carbon And Lime
By Y. K. Rao
The direct reduction of lead sulfide with carbon in the presence of lime was investigated at several temperatures and under two different inert gas atmospheres. The catalyzed reduction kinetics were d
Jan 1, 1983
-
Lime-Enhanced Reduction of Metal Sulfides
By P. M. Prasad
The last two decades have witnessed the emergence of numerous hydrometallurgical and direct processing techniques for the extraction of some metals from pocketed/lean/complex sulfide ore deposits. A n
Jan 1, 1983
-
Current ,Commercial Sulphide Smelter Operations
By V. P. Keran
The lead and copper smelting processes employed by Mount Isa Mines Limited, Mount Isa, Australia, are used to illustrate an operating viewpoint of some problems and solutions encountered in existing c
Jan 1, 1983