Search Documents

Sort by

  • SME
    3. Sample Preparation - Problem Definition

    By Pierre M. Gy

    The final purpose of exploration is to esti- mate the grade and tonnage of the various qualities of ore contained in a given mineral deposit. This estimation cannot be directly carried out on the whol

    Jan 1, 1979

  • SME
    3. Software Technology for Geophysical Systems ? Introduction

    By R. C. Fox

    The geophysical aspect of reconnaissance marks the beginning of extensive computer applications supporting development of a mine. Although there are some storage and retrieval applications in geology,

    Jan 1, 1979

  • AIME
    3. The Benson Mines Iron Ore Deposit, Saint Lawrence County, New York

    By Edward L. Beutner, Robert M. Crump

    Benson Mines low-grade iron ore reserve is a replacement deposit within the Grenville gneisses of the Adirondacks. The average grade of the crude ore is about 23 per cent iron. The iron minerals are p

    Jan 1, 1968

  • SME
    3. Underground Coal Mine Production Reporting Developments at the Bethlehem Mines Corporation ? Introduction

    By L. H. E. Weyher

    The Bethlehem Mines Corp. is a captive mining subsidiary of Bethlehem Steel Corp. Its coal production is tied to the demands for and production of steel, a situation that has to balance between the fo

    Jan 1, 1979

  • SME
    3. Use of a Ground-Water Model in Planning for Oil-Shale Mining

    By J. S. Long

    A finite-difference model using a digital computer was constructed to assist in the water management of a proposed oil-shale mining operation in the Piceance Basin in Colorado. The presence of ground

    Jan 1, 1979

  • SME
    3.1 Introductory Review ? Introduction

    When exploration shows a mineral deposit to be of importance, the subsequent work of defining the limits or boundaries of the ore body and preparing it for the extraction of the mineral is termed deve

    Jan 1, 1979

  • SAIMM
    3.1 Bissett_Jansen - Isokinetic Emission Testing

    By Allan Jansen, Robin Bissett

    [Power-Point Presentation]

    Jan 1, 2005

  • AIME
    3.13 Fuels – Coal

    By Ramesh Malhotra, Hubert E. (Deceased) Risser

    THE WORLD Coal, as a source of energy and as a source of coke for the smelting of iron ore, has contributed significantly to the development of every major industrial nation of the world A number o

    Jan 1, 1976

  • AIME
    3.14 - Metals - Iron Ore

    By Franz R. Dykstra

    DEFINITIONS The ores of iron are classified in three general categories: direct shipping, concentrates, and agglomerated-i.e., pelletized or sintered. Direct Shipping As the name implies, dir

    Jan 1, 1976

  • AIME
    3.15 – Nonmetallics - Construction Minerals

    By Robert M. Dreyer

    AGGREGATE With an annual domestic production of over 1.6 billion tons at a value of over $2 billion (see Table 15.1.1), the production of aggregate (crushed rock, sand, and gravel) is a basic indus

    Jan 1, 1976

  • AIME
    3.15.4 - Other Nonmetallics - Abrasives

    By Robert M. Dreyer

    During the past two decades, synthetic abrasives have taken over successively greater percentages of the high-grade abrasive market, so that now, with the exception of natural diamonds (discussed in s

    Jan 1, 1976

  • SAIMM
    3.2 Lotz - Sampling For Cyanide In Metallurgical Processes

    By Peter W. Lotz

    Contents of: ?Sampling for Cyanide in Metallurgical Processes? ?Sampling at process level of operation ?Sampling at environmental level ?Sample stability and integrity issues ?each citing possi

    Jan 1, 2005

  • SME
    3.2 Ore-Body Modeling - 1. Technical Overview ? Introduction

    By B. T. Stanley

    The basic geological data, derived from boreholes, exploratory test pits, drivages, and mine development, include information on parameters such as ore thicknesses, grades, depths below surface, struc

    Jan 1, 1979

  • AUSIMM
    3.26 GA Black Smoker-Type Textures and Setting of VMS Mineralisation in the Pilbara Craton, Western Australia: Ancient Analogues of Modern Pacific-Rim Processes

    By R Kerrich

    Early-Archaean (3.26 Ga) volcanogenic massive sulphide (VMS) deposits located within the low strain and sub-prehnite-pumpellyite metamorphic-grade Strelley greenstone belt, East Pilbara, Western Austr

    Jan 1, 1995

  • SME
    3.3 Open-Pit Limits Analysis - 1. Technical Overview

    By Y. C. Kim

    One aspect of long-range mine planning in an open-pit mine is first to define the ultimate pit limit, i.e., the projected size and shape of the pit at the end of its life. This chapter is concerned wi

    Jan 1, 1979

  • SAIMM
    3.4 Biotrack - Environmental Assessment ,Monitoring And Interpretation

    By Mark Dangerfield

    [Power-Point Presentation]

    Jan 1, 2005

  • SME
    3.4 Long-Range Mine Planning - Mining Sequence - 1. Technical Overview

    By R. K. Davey

    Subsequent to the determination of an ultimate pit and ore reserves for metallic and nonmetallic deposits, it is necessary to develop the most profitable long-range mining sequence for the deposit. Lo

    Jan 1, 1979

  • SME
    3.5 Engineering and Environmental Aspects of Surface Mine Design - 1. Technical Overview

    By David J. Hammel

    This chapter will summarize some of the important applications in the geotechnical (pit slope, spoil pile and tailings stability, and hydrology), the environmental (including reclamation), and equipme

    Jan 1, 1979

  • SME
    3.6 Underground Long-Range Planning and Design - 1. Technical Overview - Introduction

    By S. C. Suboleski

    Underground long-range planning and mine design is an iterative process beginning with a specified production level, quality criteria, and geology of the deposit. Given these factors, face equipment i

    Jan 1, 1979

  • SME
    3.7 Mine Valuation - 1. Technical Overview

    By Donald W. Gentry

    Mine valuation is a multifaceted, interdisciplinary process by which the economic viability of an old, existing, or new mining property or venture is determined. The problems associated with arriving

    Jan 1, 1979