Search Documents

Sort by

  • NIOSH
    A Case Study in Applied Social Marketing: Developing an Occupational Safety and Health Product

    By Douglas F. Scott

    This case study provides an example of how social marketing was applied to meet the needs of business customers. Federal regulations require that all companies develop a written program to track hazar

    Jan 1, 2009

  • DFI
    A Case Study In Hand-Dug Caissons ? Synopsis

    Caissons hand dug to a depth of about 100 feet were used to underpin three important structures at an industrial site in the State of Utah. The caisson shafts extended through 30 to 40 feet of coarse,

    Jan 1, 2010

  • AUSIMM
    A case study in managing a high consequence geotechnical risk in a Queensland coalmine

    By K Young, M Martin, D Payne

    This paper outlines the evolution of managing high consequence risk scenarios in BHP Coal, with particular focus on managing the stability of an endwall that is adjacent to a public infrastructure cor

    Nov 29, 2022

  • AUSIMM
    A Case Study in Optimising Fragmentation

    By R Crookes

    Mine to Mill optimisation is not a recently developed concept. It is one which is finally gaining greater acceptance in the Australian Mining Industry, possibly as a consequence of the downturn in mar

    Jan 1, 2000

  • AUSIMM
    A Case Study in Optimising Fragmentation

    By R Crookes

    Mine to mill optimisation is not a recently developed concept. It is one which is finally gaining greater acceptance in the Australian mining industry, possibly as a consequence of the downturn in mar

    Jan 1, 1999

  • AUSIMM
    A Case Study In Ore Reserve Procedures At Mount Lyell

    By Rowe J

    The case study is based on the largest ore deposit at Mt. Lyell; the Prince Lyell deposit, comprising a regular lensoid mass of dissemina- ted and vein pyrite-chalcopyrite mineralisation. Reserve est

    Jan 1, 1979

  • SME
    A Case Study in Successful Progressive Design Build Tunneling - RETC2023

    By Nik Sokol, Mike Jaeger, Leo C. Weiman-Benitez

    Silicon Valley Clean Water signed a progressive-design-build (PDB) contract with Barnard Bessac Joint Venture (BBJV) to design and construct the Gravity Pipeline tunnel in Redwood City, CA. Owner and

    Jun 13, 2023

  • SME
    A Case Study In The Use Of Kinetic Models To Justify Expansion Of The Rougher Flotation Circuits At The Metcalf Concentrator

    By Richard C. Travis, Edward C. Dowling

    A detailed kinetic study of the flotation installation at the Metcalf Concentrator revealed a rougher flotation circuit operating under less than optimal conditions. Based on these results, a project

    Jan 1, 1993

  • SME
    A Case Study In Valuation Of Non-Producing Mineral Rights

    By Donald E. Warnken

    The Study concerns the estimation of fair market value (FMV) of non-producing mineral rights. Two approaches to value are used and the values determined by each are compared. The Study area environmen

    Jan 1, 2005

  • AUSIMM
    A Case Study into the Treatment of Low Grade Austalian Gold Ores Heap Leaching vs Carbon-in-Pulp

    By Noakes MJ, Willsteed TV

    In the past few years an elevated gold price has resulted in the evaluation of many small scale surface gold deposits in Australia typically containing about 2-3 g/t Au. Operators have tended to assum

    Jan 1, 1984

  • SME-ICGCM
    A Case Study Of A Deformation Mechanism Around A Two-Entry Gate-Road System Involving Probable Time-Dependent Behavior

    By M. K. Larson

    The U.S. Bureau of Mines and Cyprus Shoshone Coal Corp. conducted a study of deformation mechanisms around a longwall gate-road system in an underground coal mine. Of particular interest was roof defo

    Jan 1, 1995

  • SME-ICGCM
    A Case Study of a Low Overburden Longwall Recovery with Pre?Developed Recovery Entries

    By John C. Stankus

    The 3 Right pre-developed longwall recovery entry at Signal Peak Energy?s Bull Mountain No. 1 mine was designed to prevent the abnormal roof conditions encountered in its firsttwo recovery entries. Un

    Jan 1, 2014

  • DFI
    A Case Study Of A Vibratory Pile Installation Monitoring Of A Precast Prestressed Concrete Pile

    By K. Viking

    It's well known that conventional impact hammers, usually are the method to use in order to drive precast prestressed concrete piles. However sometimes the vibratory technique might be considered

    Jan 1, 2004

  • SME-ICGCM
    A Case Study Of Abandoned Mine Subsidence At Dominion, Nova Scotia, Canada, 2002-2003

    By Dave Forrester

    Mining subsidence over shallow abandoned coal mine workings is unfortunately not an uncommon experience in the coalfields of North America and there is a significant knowledge and literature base addr

    Jan 1, 2004

  • ISEE
    A Case Study of Blast Damage Evaluation in Open Stope Mining at Kidd Creek Mines

    By Hung Tran, Qian Liu, Patrick Andrieux, Dave Counter

    Blast damage in open stope mining has been an important concern in controlling ore dilution. Severe damage to the surrounding rock mass can result in the caving of waste rock and/or backfill materials

    Jan 1, 1998

  • NIOSH
    A Case Study Of Bolt Performance In A Two-Entry Gateroad

    By Stephen P. Signer, John L. Lewis

    This paper presents the results of a case study conducted in a two-entry gateroad in a coal mine where excessive roof deformation and bolt loading resulted in failure of many roof supports. The instru

  • SME-ICGCM
    A Case Study of Bolt Performance in a Two-entry Gateroad

    By Stephen P. Signer

    This paper presents the results of a case study conducted in a two-entry gateroad in a coal mine where excessive roof deformation and bolt loading resulted in failure of many roof supports. The instru

    Jan 1, 1998

  • SME
    A Case Study Of Controlled District Recirculation

    By A. B. Cecala

    An evaluation was recently performed on a district recirculation system at a trona mine in Granger, Wyoming. A 1.52m (5 ft) diameter, 37.3kw (50 hp) vane axial fan was installed in a crosscut between

    Jan 1, 1991

  • DFI
    A Case Study Of Deep Shaft Excavation In River Channel Soil Deposit In Kolkata

    By Kaustuv Bhattacharya, Manish Kumar, Nirbhay Singh, Prodyot Kr. Ray, Praveen Soin

    This paper highlights salient features of an excavation 38 m (Length) by 10 m (Width) by 24 m (Depth) carried out in Central Kolkata. Secant pile wall (SPW) formed using a combination of alternating 1

    Sep 1, 2022

  • ISEE
    A Case Study of Dimensional Stone Blasting in Korea

    By Choon Sunwoo, Chang-Ha Ryu

    There are various methods available for the recovery of dimensional stone in open pit quarries. Explosive blasting has more advantages in the economic point of view over the other methods but was not

    Jan 1, 2003