Search Documents

Sort by

  • SME
    North Auckland Line—Tunnel Refurbishment - RETC2021

    By Shu Fan Chau, Innes Duncan, Harry Asche, Bill Newns

    The North Auckland Line (NAL) in Northland, New Zealand, is being upgraded to pass Hi-Cube containers. The line includes many tunnels and bridges which need to be refurbished to improve structural cle

    Jun 13, 2021

  • SME
    Emerging Data Processing Technologies for TBM Projects— State of the Art and Outlook - RETC2021

    By Ulrich Maidl, Jamal Rostami, Ulf Gwildis

    Tunnel Boring Machines (TBM) have more or less become the preferred method of tunneling in various ground conditions and Programmable Logic Controllers (PLC) or microprocessors are standard features o

    Jun 13, 2021

  • SME
    Construction of the Plymouth Tunnel by SEM Based on a Permanent Shotcrete Liner for The Purple Line Project in Maryland: A Case Study - RETC2021

    By Nicholas Tabor, Norbert Fuegenschuh, Richard Taylor, Jean-Marc Wehrli

    The Plymouth Tunnel forms part of the 16-mile long route of the Purple Line Light Rail Project promoted by the Maryland Transit Administration. The tunnel is approximately 1,220 feet in length with a

    Jun 13, 2021

  • SME
    Geotechnical Investigation and Design for the Sister Grove Outfall Tunnels - RETC2021

    By Michael Schultz, Gregory Sanders

    In 2017, the North Texas Municipal Water District (NTMWD) initiated the design of the Sister Grove Regional Water Resource Recovery Facility (SGRWRRF) to provide additional treatment capacity for futu

    Jun 13, 2021

  • SME
    Robotic Mining and Micro Tunneling Using Hypersonic Projectile Impact Technology: Field Trial Results, Technical Evaluation and Economic Valuation - RETC2021

    By Mark C. Russell, Charles T. Russell, Brooke Colburn, Parker Bailey, Desiree Bernhard, Kaito Durkee, Tristen Cutshall, Rob P. H. Urselmann

    Hypersonic tunnel boring (HTB) uses directed, high velocity projectile impacts to remove rock. HTB is highly independent of rock strength and targets hard, abrasive rock and variable rock environments

    Jun 13, 2021

  • SME
    Tailskin Brushes Replacement Under Difficult Ground Conditions—3RPORT Project - RETC2021

    By Francesco Chiappalone, Daniele Nebbia, Lance Waddell, Greg Colzani

    As part of the 3RPORT Project, a 5-mile tunnel is being excavated underneath the three rivers of Fort Wayne using a 19-foot diameter Slurry Tunnel Boring Machine. The groundwater pressure at the tunne

    Jun 13, 2021

  • SME
    Challenges in Rebooting Geotechnical Investigations - RETC2021

    By Mala R. Ciancia

    Planned tunnel projects with advanced geotechnical investigations are more frequently being suspended because of changes in funding, politics, or local priorities. Some of these projects are ultimatel

    Jun 13, 2021

  • SME
    Calibration Techniques for Discrete Element Method Analysis in Soft Ground TBM Applications - RETC2021

    By Glenn Mongillo

    Discrete Element Method (DEM) software has been successfully used to simulate various machine/soil interactions and provide insight for industries such as mining and bulk material processing. This pap

    Jun 13, 2021

  • SME
    Contracting Practices for Underground Freight Transportation Projects: A Look at Cargo Sous Terrain - RETC2021

    By Jürg Künzle

    The use of the underground space has been a recurring issue in human history, whereas the reasons for building subsurface structures have changed over time. In the decades to come, the world will be m

    Jun 13, 2021

  • SME
    Quantification of Tangible and Intangible Benefits of Digitalization in Tunnel Construction - RETC2021

    By Angus Maxwell, Jacob Grasmick

    As the tunneling industry continues to adopt Tunnel 4.0, digital twins of the tunnel construction site are becoming standard requirements for tunneling projects. However, the benefits of these remain

    Jun 13, 2021

  • SME
    Design and Construction Challenges at the Potomac River Tunnel in Washington DC - RETC 2021

    By Moussa Wone, Martino Scialpi, Colin LaVassar, Carlton Ray

    The Potomac River Tunnel (PRT) is the next major phase of the DC Clean Rivers Program. The design-build PRT project includes a 5.5-mile-long, 18-foot-internaldiameter tunnel, seven shafts, and two und

    Jun 13, 2021

  • SME
    Tunneling Under Highway 401: Construction of Large Diameter Pre-Support Pipe Canopy - RETC2021

    By Tyler Lahti, Peter Borgacci, Mary Jane Ferraro, Prakash Nadesparan

    Toronto Tunnel Partners (TTP), under contract to Metrolinx/IO, is constructing new twin rail tunnels under the Highway 401 & 409 interchange to accommodate additional tracks to support the GO Expansio

    Jun 13, 2021

  • SME
    High-Speed 3D Tunnel Inspection in Subway Tunnels— Case Study San Francisco BART - RETC2021

    By Thomas Pea, Heiner Kontrus, Jérôme Steinkühler

    In tunnel condition assessment, the trend is towards comprehensive 3D measurement combined with high quality image texture to document and quantify damages to the tunnel surface and to create a cohesi

    Jun 13, 2021

  • SME
    The Effect of TBM Diameter on Ring Installation Time - RETC2021

    By Jamal Rostami, Tala Tahernia

    TBM utilization rate is a component of machine performance prediction and critical for developing a reliable estimate of the construction completion time and cost of the tunnel. Estimation of the util

    Jun 13, 2021

  • SME
    Design and Construction of Load Transfer System to Replace Existing 39th Street Bridge Piers with New Integral on the Track B/C Approach Structure for the East Side Access Project - RETC2021

    By Julio C. Martinez, Jeffrey L. Rice, Hayden Weschler

    This paper details the extensive underpinning required to hold up the 39th street Bridge while demolishing its massive support piers and building a 30ft deep Cut/ Cover RR tunnel beneath it. The under

    Jun 13, 2021

  • SME
    The Variable Density TBM—Current Level of Development - RETC2021

    By Werner Burger

    After its first introduction in 2013, Variable Density TBMs have increased their application significantly in mechanized closed mode tunneling. Throughout a variety of successfully completed and ongoi

    Jun 13, 2021

  • SME
    Utilizing “Big Tex” for the Dallas Mill Creek Drainage Relief Tunnel - RETC2021

    By Paul J. Smith, Eudomar A. Silva, Quang D. Tran, J. Milton Brooks

    The Dallas Mill Creek Drainage Relief Tunnel is an 8.04 km (5 mile) tunnel that will provide 100-year flood protection for impacted neighborhoods in the east Dallas area. “Big Tex” is a main beam grip

    Jun 13, 2021

  • SME
    Real Challenges of Digging a Shaft in Free Phase Oil and Hydrocarbons - RETC2021

    By Ehsan Alavi, Sanjeer Yogendran, Savreet Singh

    The Don River & Central Waterfront Coxwell Sanitary Bypass Tunnel Project in Toronto extends approximately 10.5 km from Ashbridges Bay Treatment Plant west under Lake Shore Boulevard, north under Bayv

    Jun 13, 2021

  • SME
    Construction of Ottawa’s Combined Sewage Storage Tunnel (CSST) - RETC2021

    By Alejandro Sanz Garrote, Juergen Laubbichler, Fernando Triana Gracian, Paz Navarro Gancedo-Rodriguez, Andreas Feiersinger

    The Combined Sewage Storage Tunnel (CSST) is part of the Ottawa River Action Plan and will greatly reduce the frequency of sewage overflows into the Ottawa River during storms. The project consists of

    Jun 13, 2021

  • SME
    Design Development of the Brushy Creek Regional Utility Authority Phase 2 Raw Water Delivery System Project - RETC2021

    By Aaron Archer, James Parkes

    This paper presents design considerations for the major underground elements of the pending BCRUA Phase 2 Raw Water Delivery System Project. These elements include two Lake Taps; an 8,800 LF, minimum

    Jun 13, 2021