Transitioning from Mixed-Face Conditions to Hard Rock During TBM Launch on the Reedy River Basin Sewer Tunnel Project— Greenville, SC - RETC2021
By Horry Parker Jr, Jason Gillespie, Justin Kolster, Stephen O’Connell
Construction of the 5,932-ft Reedy River Basin Sewer Tunnel in Greenville, SC was marked by a critical transition from drill-and-blast mining in mixed-face conditions to TBM excavation with limited ro
Jun 13, 2021
-
Dustless Hard Rock Tunneling Methods - RETC2021
By Cody Giroux, Homer Scurlock, Michel Wasag
Silica and Crystalline Quartz exposure continues to be a serious health threat to nearly 2 million workers in the United States, including more than 100,000 working in high risk jobs such as abrasive
Jun 13, 2021
-
Two-Component Backfill Grouting at the Three Rivers Protection and Overflow Reduction Tunnel: Above and Below Ground Challenges and Solutions - RETC2021
By Francesco Chiappalone, Tanner Murt, Lance Waddell, Cristina Oñate Salazar
The 3RPORT project is a 5-mile-long, 16-foot-internal-diameter tunnel excavated in hard rock by Slurry TBM in Fort Wayne, Indiana. Two-component grouting can be separated into two core areas of operat
Jun 13, 2021
-
Review of Measured Activity Times and Their Impacts on Machine Utilization in Operation of Selected TBMs - RETC2021
By P. Nelson, R. O’Connell, J. Rostami
Tunnel boring machine (TBM) system utilization is a critical factor for predicting machine performance. The process of estimating machine performance, including rate of penetration (ROP) and machine u
Jun 13, 2021
-
Design and Construction of a Deep Underground Station in Urban Area - RETC2021
By Verya Nasri
This paper will present the design and construction of a deep underground station of the Réseau Express Métropolitain (REM) project; the Édouard Montpetit station. The Édouard-Monpetit station is an i
Jun 13, 2021
-
Methodologies for Sound Transit’s Proposed New Tunnels for LINK Light Rail Expansion - RETC2021
By Matthew Preedy, Anthony Pooley, Mike Wongkaew, Dirk Bakker, Raghu Bhargava
Sound Transit’s ST3 program will add 62 miles of light rail to the Puget Sound area, including connections to the neighborhoods of West Seattle currently anticipated by 2031 and Ballard by 2036. These
Jun 13, 2021
-
Design and Construction of the New Stormwater Storage and Drainage Tunnel System in the Michigan I‑75 Modernization Segment 3 P3 DBFM Contract - RETC2021
By David Mast, Amanda Foote, Mina Shinouda
The Michigan DOT’s I‑75 Modernization Project, Segment 3, is a 30-year, $1.2 Billion design-build-finance-maintain project in Southeast Michigan. The scope includes building a nearly 4-mile long, 14.5
Jun 13, 2021
-
Respirable Crystalline Silica Dust—Practical Impacts and Solutions in Tunnelling - RETC2021
By Rainer Antretter
While respirable crystalline silica (RCS) dust that arises in industrial production mostly emanates from point sources and can be well mitigated, the extraction of dust is much more difficult in under
Jun 13, 2021
-
High-Frequency InSAR Displacement Monitoring and Trend Detection Analysis for Tunneling Projects - RETC2021
By Marie-Josée Banwell, Cyriac Sebastian, Giacomo Falorni, Sara Del Conte
Interferometric Synthetic Aperture Radar (InSAR) is a satellite-based monitoring technique that complements other in-situ methods for detecting and measuring surface displacement. Recent advances in d
Jun 13, 2021
-
Upgrading the Coal Creek Trunk Sewer - RETC2021
By Joseph Clare
It’s not the 1960s anymore. Upgrading wastewater pipelines in the current era demands the latest trenchless technology to minimize impacts. King County Wastewater Treatment Division in Seattle, Washin
Jun 13, 2021
-
Automatic Computation of TBM Face Pressure Using 3D Ground Model - RETC2021
By CK Tsang, Jack Muir, Dharman Gersch, Joshua Barry
Correct face pressure is critical to safe operation of a closed face TBM. If inadequate face pressure is applied, this will lead to excessive ground movement, and may result in collapse of the tunnel
Jun 13, 2021
-
Tunneling in Toronto Shale—Construction of Coxwell Bypass Tunnel Project - RETC2021
By Ehsan Alavi, Daniel Cressman, Tatiana Chiesa, Robert Mayberry
The City of Toronto’s Coxwell Bypass Tunnel (CBT) is currently being constructed by North Tunnel Constructors ULC. The scope of the CBT project includes construction of approximately 10.5 km of 6.3 me
Jun 13, 2021
-
Tunnel Induced Settlement and Impact Analysis Automation and 3D Visualization - RETC2021
By Camilo Quintero, Frank Cesario, John Kinnear, Brian Boye
In this paper, an innovative approach was adopted to automatically calculate the effects of tunnel induced settlement on buildings and utilities. The approach resulted in increased output quality, con
Jun 13, 2021
-
Differing Site Conditions and Dispute Avoidance Under the FIDIC Emerald Book for Underground Works
By Jürg Künzle
Underground construction is a matter of dealing with the inherent uncertainty of subsurface geology. If the encountered conditions are less favorable than the expected ones, the execution of excavatio
Jun 13, 2021
-
The Bypass Tunnel: Excavation, Interliner, and Lining - RETC2021
By George Schmitt, Ted Dowey, Grant Millener, Sean McAndrew, Eric Jordan
The Rondout-West Branch Bypass Tunnel is being built to bypass a substantial leak in New York City’s primary water supply tunnel. The 13,500 foot long tunnel travels 600 feet under the Hudson River th
Jun 13, 2021
-
Case Study of EPB-TBM Crossing through Boulder Cluster and Method Selected for Claim Resolution - RETC2021
By Ehsan Nasiri, Keivan Pak Iman
Historically, boulders are a frequent source of problem in soft ground tunneling. It is important to attempt to make an assessment of the nature and quantity of the boulders, although in many cases, i
Jun 13, 2021
-
Hybrid Metro Station for Mitigating Construction Disturbance - RETC2021
By Olivier Martin
In busy and historic cities, traditional open box metro stations are becoming outrageously difficult, unacceptable for the citizen and uneconomical. Hybrid stations provide an interesting alternative.
Jun 13, 2021
-
Tunnel Vision: Planning a Resilient 21st Century Wastewater System for Houston - RETC2021
By Brian Gettinger, Jared Barber, Richard Weatherly, Shannon Dunne, Jeff Masek, Chuck Wolf, Fazle Rabbi, Jack Canfield
During Hurricane Harvey over 60% of the 39 WWTPs, including the low-lying 25 MGD Sims North WWTP, and one third of the 382 lift stations owned and operated by the City of Houston were flooded resultin
Jun 13, 2021
-
Lesson Learned During the EPB TBM Launch Using Umbilical and Muck Pump - RETC2021
By D. Nebbia, R. Aliberti, F. Solesin
The launch of a Tunnel Boring Machine (TBM) is one of the most challenging activity parts of the construction of a tunnel. Challenges are coming from limited space available, learning curve, concurren
Jun 13, 2021
-
NEBT Project: The Application of Artificial Intelligence (AI) to Improve TBM Operations - RETC2021
By Rajat Gangrade, Haotian Zheng, Jarrett Smith, Daniele Nebbia, Mike Mooney
The application of artificial intelligence (AI) to improve tunnel boring machine (TBM) operations requires a significant amount of information to train robust performance prediction models, e.g., for
Jun 13, 2021