Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Use of Low-Density Cellular Concrete (LDCC) in Annular Fill Applications: Kaneohe-Kailua Sewer Tunnel Case Study - RETC2021
By Don Painter, Nico Sutmoller, Lori M. K. Kahikina, Brian Dorwart
This paper will address the feasibility of using low-density cellular concrete (LDCC) for an annular fill application where project conditions required pumping the LDCC material for distances of up to
Jun 13, 2021
-
Tunneling in Abrasive Alluvial Material Above the Water Table Using a MTBM and an EPBTBM - RETC2021
By D. Lynn, D. Arthur
Infrastructures continue to age and drinking water supplies are becoming scarce in the San Fernando Valley of Los Angeles, California. Frontier-Kemper Constructors, Inc. (FKCI) was engaged by the Los
Jun 13, 2021
-
Design of Large Underground Near Detector Cavern for Fermilab in Batavia, Illinois - RETC2021
By David Mast, Irwan Halim, Seung Han Kim
Fermilab is constructing a large underground cavern in Limestone to house scientific equipment. The cavern will have a complex L-shaped geometry and about 215-foot depth with relatively shallow rock c
Jun 13, 2021
-
CMAR Delivery Targets Effective Management of Risks in Achieving Water Supply Objectives - RETC2021
By Cary Hirner, Sarah Lothman, Chris Mueller, Savita Schlesinger, Mike Hanna, Ian Fitz-James
Loudoun Water is currently implementing a quarry to reservoir conversion that will improve water supply reliability in periods of drought and flexibility in water supply operations when turbidity in i
Jun 13, 2021
-
Toledo Waterways Initiative—Completion of an 18-Year LTCP Program - RETC2021
By Leo Gentile, David Selhorst
The $528 million Toledo Waterways Initiative (TWI) was implemented by the City of Toledo in 2002 and completed in August 2020. Toledo is one of many US cities required to implement a Long-Term Control
Jun 13, 2021
-
Upgrading Mount Royal Tunnel to Latest Standards - RETC2021
By Verya Nasri, Behrouz Esmaeilkhanian, Mohammad Motallebi
The Mount Royal Tunnel (MRT) is a 100-year-old railway tunnel located in Montreal, Canada. The tunnel is approximately 5 km long, 8.7 m wide and 5.5 m high, with a constant 0.6% grade. This existing t
Jun 13, 2021
-
Major Underground Station in Montreal - RETC2021
By Verya Nasri, Jaeseoung Lee, Ashish Bhargava, Shashank Gupta
This paper presents the unique design and construction challenges for the Technoparc Station, located in downtown Montreal as a part of Réseau Express Métropolitain (REM), a light rail rapid transit s
Jun 13, 2021
-
InSAR Monitoring of Tunneling Surface Displacement - RETC2021
By Brian Young, Ben Pantony
Interferometric Synthetic Aperture Radar (InSAR) has played an integral role in many large scale tunneling projects globally. Until recently, it has been regarded as a complementary monitoring tool. O
Jun 13, 2021
-
Tunnel Spitzenberg—Tunnel Drive Hits a Historic Quarry - RETC2021
By Pafos Busch, Martin Fischer, Johannes Jaeger
The Spitzenberg Tunnel is a 600 m (1,970 ft) long twin tube motorway tunnel on Germany’s Autobahn A44 between Kassel and Eisenach. Since flexibility was considered to be very important in the continuo
Jun 13, 2021
-
Under Pressure: Geotechnical Forces and Conditions at Work on the Ohio River Tunnel Project - RETC2021
By Ross Goodman, Jesse Salai
The Ohio River Tunnel Project encountered multiple unexpected geotechnical challenges such as crown and invert instability due to the overstress condition affecting the strata above, below, and in the
Jun 13, 2021
-
TBM Removal Within the Busiest Passenger Interlocking in the United States - RETC2021
By Devan Naik, Matthew Stokes, Andy Nigro
This paper describes the surgical removal of a 24 ft dia. Slurry Shield TBM entombed beneath one of the country’s busiest commuter rail interlockings, the Harold Interlocking in Queens, NY, and the co
Jun 13, 2021
-
Crossing an Environmentally Sensitive Shore Area— Micro-Tunneling in the Australian Outback - RETC2021
By Taner Aydogmus
The A$29 billion Chevron-operated Wheatstone Project is one of Australia’s largest resource projects. Located at Ashburton North, 12 kilometers west of Onslow in Western Australia, the project will co
Jun 13, 2021
-
Lessons Learned at the Trampas Dam Inlet/Outlet Tunnel - RETC2021
By Todd Kilduff, Paul Wilkinson
Microtunneling is rarely a straight forward “business as usual” endeavor. More often than not, these projects take twists and turns that require on the fly, out of the box solutions to get the project
Jun 13, 2021
-
Tunneling to Manage Construction Impacts for Albany’s Beaver Creek Clean River Project, Albany, New York - RETC 2021
By Greg Bold, Mahmood Khwaja, Yuannian (Jerry) Wan, Michael S. Schultz, William Simcoe
Beaver Creek Clean River Project will satisfy the consent decree requirements by capturing and treating combined sewage overflows. The project consists of, approximately, 2,700 feet of 30-inch trenchl
Jun 13, 2021
-
Lyon Metro Line B Extension: A Variable Density TBM for an Underground Mission in Remarkably Diverse Geology - RETC2021
By Karin Bäppler
Lyon with half a million inhabitants is the third largest city in France. Urban agglomerations such as Greater Lyon demand intelligent underground solutions for the freedom of mobility of its inhabita
Jun 13, 2021
-
The Role of Small Diameter Tunneling for Pipeline Installations - RETC2021
By P. Schmäh
Nowadays, small diameter tunnels are increasingly considered in pipeline projects as an alternative for sensitive crossings or when soil conditions limit the use of conventional pipeline installation
Jun 13, 2021
-
Influence of Large Deep Excavations on Closely Underlying Subway Tunnels and Design of Mitigation Measures - RETC 2021
By Giuseppe Gaspari, Xiangrong Wang
The pandemic emergency is forcing transit agencies to define strategies allowing social distancing, which are more challenging in underground interchange stations in crowded downtown cores. Toronto Tr
Jun 13, 2021
-
TBM and Logistics for Constructing Twin Tunnels Between Artificial Islands in Hampton Roads - RETC2021
By Sergio Estebanez, Martha Gross, Ruben Rubal, Yvonnick Rescamps, Alexandre Cochennec
The Hampton Roads Bridge-Tunnel (HRBT) Expansion project in coastal Virginia, USA will add two 1.5-mile (2.4 km) TBM bored tunnels alongside two existing immersed-tube tunnels between artificial islan
Jun 13, 2021
-
Deep Portal Shafts of the Annacis Island Outfall Tunnels— Building on Pacific Northwest Shaft Design Experience - RETC2021
By John Newby, Ulf Gwildis, Fred Marquis
From the Brightwater Conveyance System in Seattle to the Second Narrows Water Supply Tunnel in Vancouver, BC, the design and construction of deep-lying tunnels in the Pacific Northwest often require t
Jun 13, 2021
-
Use of a GBR to Deliver Risk Management and Value— City Rail Link, Auckland - RETC2021
By Tom Ireland, Sumi Eratne
The approach to Risk Management during the procurement of major projects often has a significant outcome on the ultimate successful delivery of a project. The $NZ4.4B Auckland City Rail Link project i
Jun 13, 2021