Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A methodology for assessing stope design modifying factors for the Olympic Dam Mine
By S Tierney, D Cumming-Potvin, I Thin, Y Potvin, D Grant
The preliminary modifying factors for future stope design in the Southern Mine Area of Olympic Dam consisted of only a single, arbitrary value of Equivalent Linear Overbreak/Sloughing (ELOS). In order
Mar 15, 2021
-
Increased productivity using theory of constraints at the Argyle Diamond Mine
By B Murphy, N Strong, J Albrecht
Rio Tinto’s Argyle Diamond Mine has a history of underperformance with delivery of ore from the underground operation to the surface for processing with no real clarity in sources of loss and value. I
Mar 15, 2021
-
Increased drilling accuracy leads to significant improvement in ore recovery and dilution
By R Stimpson, B Johnson, B Hesse
During a period of twelve months between FY18-19, a series of trials were conducted to compare production drilling accuracy using two different methodologies, and the subsequent impact this had on sto
Mar 15, 2021
-
Sublevel caving a narrow vein mine – Pajingo’s case study
By J F. Carswell, G Cheshire
The Pajingo gold operation in Queensland is approximately 55 km south of Charters Towers and 134 km south-west of Townsville. The gold deposit was discovered on the northern end of the Drummond Basin
Mar 15, 2021
-
Use of drone and LiDAR technology for mapping underground voids
By D Woolmer
Since January 2019, BHP Olympic Dam have been trialling the use of a drone based LiDAR mapping system for the purpose for surveying stope voids. This new technology utilises Simultaneous Location and
Mar 15, 2021
-
A Paradigm Shift in Underground Raisebore Reamer Removal
By P Viljoen, A Holland, C Parken
In the raisebore industry, there are two known methods of removing large diameter reamer heads once the reaming of an underground shaft is complete: 1. Lower the reamer head to the base of the shaft a
Mar 15, 2021
-
Carrapateena project to date – Geotechnical risks and management
By G Balog, T Ormerod, D Cox
This paper discusses the methods utilised by the technical team to identify and quantify the SLC risk factors, the modifications to mine design and scheduling, and the changes to the planned risk mana
Mar 15, 2021
-
Carrapateena Crusher Station One – Optimisation and excavation
By A Mooney, G Balog, P Burns, R Brooks
This paper outlines the rationale for the location of the crusher, geotechnical analysis and basis of ground support design, design and scheduling of the chamber and supporting excavations as well as
Mar 15, 2021
-
Problem roadways in an underground decline solved through the application of Roller Compacted Concrete (RCC)
By D Bruce, D Cox
The main access decline at Carrapateena mine was excavated through two different underground aquifers. In these areas of decline, pressurised water finds the path of least resistance through the rock
Mar 15, 2021
-
Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fill
By D Pateman, F de Fredrick
The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)
Mar 15, 2021
-
Secondary means of egress via emergency gig
By R Austerberry, S Green
The discovery of the Cuffley Lode at Mandalay Resources Costerfield Operations provided an opportunity to extend mine life via mining the offset depth extension of the previously worked Alison Mine. A
Mar 15, 2021
-
The Application of a Bespoke Ventilation on Demand (VoD) System at Carrapateena Sublevel Cave
By A Coelho, D Bruce, H Grosser, C Parken, M Xia
Carrapateena is a new underground sublevel cave mine and was officially opened in 2020. It has a mine life of 20 years. Development began in 2016, and with the rare opportunity to start a with a blank
Mar 15, 2021
-
Developing a best practice framework for inrush risk management
By L Manca, P B. Hills, D Tyler, N Pollington
This paper describes a collaborative project undertaken by Newcrest Mining Limited (Newcrest) and pitt&sherry to identify, develop and then implement global best practices to manage the exposure to in
Mar 15, 2021
-
Implementation of a High Energy Dissipation Ground Support Scheme
By E Villaescusa, A Kusui, R Talebi, R Hassell, C Arcaro
Northern Star Resources (NSR) operates several seismically active mines as part of its Kalgoorlie Operations. In order to successfully continue mining at depth in increasing stress conditions, strateg
Mar 15, 2021
-
Raisebore drill string recovery case study
By M Andrew, D McTiffen, M Adams
A major Ventilation Upgrade Project commenced at the Fosterville Gold Mine (FGM) in 2017 to service the ongoing ventilation requirements of the underground mining operation. The project consists of th
Mar 15, 2021
-
Getting underground: design and construction of a portal in a pit with moving walls
By J Player, P Evans, G Sweby
Achieving quick underground access after the completion of an open pit mine can be critical to maintaining project value and ensuring regular ore feed to the mill. This paper outlines the design and c
Mar 15, 2021
-
Unlocking value in drill and blast at Olympic Dam – Lime 390 case study
By P Vaikkattil, K Li, J Bullock
Unlocking maximum value is essential when designing a stope and the associated drill and blast packets. This is becoming increasingly important at Olympic Dam as the operation continues to expand sout
Mar 15, 2021
-
On the flipside: why cost cutting is out; revenue maximization is in and value is always king
By H Allday
The mining industry’s attention has shifted over the last decade with the recovery from the downturn resulting in greater development of innovation and new work methods in a bid to remain competitive
Mar 15, 2021
-
A case study: how being ‘aware of now’ is making work safer at Telfer underground
By S B. Fitch, S A. Wilson, A J. R Barr, P R. Searle
Improving the safety culture and performance of any operation is a fundamental goal of every mine operator. Methods of implementing, or changing a culture have developed from the early methods of oper
Mar 15, 2021
-
Reduced Development through improved Rise and Widening Firings using Orica WebGen™ at Ernest Henry Mine
By J Say, M Hawtin, L Carlon, P Cann
Historically, production from sublevels of the Ernest Henry Mine (EHM) started from blind uphole rises at the end of slot drives. Where previous investigations considered removing these slot drives an
Mar 15, 2021