Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Evaluation of Multiple-Seam Scenarios by Non-Traditional Methods
By S. E. Phillipson
The MSHA Technical Support, Roof Control Division's primary evaluation tool for coal pillar designs is the Analysis of Coal Pillar Stability (ACPS) program. However, ACPS is limited to evaluating inte
Jun 25, 2024
-
ICGCM China—History, Networking, and Education
By Syd Peng, W. B. Guo, F. Du, L. Yang, J. Yw. Cheng
The annual ICGCM China was initiated in 2014. Up to 2023, ICGCM China has been held 9 times. In the 9 conferences during the past 10 years, about 559 papers in 17 topical areas were presented and atte
Jun 25, 2024
-
Polyurethane Foam and Alternatives for Void Filling Applications
By Delbert Hamilton, Christopher Snyder
In the last three years there have been four uncontrolled heating events in mines that have been attributed to the use of polyurethane foam as a void fill product. These heating events are due to the
Jun 25, 2024
-
Numerical Study on Mining-Retention Ratio Optimization in Underground Solid Potassium Salt Mine
By Jin Zhao, Weijie Wei, Jinwang Zhang, Xiaohang Wan, Shengli Yang
Reasonable mining-retention ratio (ratio of room width to pillar width) is vital to recovery rate and stope stability in underground mining of solid potassium salt deposits. Based on the engineering b
Jun 25, 2024
-
Valley Bottom Upsidence above a Longwall Operation with Strong Overburden Strata
By Steve Hicks, Zach Agioutantis, Greg Hasenfus, Zach Wedding
Most prediction methods used to calculate mining-induced subsidence rely on empirical formulations, which typically assume flat topography and uniform properties in the overburden. It is also well kn
Jun 25, 2024
-
NIOSH Gas Well Stability Research: A Summary of Ground Control Engineering Considerations
By Peter Zhang, Daniel Su, Bo Kim, Berk Tulu
This paper summarizes significant findings from the ongoing NIOSH Gas Well Stability research over the past decade; in particular, the important ground control engineering considerations. Longwall-ind
Jun 25, 2024
-
Research on Microseismic Passive Velocity Tomography Based on Template Matching Technology
By Shawn Boltz, Erik Westman, Derrick Chambers, Xingdong Zhaoa, Qiankun Zhua
Microseismic passive velocity tomography is becoming an effective technology for large-scale mining-induced stress monitoring in underground mines, especially in the field of early warning of mining-
Jun 25, 2024
-
Application of Post-Tensioning in TBM Tunneling: Case Study of JWPCP Effluent Outfall Tunnel Project in Los Angeles, USA - NAT2024
By I. Abdullayev, M. Soberano Capistran, J. Garcia
The application of post-tensioning in segmental structures was introduced in the early 1900s and has been successfully applied in different types of structures including immersed tunnels, bridges, bui
Jun 23, 2024
-
Automation in Segmental Tunnel Lining Design: Case Study of the Northside Interceptor Tunnel Project (NSIT) - NAT2024
By Irwan Halim, Bhoshaga Mitrran Ravi Chandran, Kevin Huynh
Tunnel segmental lining design constitutes a significant iterative process where modeling and numerical analysis are factors in deciding the number of segments, their dimensions, gasket placements, as
Jun 23, 2024
-
Risk Mitigation for the Big Walnut Sewer Tunnel Construction in Columbus, Ohio - NAT2024
By Rob Herr, Irwan Halim, Heather Marsh
This project will expand sanitary sewer within the City of Columbus. It consists of 2.5 mile long, 72-inch finished diameter pipe grouted inside 10.8-foot diameter tunnel excavation in shale. This pap
Jun 23, 2024
-
Value Engineering for the Shoreline Consolidation Sewer: An Example of Collaboration Between Owner, Engineer, and Contractor - NAT2024
By Colin Irwin, Adrian Naranjo-Castillo, Christopher Petta, Eric Zarobila
The Shoreline Consolidation Sewer is a CSO control project in Cleveland, Ohio that requires the installation of 5,000 feet of 72-inch inside diameter pipe using microtunneling methods. After award, th
Jun 23, 2024
-
Influence of Early Ring Closure of Center Drift on Main Tunnel Excavation Under High Overburden Conditions - NAT2024
By Sadatoshi Ohmori, Simin Zhai, Devini Abeyawardena
A road tunnel is planned to be constructed in soft, high overburden ground of around 600 m in Japan by using the center drift advancing method. The dodging effect and early ring closure of the center
Jun 23, 2024
-
XXL Pipe Jacking: Technological Aspects of Large-Diameter and Long-Distance Drives - NAT2024
By Peter Schmäh
Pipe-jacked tunnels are considered for a large variety of applications from water and sewage, cable ducts to challenging pipeline crossings or landfall construction. In most cases, Slurry MTBMs are us
Jun 23, 2024
-
Determining Tunnel Clearance by Automating 3D Mobile Laser Profile Data - NAT2024
By Ali Hafiz, Rich McCafferty, Chris Blanchard, Kaz Tabrizi, Kevin Ruston, Joseph Rigney, Mike Keville, James Dorta
Many existing tunnels have deteriorated as they age, requiring a massive amount of investment for their rehabilitation. The tunnel of interest in this paper is being rehabilitated by adding precast co
Jun 23, 2024
-
Lessons Learned from Larger Diameter Waterview Road Tunnel to Smaller Diameter CRL Rail Tunnel in Auckland, New Zealand - NAT2024
By Matt Bilson, Ritesh Mahajan, Antoni Kuras, Wataru Okada
The Waterview Tunnel comprises twin 2.4 km long 13.1 m internal diameter three lane road tunnels in Auckland, New Zealand. The City Rail Link (CRL) is a 3.45 km long, 6.24 m internal diameter twin rai
Jun 23, 2024
-
TBM Tunneling Between the Westridge Marine Terminal and the Burnaby Terminal in British Columbia - NAT2024
By Jeff Reid, Mohamed Maghari, Nicholas Joens
The Burnaby Mountain Tunnel was an integral part of the Trans Mountain Expansion Project. General Contractor, Kiewit Ledcor TMEP Partnership (KLTP), contracted with McNally Construction to build an un
Jun 23, 2024
-
Quality Control of Deep Bedrock Tunneling in Urban Areas: A Case Study of Louisville MSD’s Ohio River Tunnel - NAT2024
By Jacob Mathis, Mark Bradford, Alston Noronha, R. M. True
In June 2022, Louisville MSD completed a 6.5-km (4.0-mi), 6.1-m (20-ft.) diameter CSO conveyance and storage tunnel system located along the Ohio River in downtown Louisville, Kentucky. For large diam
Jun 23, 2024
-
Extended Application Ranges for EPB-Shields in Coarse-Grained Soils, the Lower Olentangy Tunnel Project Case History - NAT2024
By Elisa Comis, David Chastka, Miriam Piemontese, Maria Chastka
The Lower Olentangy Tunnel (LOT) Project involves the construction of a 17,000 ft (5,200 m) long, 12 ft (3.65 m) internal diameter Combined Sewer Overflow (CSO) tunnel. The tunnel is excavated by usin
Jun 23, 2024
-
Sumner Tunnel Rehabilitation - NAT2024
By Joe Rigney, Conrad Stacey, David Nowak, Chris Blanchard, Michael Beyer, John Czach
Originally constructed in the 1930s, the 1-mile-long Sumner Tunnel is 31 feet in diameter and carries traffic deep below Boston Harbor, connecting Boston and East Boston. This project includes both de
Jun 23, 2024
-
Big Data in Design-Build: Hampton Roads Bridge-Tunnel Expansion Supplemental Site Investigation - NAT2024
By Martha Gross, Amanda Wachenfeld, Brian Keaney, Jean-Michel Charpentier, Frank Perrone
The Hampton Roads Bridge-Tunnel (HRBT) Expansion widens the existing four-lane bridgetunnel corridor to eight lanes through construction of two parallel tunnels, interstate widening, and bridge expans
Jun 23, 2024