    Evaluating Options in Design of the Akron Northside Interceptor Tunnel (NSIT) Tunnel Diversion and Flow Control Structure - NAT2024

    By Dominick Mandalari, David Mast, Heather Ullinger, Juan Granja, Amanda Foote

    The City of Akron will construct the Northside Interceptor Tunnel (NSIT) project to control and reduce combined sewer overflows. One component of the project a large diameter tunnel diversion / flow c

    Jun 23, 2024

  • SME
    Mitchell Point Tunnel, Oregon—Design and Construction - NAT2024

    By Taeyong Lee, Cole Bales, Matt Fowler, John Horne

    Mitchell Point Tunnel near Hood River, Oregon is one of the more unique segments of the Historic Columbia River Highway and State Trail being constructed through the Columbia River Gorge. This 650-foo

    Jun 23, 2024

  • SME
    Overcoming Sustainability Challenges for Design and Construction of Urban and Long-Distance Tunnels - NAT2024

    By Bernd Hagenah, Eric C. Wang

    New tunnels of significant alignment lengths such as mountain tunnels, base tunnels, as well as beneath urban centers pose unique environmental challenges. This paper highlights key environmental cons

    Jun 23, 2024

  • SME
    From Planning to Commissioning: A Complete Overview of the Northeast Boundary Tunnel Project - NAT2024

    By Moussa Wone, Jeff Peterson, Filippo Azzarà, Daniele Nebbia

    The DC Water and Sewer Authority's Long Term Control Plan includes tunnels, sewer separation, pumping station rehabilitation and green infrastructure to reduce combined sewer overflow (CSO) discharges

    Jun 23, 2024

  • SME
    West Gates Deicing Industrial Waste Pond Expansion Project: Tunnel Design Challenges at Denver International Airport - NAT2024

    By Nick Tessitore, Ryan Marsters, Alex Warren, Dylan Fawaz

    The West Gates Deicing Industrial Waste Pond Expansion project at Denver International Airport seeks to expand utilities to accommodate additional terminal gates. The project includes six tunnel cross

    Jun 23, 2024

  • SME
    Numerical Impact Assessment of Axially Loaded Piles and Their Seismic Effects on an Existing Bored Subway Tunnel - NAT2024

    By Keivan PakIman, Maziar Pasdarpour

    Transportation tunnels are highly sensitive to ground movements and are required to be stable and secure for safe operation. In urban areas, the interaction between tunnels and adjacent piles, which a

    Jun 23, 2024

  • SME
    SAWS W-6 Upper Segment: Construction for Future Generations - NAT2024

    By Jason Swartz, Gerardo Gomez, Henry Leighton

    San Antonio has experienced sustained growth for decades, putting increased pressure on existing wastewater infrastructure. In June 2013, San Antonio Water System (SAWS) reached a Consent Decree agree

    Jun 23, 2024

  • SME
    NAT 2024 Conference Committee - NAT2024

    By SME SME

    List of Conference Committee

    Jun 23, 2024

  • SME
    Evolving Underground Communication and Connectivity - NAT2024

    By Tom Michaud, Rob Albinger, Ian Turner, Michael Rispin

    Data transmission, communication, tracking, and the connection of equipment such as gas detectors, cameras, and collision avoidance systems in today's tunnel industry are critical pieces of the constr

    Jun 23, 2024

  • SME
    Construction of an Underground Niche for TBM Repair and Permeation Grouting in Flooded Shaft—Ship Canal Water Quality Project (SCWQP) - NAT2024

    By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Brad Yoder, Fabrizio Fara

    The Ship Canal Water Quality Project includes a 2.7-mile, 18-ft and 10-in internal-diameter tunnel that extends from Ballard to Wallingford, two popular neighborhoods in the West of Seattle. During th

    Jun 23, 2024

  • SME
    Segmental Lining Design for the Hampton Roads Bridge-Tunnel - NAT2024

    By Botond Beno, Dave Watson, Danny Read

    The Hampton Roads Bridge-Tunnel (HRBT) Expansion widens the existing I-64 four-lane bridge-tunnel corridor to eight lanes through construction of two parallel tunnels, interstate widening, and bridge

    Jun 23, 2024

  • SME
    Holding Back the Bay: Performance of Jet Grout in Hydraulically Placed Fills - NAT2024

    By Roger Escoda Estelrich, Joan Carles Casado Ortega, Mitchell Gerdau, Jose Raul Martinez, Jeb Pittsinger, Frank Perrone

    The existing Chesapeake Bay Bridge-Tunnel complex is being expanded to include the Parallel Thimble Shoal Tunnel. This will be a subaqueous bored crossing between two islands constructed for the origi

    Jun 23, 2024

  • SME
    Subsea Tunnel Geotechnical Investigations Pre and Post Contract Award-A Plan for Success - NAT2024

    By Gary Peach, Khalid Saif Al-Khayareen, Vigil Fernandez, Furqan Hameed

    The Musaimeer pump station and outfall project (MPSO) is in Doha Qatar. This technical paper will discuss and explain the three major stages of geotechnical investigation employed. Stage one the tende

    Jun 23, 2024

  • SME
    Innovative Approach to Install Precast Segmental Lining in Lieu of Cast-In-Place in Starter Tunnels - NAT2024

    By Georges Cote, Ehsan Alavi, Eren Kusdogan

    The City of Toronto's Coxwell Bypass Tunnel is currently being constructed by North Tunnel Constructors (NTC) ULC, a joint venture of Jay Dee Canada, C&M McNally Tunnel Constructors and Michels Canada

    Jun 23, 2024

  • SME
    Microtunneling to the Rescue: Increasing Capacity and Replacing Aging Interceptor Sewers Due to Rapid Growth in Irving, Texas - NAT2024

    By Amanda Powers, Brian Glynn, Robert Sauceda, Daniel Huffines, Mike Garbeth

    This paper will review the evaluation performed for the Cottonwood & Hackberry Creek Wastewater Interceptor Improvements Project to replace two separate aging and undersized interceptor sewers by eith

    Jun 23, 2024

  • SME
    Preliminary Ground Characterization for the Mokelumne Aqueducts Resiliency Project (MARP) Tunnel - NAT2024

    By S. Klein, M. McLeod, S. Gambino, K. Johnson, E. O’Hara

    The Mokelumne Aqueducts Resiliency Project (MARP) involves construction of a 16.5-mile tunnel across the Sacramento-San Joaquin Delta (Delta) to replace the existing surface aqueduct pipelines with mo

    Jun 23, 2024

  • SME
    Tunnel Euralpin Lyon Turin CO8-Design of Temporary Support Profile of Base Tunnels and Cross-Passages - NAT2024

    By Elisa Comis, Barbara Bitetti, Julien Pepiot, Stefano Lione, Francesc Rich

    The new Lyon-Turin railway project involves the construction of a 57 km twin-tube tunnel between France and Italy. Pini France (project leader) and Systra-SWS are the designers of Construction Site 8

    Jun 23, 2024

  • SME
    Is International Experience of Risk-Based Decision Making for Road Tunnel Safety Applicable in the Unique US-American Regulatory Environment? - NAT2024

    By Arnold Dix, Oliver Heger, Bernhard Kohl

    In the USA, risk-based decision making has not been a common approach to tunnel safety in the past, but this is changing, as concepts such as “equivalency” in the NFPA 502 framework gain acceptance in

    Jun 23, 2024

  • SME
    Integration of Century Old Mont Royal Tunnel into Montreal New Light Rail Transit Network - NAT2024

    By Verya Nasri, Behrouz Esmaeilkhanian, Mohammad Motallebi

    Réseau Express Métropolitain (REM) is the new Light Rail Transit (LRT) network of Montreal, Canada. This new LRT network uses a century-old Mont Royal Tunnel (MRT) to connect Downtown Montreal to the

    Jun 23, 2024

  • SME
    Microtunnel Shaft Construction in Louisiana - NAT2024

    By James Carroll, Lance Heyer

    This paper describes the shaft design and construction for a 72-inch microtunnel under 14 active railroad tracks in Avondale, Louisiana. Initial shaft design for a deeper tunnel alignment considered s