Search Documents

Sort by

  • AUSIMM
    The critical pool levels for the Yallourn Mine determined using the MGRI approach

    By N Patel, S Narendranathan, T Mok, J Lowe

    The Hazelwood Mine (HM) commenced operations in the 1950s and was originally operated by the State Electricity Commission of Victoria (SECV) prior to it becoming privatised. ENGIE, the current owners

    Aug 2, 2023

  • AUSIMM
    Exploring the applicability of responsible research and innovation for mine transitions

    By S Worden, A Lee Zhi Yi, E Sellers, G Corder, A Littleboy

    The global shift towards decarbonisation is driving competition for the extraction of critical minerals such as nickel, lithium, and copper. To meet this demand, new mines are being developed while mi

    Aug 2, 2023

  • AUSIMM
    The role of scale in prediction of mine drainage chemistry

    By N McIntyre, M Edraki, K R. Jain

    From the very early stages of a mining project, there is a requirement to predict the chemistry of potential drainages from various waste storage facilities. However, using relative masses to scale ch

    Aug 2, 2023

  • AUSIMM
    Getting your cut-off grade policy right for better ESG outcomes

    By J D. Tolley

    The shift towards clean energy technologies is having a significant impact on the mining industry, with the demand for minerals such as copper, nickel, cobalt, lithium, manganese, and graphite increas

    Aug 2, 2023

  • AUSIMM
    The perfect storm – mine closure in the Latrobe Valley Victoria

    By A Scrase, J Brereton

    The Latrobe Valley is located approximately 150 kms east of Melbourne. Within a very small area there are 3 large brown coalmines and associated power stations, 3 large towns, and numerous smaller tow

    Aug 2, 2023

  • AUSIMM
    Moving beyond Net Present Value project evaluation to achieve Environmental, Social and Governance goals for mine operations and closure

    By H Simpson, C Gimber

    The financial evaluation of mining projects drives a whole range of decision-making regarding project viability, project design, operating models and closure philosophy. Net Present Value is a financi

    Aug 2, 2023

  • AUSIMM
    Microalgae in mining – environmental and social opportunities

    By A E. Levett, J Durbin

    The environmental, social and governance (ESG) obligations of mining companies promote the consideration of water and land resources as well as the post-mining employment opportunities following the c

    Aug 2, 2023

  • AUSIMM
    Queensland’s open cut coalmine void rehabilitation planning practices – challenges and opportunities

    By M Clay, J Dunlop

    Thermal and metallurgical coal mining in Queensland has resulted in mines which contain voids due to open cut mining. While there are several proposals for greenfield coalmines or expansions to existi

    Aug 2, 2023

  • AUSIMM
    Whole of mine planning – Evolution Mount Rawdon case study

    By M L, G Maddocks, A Ferrier, ers, A Forbes

    Evolution’s Mount Rawdon Operation (MRO) produces gold and silver through open pit mining methods. The mining operations are scheduled to be completed in FY24 (Financial Year 2024), after which low-gr

    Aug 2, 2023

  • AUSIMM
    Quantifying the influence of weathering on erosion and degradation of post mining landforms

    By G R. Hancock, W D. D P Welivitiya

    is placed in a waste rock dump, which is usually later reshaped to be erosionally stable, initiate and sustain vegetation and ultimately integrate with the surrounding undisturbed landscape. However,

    Aug 2, 2023

  • AUSIMM
    Developing a regional data catalogue to support the technical assessment of post-mining land use

    By C M. Côte, P Bolz, L Pagliero, M Edraki, M Shaygan, P Erskine

    Mines in Queensland must now prepare a Progressive Rehabilitation and Closure (PRC) plan, with the requirement to justify the selection of the post-mining land use (PMLU) for each rehabilitation domai

    Aug 2, 2023

  • AUSIMM
    Polymer-amended tailings dewatering technology for desired closure outcomes

    By T Baumgartl, A Costine, B Boshrouyeh, M Edraki

    In mineral processing, the management of tailings may become increasingly more challenging with a change of ore type and the quality of water used in the plant. This, in turn, may affect the overall c

    Aug 2, 2023

  • AUSIMM
    Synergies between renewable-powered mines and community development programs throughout mine life cycle and post-closure

    By J Joughin, D Kyan, L Rollin

    In line with the 2015 Paris Agreement and corresponding climate disclosure requirements, many mining companies have publicly disclosed that they are developing and/or implementing ambitious decarbonis

    Aug 2, 2023

  • AUSIMM
    Viable and feasible decarbonisation – Tent Mountain coalmine repurposing for the clean energy economy

    By B D. Saffron

    In 1983, open cut coal mining operations were suspended at the Tent Mountain coalmine, located in Alberta, Canada in an area called Crowsnest Pass. Montem Resources (‘Montem’), an Australian mining co

    Aug 2, 2023

  • AUSIMM
    Shifting post-mining land use planning from mine site to regional scale

    By C M. Côte, S Worden, K Svobodova

    Mines in Queensland are transitioning to the progressive rehabilitation and closure plan (PRCP) framework. Mine operators are required to select and justify appropriate and viable post-mining land use

    Aug 2, 2023

  • AUSIMM
    Economic analyses (EA) and life cycle assessment (LCA) on repurposing of mine waste via geopolymerisation technology

    By H M. A Ilyas, M Yahyaei, S Amari, M Darestani

    Tailings are generally deposited on or near to the mine sites, occupying the site area, and being an economic burden for mining companies. Tailings can cause several environmental impacts, such as lea

    Aug 2, 2023

  • AUSIMM
    Contour drains and benches – are they an effective long-term run-offand sediment control method?

    By G R. Hancock

    A common and cost-effective method for post-mining landscapes is to construct linear hillslopes with a break in the hillslope at appropriate distances to reduce hillslope length and resultant erosion

    Aug 2, 2023

  • AUSIMM
    Assessing the effectiveness of erosion predictions from a landform evolution model with field observations from a rehabilitated landform

    By G R. Hancock, M J. Saynor, J B. C Lowry, T J. Coulthard

    Landform evolution models (LEMs) can assess the effectiveness of landform designs applied to a rehabilitated landform by predicting where erosion may occur. Here, we compare erosion predictions produc

    Aug 2, 2023

  • AUSIMM
    Management of riverine disposal of tailings and waste rock for AMD control at the Ok Tedi copper-gold mine

    By S Davidge, J Pile, R Schumann, E Kepe, W Stewart, M Ridd, B Rathi

    Geographical constraints, including steep terrain and high rainfall, at the Ok Tedi copper-gold mine in PNG’s Western Province present Ok Tedi Mining Limited (OTML) with significant challenges in mine

    Aug 2, 2023

  • AUSIMM
    Cobalt, copper tailings and the circular economy – a case study from the Capricorn Copper Mine, north-west Queensland minerals province

    By L Nicholls, A Parbhakar-Fox

    Reprocessing Queensland’s historical copper tailings for critical minerals is an opportunity to circularise the state’s mining industry by converting waste liabilities into assets. Mine waste valorisa

    Aug 2, 2023