Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The critical pool levels for the Yallourn Mine determined using the MGRI approach
By N Patel, S Narendranathan, T Mok, J Lowe
The Hazelwood Mine (HM) commenced operations in the 1950s and was originally operated by the State Electricity Commission of Victoria (SECV) prior to it becoming privatised. ENGIE, the current owners
Aug 2, 2023
-
Exploring the applicability of responsible research and innovation for mine transitions
By S Worden, A Lee Zhi Yi, E Sellers, G Corder, A Littleboy
The global shift towards decarbonisation is driving competition for the extraction of critical minerals such as nickel, lithium, and copper. To meet this demand, new mines are being developed while mi
Aug 2, 2023
-
The role of scale in prediction of mine drainage chemistry
By N McIntyre, M Edraki, K R. Jain
From the very early stages of a mining project, there is a requirement to predict the chemistry of potential drainages from various waste storage facilities. However, using relative masses to scale ch
Aug 2, 2023
-
Getting your cut-off grade policy right for better ESG outcomes
By J D. Tolley
The shift towards clean energy technologies is having a significant impact on the mining industry, with the demand for minerals such as copper, nickel, cobalt, lithium, manganese, and graphite increas
Aug 2, 2023
-
The perfect storm – mine closure in the Latrobe Valley Victoria
By A Scrase, J Brereton
The Latrobe Valley is located approximately 150 kms east of Melbourne. Within a very small area there are 3 large brown coalmines and associated power stations, 3 large towns, and numerous smaller tow
Aug 2, 2023
-
Moving beyond Net Present Value project evaluation to achieve Environmental, Social and Governance goals for mine operations and closure
By H Simpson, C Gimber
The financial evaluation of mining projects drives a whole range of decision-making regarding project viability, project design, operating models and closure philosophy. Net Present Value is a financi
Aug 2, 2023
-
Microalgae in mining – environmental and social opportunities
By A E. Levett, J Durbin
The environmental, social and governance (ESG) obligations of mining companies promote the consideration of water and land resources as well as the post-mining employment opportunities following the c
Aug 2, 2023
-
Queensland’s open cut coalmine void rehabilitation planning practices – challenges and opportunities
By M Clay, J Dunlop
Thermal and metallurgical coal mining in Queensland has resulted in mines which contain voids due to open cut mining. While there are several proposals for greenfield coalmines or expansions to existi
Aug 2, 2023
-
Whole of mine planning – Evolution Mount Rawdon case study
By M L, G Maddocks, A Ferrier, ers, A Forbes
Evolution’s Mount Rawdon Operation (MRO) produces gold and silver through open pit mining methods. The mining operations are scheduled to be completed in FY24 (Financial Year 2024), after which low-gr
Aug 2, 2023
-
Quantifying the influence of weathering on erosion and degradation of post mining landforms
By G R. Hancock, W D. D P Welivitiya
is placed in a waste rock dump, which is usually later reshaped to be erosionally stable, initiate and sustain vegetation and ultimately integrate with the surrounding undisturbed landscape. However,
Aug 2, 2023
-
Developing a regional data catalogue to support the technical assessment of post-mining land use
By C M. Côte, P Bolz, L Pagliero, M Edraki, M Shaygan, P Erskine
Mines in Queensland must now prepare a Progressive Rehabilitation and Closure (PRC) plan, with the requirement to justify the selection of the post-mining land use (PMLU) for each rehabilitation domai
Aug 2, 2023
-
Polymer-amended tailings dewatering technology for desired closure outcomes
By T Baumgartl, A Costine, B Boshrouyeh, M Edraki
In mineral processing, the management of tailings may become increasingly more challenging with a change of ore type and the quality of water used in the plant. This, in turn, may affect the overall c
Aug 2, 2023
-
Synergies between renewable-powered mines and community development programs throughout mine life cycle and post-closure
By J Joughin, D Kyan, L Rollin
In line with the 2015 Paris Agreement and corresponding climate disclosure requirements, many mining companies have publicly disclosed that they are developing and/or implementing ambitious decarbonis
Aug 2, 2023
-
Viable and feasible decarbonisation – Tent Mountain coalmine repurposing for the clean energy economy
By B D. Saffron
In 1983, open cut coal mining operations were suspended at the Tent Mountain coalmine, located in Alberta, Canada in an area called Crowsnest Pass. Montem Resources (‘Montem’), an Australian mining co
Aug 2, 2023
-
Shifting post-mining land use planning from mine site to regional scale
By C M. Côte, S Worden, K Svobodova
Mines in Queensland are transitioning to the progressive rehabilitation and closure plan (PRCP) framework. Mine operators are required to select and justify appropriate and viable post-mining land use
Aug 2, 2023
-
Economic analyses (EA) and life cycle assessment (LCA) on repurposing of mine waste via geopolymerisation technology
By H M. A Ilyas, M Yahyaei, S Amari, M Darestani
Tailings are generally deposited on or near to the mine sites, occupying the site area, and being an economic burden for mining companies. Tailings can cause several environmental impacts, such as lea
Aug 2, 2023
-
Contour drains and benches – are they an effective long-term run-offand sediment control method?
By G R. Hancock
A common and cost-effective method for post-mining landscapes is to construct linear hillslopes with a break in the hillslope at appropriate distances to reduce hillslope length and resultant erosion
Aug 2, 2023
-
Assessing the effectiveness of erosion predictions from a landform evolution model with field observations from a rehabilitated landform
By G R. Hancock, M J. Saynor, J B. C Lowry, T J. Coulthard
Landform evolution models (LEMs) can assess the effectiveness of landform designs applied to a rehabilitated landform by predicting where erosion may occur. Here, we compare erosion predictions produc
Aug 2, 2023
-
Management of riverine disposal of tailings and waste rock for AMD control at the Ok Tedi copper-gold mine
By S Davidge, J Pile, R Schumann, E Kepe, W Stewart, M Ridd, B Rathi
Geographical constraints, including steep terrain and high rainfall, at the Ok Tedi copper-gold mine in PNG’s Western Province present Ok Tedi Mining Limited (OTML) with significant challenges in mine
Aug 2, 2023
-
Cobalt, copper tailings and the circular economy – a case study from the Capricorn Copper Mine, north-west Queensland minerals province
By L Nicholls, A Parbhakar-Fox
Reprocessing Queensland’s historical copper tailings for critical minerals is an opportunity to circularise the state’s mining industry by converting waste liabilities into assets. Mine waste valorisa
Aug 2, 2023