    Can biocements stabilise tailings storage facilities?

    By G Simpson, S Dressler, A E. Levett

    Tailings storage facilities often represent a mining operation’s most significant liability, posing serious environmental, social and safety risks. Almost all mining operations dispose of wet tailings

    Aug 2, 2023

  • AUSIMM
    The Mine Land Rehabilitation Authority – reducing risk for Victoria

    By R Mackay, J Brereton

    On 30 June 2020, the Mine Land Rehabilitation Authority (the Authority) superseded the Latrobe Valley Mine Rehabilitation Commissioner as the independent overseer of Victoria’s declared mine rehabilit

    Aug 2, 2023

  • AUSIMM
    Traceability of native seed for mine rehabilitation

    By A Grant, H Thomas, C Clarke, B Fuller

    Native seed and plants are often a core input into the rehabilitation process of mine closure. Native plant establishment rate and performance is a function of many input elements including seed quali

    Aug 2, 2023

  • AUSIMM
    The critical pool levels for the Yallourn Mine determined using the MGRI

    By J Butler, N Patel, S Narendranathan, S Rastogi

    The Yallourn Mine (YM) commenced mining of brown coal in the 1920s under operation by the State Electricity Commission of Victoria (SECV), prior to it becoming privatised in 1996. The present owners o

    Aug 2, 2023

  • AUSIMM
    The role of the regulator in promoting a highly reliable mining industry

    By S Johnston, L Howe, S Stevens

    Regulators have an important role to play in fostering and enabling reliable, effective, environmental management. Given this, it is perhaps surprising that there has been relatively little debate on

    Aug 2, 2023

  • AUSIMM
    Above and beyond NPV – determining the life-of-mine from an economic perspective

    By C Tapia, B Hay

    There is a close relationship between the mining industry, economic growth, and technological and social development. Mining activities benefit all economic agents, but only during a timespan determin

    Aug 2, 2023

  • AUSIMM
    Alternative mineral processing strategies for copper-gold tailings management

    By C Antonio, R Narayan, A Scheuermann, S Quintero, M Edraki, M Ziemski

    Tailings are mostly loose material and can be classed as non-plastic sandy silts. They also tend to have low permeability, resulting in slow consolidation (settling) rates and low shear strength, even

    Aug 2, 2023

  • AUSIMM
    In-pit backfilling as part of integrated life-of-mine waste scheduling, closure planning and AMD risk management – Martabe Mine as a case study

    By K Grohs, A Satriawan, S R. Pearce

    Martabe gold and silver mine is operated by PT Agincourt Resources (PTAR) and is situated in northern Sumatra and comprises several deposits in steep terrain, and in a tropical climate, that are requi

    Aug 2, 2023

  • AUSIMM
    Incorporating the true costs and opportunities of rehabilitation and closure in project selection, design and approvals

    By C Tomlin, C Gimber

    Historically, key closure risks have been studied during operations and then further assessed as cessation of mining approaches. Only in the past couple of decades or so has progressive rehabilitation

    Aug 2, 2023

  • AUSIMM
    Eight years of ACARP research on rehabilitation of challenging mine sites – practical application in the era PCRPs

    By L McCallum, G Dale, B Silverwood, T Roscoe, A Costin

    The introduction of Progressive Closure and Rehabilitation Plans (PCRPs) in Queensland from 2019 places greater importance on planning and implementation of mine rehabilitation activities. The progres

    Aug 2, 2023

  • AUSIMM
    Design and calibration of a climate resilient Type B (adapted) sediment basin at the Dugald River Mine in the north-west Queensland minerals province

    By A Harburg, A Dendys, G Green

    Dugald River Mine (DRM) is located approximately 85 km north-east of Mount Isa, and 65 km northwest of Cloncurry, in the north-west Queensland Minerals Province of Australia. DRM is an underground ope

    Aug 2, 2023

  • AUSIMM
    Risks beyond relinquishment – quantifying post-relinquishment management and maintenance costs

    By M R. Lane, M L. Cramer, N P. Wines

    Increasing attention is being focused by regulators and industry on the residual environmental liabilities associated with mining projects following site relinquishment (termed surrender in Queensland

    Aug 2, 2023

  • AUSIMM
    Diavik Diamond Mine north country rock pile – an example of integrated mine planning for successful progressive reclamation

    By G Stephenson, G MacDonald, A Yeomans, S Sinclair, V Knott

    Rio Tinto has actively committed to progressive reclamation, concurrent with commercial operations, at its Diavik Diamond Mine. The most significant piece of progressive reclamation undertaken at Diav

    Aug 2, 2023

  • AUSIMM
    From ‘closing a mine’ to ‘transitioning a community’ – evolving from specific post-mining land-uses to a holistic post-mining vision

    By A Maier, M Goldner, C Gimber

    Given the ongoing global crises of climate change and nature loss, with the World Economic Forum (WEF) identifying them as the top risks to global economies in terms of both likelihood and impact in t

    Aug 2, 2023

  • AUSIMM
    Maximising regional opportunities for in-pit tailings disposal for Queensland coalmines

    By K Baker, J Purtill

    One of the key challenges for the mining industry globally is the rehabilitation of mine waste, and Queensland is no exception. Out of pit waste structures including waste rock dumps and tailings stor

    Aug 2, 2023

  • AUSIMM
    The importance and abundance of lichens and mosses on the restored landscape in the nickel-copper city of Sudbury, Ontario, Canada

    By S Wainio, P J. Beckett, T Miller

    Lichens are a symbiosis of fungi and algae. Air borne elements and gases are absorbed very efficiently over the entire surface of the lichen, because they have no protective structures such as a waxy

    Aug 2, 2023

  • AUSIMM
    Dynamic influences of optimisation on emissions

    By P J. Bangerter, J Pan

    Optimising for Net Present Value (NPV) with a strategic optimiser such as COMET, Prober-E, Blaser or Minemax has hitherto lacked a dynamic method for analysing the so-called third-order outcomes (such

    Aug 2, 2023

  • AUSIMM
    Envisioning the rehabilitation of assets through co-design and gamification

    By S Grant, S Emeric, P Baker, E Jones, D Clark

    As we strive for a sustainable and resilient future, repurposing assets has become a top priority. In Australia alone, we have a significant number of mineral projects in the pipeline, extensive exist

    Aug 2, 2023

  • AUSIMM
    Climate change risks to mine closure – planning for a range of impacts

    By N McIntyre, R Trancoso, N Bulovic

    Mining is essential for facilitating human development particularly as demand for critical minerals grows. However, over the mine life cycle, the environment is permanently changed. Once mining ceases

    Aug 2, 2023

  • SME
    Making iron directly from concentrate by gaseous reduction

    By H. Y. Sohn

    The paper discusses two processes, flash ironmaking technology (FIT) and moving-bed ironmaking technology (MBIT), which aim to reduce energy consumption and greenhouse gas emissions in the ironmaking

    Aug 1, 2023