Soil Conditioning for Potomac Group Soils in Washington DC - NAT2022
By R. Aliberti, E. Comis, M. Wone
DC Water’s Clean Rivers (DCCR) program involves the construction of approximately 29 km (18 mi) of CSO tunnels in Potomac Group soils in the Washington DC area. Soils include an upper predominantly ov
Dec 1, 2022
-
Hard Rock Tunnel Boring in Challenging Conditions at the Jefferson Barracks Tunnel - NAT2022
By Doug Harding
The Metropolitan St. Louis Water District’s Project Clear is a 28-year program targeting wastewater capacity throughout St. Louis, MO. The extensive program includes the Jefferson Barracks Tunnel, run
Dec 1, 2022
-
Precision Drilling for the Pardee Chemical Feed Shaft Project - NAT2022
By Emily Sing, Ashim Gajurel, Thomas Pennington, William Brown
The Pardee Chemical Feed Shaft Project involves construction of two new chemical feed shafts to improve raw water treatment capabilities at the East Bay Municipal Utility District’s (EBMUD) Pardee Res
Dec 1, 2022
-
Environmentally Friendly Soil Conditioning for EPB TBM: The State of Environmental Considerations in North America and Around the World - NAT2022
By T. Murt, C. Oñate
In recent years, environmental considerations have played a prominent role in underground construction projects. The management and disposal of the muck produced by an EPB TBM is an important aspect o
Dec 1, 2022
-
Effect of Machine and Operational Parameters on Utilization Factor -NAT2022
By Omid Frough, Hossein Changani
Application of Tunnel Boring Machines (TBMs) is one of the main solutions to achieve a safe and high-performance method of construction in hard rock and soft ground tunneling. In order to adequately a
Dec 1, 2022
-
Built to Last? A UK Initiative to Manage Tunnel Infrastructure - NAT2022
By Martin Knights
The UK Industry is preparing a new guide on Tunnel Asset Management that reflects current industry advances, in developed technological innovation and evolving tunnel asset owner requirements. This wi
Dec 1, 2022
-
The Northeast Boundary Tunnel—A TBM Performance Review - NAT2022
By Elisa Comis, Jeffrey Peterson, Yama Ebrahimi
Construction of the Northeast Boundary Tunnel (NEBT), the last leg of the Anacostia River Tunnel System on DC Water’s Clean Rivers Project, started in September 2018 and was completed in April 2021. T
Dec 1, 2022
-
Slurry Wall Construction in Coarse-Grained Soils - NAT2022
By J. Andrew McGlenn, Greg Emslie, Murray Gant
The Second Narrows Water Supply Tunnel will ensure system reliability in the event of a major earthquake and increase the Greater Vancouver Water District’s capacity to meet a growing population’s lon
Dec 1, 2022
-
Analysis and Design of Tunnel Lining Through a Potentially Displaceable Fault - NAT2022
By Theodore Feldsher, Seung Han Kim, Mourad Attalla, John Roadifer, Chu-Chieh Jay Lin
Lifelines in seismic regions of the world seldom can escape crossing active faults. Cities in California have been mitigating this risk by constructing improved fault crossings. This paper discusses t
Dec 1, 2022
-
Design and Construction of NEORSD’s Doan Valley Storage Tunnel - NAT2022
By Timothy O’Rourke, Karrie Buxton, Chris Lynagh, Daniel Dobbels, Frederick Vincent
The Doan Valley Storage Tunnel Project in Cleveland Ohio was constructed to control Combined Sewer Overflows (CSOs). It is a complex system of three tunnels ranging from 8.5 to 18 feet in diameter wit
Dec 1, 2022
-
Design and Construction of a Shallow Twin Tube Bifurcation— Atlanta Plane Train West Extension Project - NAT2022
By John Murray, Daniel Ebin, Robert Gould, Yiming Sun, Lizan Gilbert
The Atlanta Plane Train Tunnel West Extension is being constructed at Hartsfield-Jackson Atlanta International Airport using the Sequential Excavation Method (SEM). The tunnel has shallow ground cover
Dec 1, 2022
-
Emerging Safety and Productivity Technologies for North American Tunneling - NAT2022
By David Maust, Rob Albinger, Mike Walling, Michael Rispin
The safeguarding of health and life is the number one priority for underground infrastructure projects. While culture and approach are critically important, the industry has also seen the development
Dec 1, 2022
-
Newly Adopted Structure Criteria for BART Underground Facilities—Industry Update - NAT2022
By Samer Sadek, Phoebe Cheng, Changmo Kwon, Myat Ohn
BART Facilities Standards (BFS) Structural Criteria is a living document that governs planning, design, and construction of all BART projects. Since its development, the document undergoes incremental
Dec 1, 2022
-
Seattle’s Ship Canal Water Quality Project—Curved Microtunnel Drive - NAT2022
By Chris D. Breeds
Northwest Boring, Inc. (NWB) deployed a skinned up AVN 2000AB Microtunnel Boring Machine (MTBM) to install 7.5-foot long, 118-inch outer diameter reinforced concrete pipe (RCP) sections along an align
Dec 1, 2022
-
Implementation of Vibration Monitoring to Improve Blast Design for the Mitchell Point Crossing - NAT2022
By Nathaniel White, Todd Kilduff, Justin Laviolette, Dan Laviolette, Randy Zeigler, Sean Sundermann
The Mitchell Point tunnel is a part of several ongoing efforts to connect the 12-mile-long Historic Columbia River trail between Mitchell Point Outlook to Mitchell Point Drive. The tunnel lies inside
Dec 1, 2022
-
Courthouse Commons Tunnel: A Case Study of Modern SEM Tunneling - NAT2022
By Yiming Sun, John Stolz, Jakob Walter, Drew Mason
The Courthouse Commons SEM Tunnel was excavated within 6 feet of cover beneath two buildings in downtown San Diego utilizing high-precision geotechnical instrumentation. The excavated dimensions are a
Dec 1, 2022
-
Planning for Emerging Technology Underground Connection Between Rancho Cucamonga Metrolink Station and Ontario International Airport
By Mike Wongkaew, Brandon Kluzniak, Per Vilhelmsson
Rail access to Ontario International Airport (ONT) has long been a goal of San Bernardino County Transportation Authority (SBCTA) to increase public transit options to ONT and provide incoming ONT pas
Dec 1, 2022
-
Horizon Lateral: Reliability to Meet Community Needs Today and Tomorrow - NAT2022
By Ray Brainard, Adriana Ventimiglia, Amanda Kerr
Preliminary design is underway for a new Southern Nevada Water Authority (SNWA) project that will ensure one of America’s most reliable water systems by providing continued, reliable water service to
Dec 1, 2022
-
Applications of Artificial Intelligence in Tunnel Design and Construction - NAT2022
By Gunjan R. Bhattarai, Kumar Bhattarai
Recently, there has been an enormous increase of interest in artificial intelligence (AI), machine learning (ML), and their applications by researchers, government agencies, and the underground constr
Dec 1, 2022
-
Bridging the Gap—From Borehole Spacing to DSC Claim Resolution - NAT2022
By Kapila Pathirage, Michael S. Schultz, Gregory Sanders, Ulf G. Gwildis
Adequate understanding of the subsurface conditions along the alignment of a planned tunnel is key for managing project risk. For achieving this understanding, geotechnical borings are conducted durin
Dec 1, 2022