Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Optimising Western Australia Magnetite Circuit Design
By D David
The development of Western Australian magnetite deposits has lead to the design of some of the largest grinding mills and plants in the world. One of the projects demonstrates the efficiency gains po
Aug 8, 2011
-
Differences between the Engineering Cultures of Australia and Brazil
By C Fountain
Australian mining and engineering companies have increasingly been investing in the mining industry in Brazil. It is a country of enormous mineral and agricultural wealth, with a well-established mini
Aug 8, 2011
-
Energy Efficiency Assessments in Design – Seminal Decisions and Effective Processes
By M Allen
Energetics has been in the business of climate change for more than twenty years. This experience has only served to cement the understanding that decisions taken during design define the environmenta
Aug 8, 2011
-
Non-Contact Acoustic Measurement of Dynamic In-Mill Processes for SAG/AG Mills
By R A. Pax
Heavy machinery such as AG and SAG mills generate a significant amount of noise due to the processes that are occurring inside them. From an environmental perspective, the level of noise generated is
Aug 8, 2011
-
Recent Improvements to the Gravity Gold Circuit at Marvel Loch
By A Bird
Gravity gold circuits have an important part in reducing operating costs and maximising recovery in modern gold plants where coarse gold is present in the ore body. The design and selection of equipme
Aug 8, 2011
-
On-Belt Analysis at Sepon Copper Operation
By T Arena
To maintain copper recoveries and maximise production at the Sepon Copper Operation it is crucial to control the amount of copper entering the leaching circuit. This requires close control of blending
Aug 8, 2011
-
Flotation Process Control Optimisation at Prominent Hill
By J Lombardi
OZ Minerals' Prominent Hill copper-gold concentrator is located 130 kilometres south east of the town of Coober Pedy in the Gawler Craton of South Australia. The concentrator was built in 2008 an
Aug 8, 2011
-
Cost Effective Concentrator Design
By G Lane
This paper discusses the factors that contribute to the cost effective design of a concentrator. Concentrator design and layout outcomes are functions of the team (engineer’s and owner’s) participati
Aug 8, 2011
-
Guidelines for Economic Evaluation of Projects
By P Card
“Let’s get discipline and quality into easy to understand evaluations!” Project Managers and MetPlant Operators accept poor quality evaluations because they are generally unaware of what they should
Aug 8, 2011
-
Fosterville Gold Mine Heated Leach Process
By M Binks
The Fosterville Gold mine is located approximately 20km to the East of Bendigo in central Victoria. The gold at Fosterville occurs as solid solution within disseminated arsenopyrite and pyrite. The Fo
Aug 8, 2011
-
In-Pit Tailings – World’s Best Practice for Long-Term Management of Tailings
By G M. Mudd
Mine tailings represent one of the two largest sources of mine waste from the minerals industries (the other being waste rock). Given the problems of declining ore grades and growing production, taili
Aug 8, 2011
-
Contract Commissioning and Operation of Western Areas’ Cosmic Boy Concentrator
By C Dick
Over the past three decades, mining operations have seen a significant increase in the use of contractors for mining, camp management and catering, recruitment, maintenance, power management, and comm
Aug 8, 2011
-
Energy Efficiency Opportunities in Milling – Improving Comminution Circuit Efficiency
By F Musa
One of the main energy efficiency opportunities identified from the majority of mine site energy audits is to optimize the comminution circuit to reduce energy consumption through improved throughput
Aug 8, 2011
-
Float it, Clean it, Depress it – Consolidating the Separation Stages at Clarabelle Mill
By V Lawson
Vale’s Sudbury Clarabelle Mill processes Cu/Ni ores from a number of mines in the Sudbury basin in Ontario, Canada. Bulk sulphide flotation produces a copper-nickel concentrate with pyrrhotite as the
Aug 8, 2011
-
IsaMill™ Design Improvements and Operational Performance at Anglo Platinum
By C Rule
In 2003, Anglo Platinum, in a joint development with Xstrata Technology, installed the world’s first 10 000 litre IsaMillTM in a concentrate regrind duty at the Western Limb Tailings Re-treatment Plan
Aug 8, 2011
-
Engineering and Science in Flotation Cell Design
By J Euston
In the 1990s round flotation tanks were introduced as a result of the lower fabrication costs for larger cells. It was soon observed that round tanks held a number of further advantages over the tradi
Aug 8, 2011
-
In-Line Pressure Jig Preconcentration Plant at the Pirquitas Mine
By A H. Gray
Gekko Systems Pty Ltd engaged in the test work, design, manufacturing and commissioning of the pre-concentration plant at Silver Standard Resources Inc’s Pirquitas mine in the north western Jujuy prov
Aug 8, 2011
-
Increasing Capacity and Efficiency of Grinding Circuits with High Frequency Screens
By J Wheeler
The objective of this paper is to examine the operation of high frequency screens in closed circuit grinding, where the outcomes achieved indicate favourable economic gains at the comminution stage an
Aug 8, 2011
-
Predicting Variations in Mill Feed
By P McCarthy
The relatively new field of geo-metallurgy promises to improve the predictability of mill feed quality and enhance processing outcomes. However, it is subject to the same limitations as the prediction
Aug 8, 2011
-
Filtration Test Work – Extracting the Whole Story for Studies and Design
By G Bickert
Australia is currently developing and engineering a range of specialised processing options for rare earth (RE) (Lynas, 2011, Alkane, 2005), zirconia (Alkane, 2005), lithium (Galaxy Resources, 2008) a
Aug 8, 2011