Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Geochemical Ore Guides and Techniques in Exploration for Tin

    Geochemical data on Australian granites and pegmatites9 and the.,mineral.components of these rocks, is presented and compared with that obtained in similar studies in.the U.S.òS.R and:.elsewhere.The p

    Jan 1, 1963

  • AUSIMM
    Dynamic Pit and Waste Dump Schedule Optimisation at Tropicana Gold Mine

    By S Graskoski, S Craig, C Myburgh

    Too often in mine planning, maximising revenue-generating material takes precedence over minimising costs. The ability to target both revenue and cost optimisation enables mine plans to fulfil corpora

    Sep 26, 2013

  • AUSIMM
    Development – Back to Basics

    By I T. Ross

    In the last 50 years there have been tremendous improvements in equipment used in development on underground mines. Compressed air powered jacklegs have been replaced by high powered electro-hydraulic

    Mar 24, 2014

  • AUSIMM
    Education for Mining and Mineral Process Engineering in Australia

    This paper reviews the manpower requirements of the Australian mining industry. It has been necessary to provide general background information in order to support the view that university education i

    Jan 1, 1969

  • AUSIMM
    Measuring Safety Management Effectiveness in the Australian Mining Industry

    A 1991 survey of 48 mining companies, employing more than 24 000 employees, showed that disabling injury and disease rates continue to be the most common measurements of safety management effectivness

    Jan 1, 1992

  • AUSIMM
    Making Design and Construction Work

    By S Porter

    The Melbourne City Link Project is a privately funded road infrastructure project linking three significant existing freeways in the vicinity of the Central Business District. The State Government, th

    Jan 1, 1999

  • AUSIMM
    Technology and Changes in Mines Rescue

    As the mining industry looks to new technologies for a safe work environment and increased production rates, so should emergency response teams when dealing with organisational incidents. Implementati

    Jan 1, 2004

  • AUSIMM
    Scenario-based Project Evaluation – Full Mineral Value Chain Stochastic Simulation to Evaluate Development and Operational Alternatives

    By S Coward, S Jackson, S Moayer, J E. Vann

    The variability and uncertainty of mineralisation, coupled with subsequent uncertainty in mining and processing, is often paid scant regard or overlooked during the evaluation of mining projects. In m

    Aug 18, 2014

  • AUSIMM
    Water Management and Water Treatment at Golden Cross

    By Goldstone A

    The paper introduces a newly developed multi-function test rig for fracture grouting. This test rig has many functions and its performance is consistent. It can control and adjust accurately the op

    Jan 1, 1988

  • AUSIMM
    Variable Energy Explosives for Soft Ground Blasting

    By D Stow, R Goodridge, K J. Molloy

    A range of explosives has been specifically developed for soft ground blasting. These explosives can be used in both wet and dry blasting conditions, range in density from 0.3 - 1.2 g/cc and range in

    Jan 1, 2001

  • AUSIMM
    Modelling of Real-time Marker Data to Improve Operational Recovery in Sublevel Caving Mines

    By A D. Campbell, G R. Power

    The increasing availability of marker data in sublevel caving operations is changing the way draw can be managed to achieve positive recovery outcomes in these mines. This paper describes how marker d

    May 9, 2016

  • AUSIMM
    The Characteristics And Interpretation Of Whole Rock Geochemical Data, Willyama Supergroup, New South Wales-Trends Towards Ore

    By Mason D. O, Tuckwell K. D

    Whole rock geodhemical analyses from samples of Potosi gneiss within the Willyama Supergroup have been utilised to identify geochemical trends towards Pb/Zn ore positions. Although the analyses co

    Jan 1, 1983

  • AUSIMM
    Classification and Development in Grade Control Blasting for Surface Mines

    By T N. Little

    The grade control process undertaken at mines aims to maximise the value of the ore (valuable product) mined and fed downstream for processing or sale. The full range of grade control activities inclu

    Aug 24, 2015

  • AUSIMM
    Strata Movement Associated WIH Longwall Mining

    By Hughson B

    A multi-wire borehole instrumentation system was used to monitor strata movement caused by a retreating longwall face at the Ellalong Colliery, situated in the Lower Hunter Valley in New South Wal

    Jan 1, 1987

  • AUSIMM
    Excavation Design and Mining Methods in the 1100 Orebody, Mount Isa Mine, Australia

    By Sullivan BJK

    The 1100 orebody is a massive copper sul- phide orebody which contains a major portion of the Isa Mine copper ore reserves of 130 million tonnes at 3.2%. The underground mining of a deposit as larg

    Jan 1, 1978

  • AUSIMM
    Stress Intensity Factors of Chevron-Notched Semi-circular Specimen

    A three-dimensional finite element analysis is used to determine the stress intensity factors associated with the chevron-notched semi-circular bend test specimen. The stress intensity factor calibr

    Jan 1, 1998

  • AUSIMM
    Project Management

    Mining and metals projects have tended to increase in both scope and cost to a point where many projects are Droperly designated as superprojects. Specialist engineer- constructors have developed or

    Jan 1, 1980

  • AUSIMM
    The Evolution of Cut and Fill Mining at Isa Mine

    By Wright J

    Large scale cut and fill mining in narrow silver-lead-zinc orebodies began at Mount Isa in 1964. Initially each orebody was one stope and access was via raises from the level above. Upholing was t

    Jan 1, 1988

  • AUSIMM
    Discontinuity Analysis in Open Cut Exposures - Examples from Selected Central Victorian Sites

    By Fowler T. J

    Examples are provided of discontinuity analysis at selected sites in central Victoria. Discontinuities are rock fractures of low tensile strength, including bedding, foliations and joints, which are

    Jan 1, 1997

  • AUSIMM
    Examples of Groundwater Sustainability Issues in Mining

    For Australian mining projects, sustainable groundwater use is typically defined as a groundwater extraction regime, measured over a specified planning time frame, which allows acceptable levels of st

    Jan 1, 2006