Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
On the Effect of Dynamic Fracture Rocks on the BlastingThe impulsive loading tests under confining pressure were performed to investigate the dynamic fracture properties of rocks in a triaxial stress state. The apparatus in this study consists of the Sp
Jan 1, 1990
-
The Viability for Industrial Use of Acid-Activated Bentonites from the Santa Elena Peninsula, EcuadorBy M A. Gontalves, A F. D C Varajpo, S A. Stachissini
Clays from the Santa Elena Peninsula, south-east of the Ecuador coast, were investigated with a view to identifying their main mineralogical, physical, chemical and textural characteristics as well as
Jan 1, 2008
-
Kinetics and M÷ssbauer Spectroscopy Studies of Direct Iron Ore ReductionBy Zhou A, Cadogan J. M
Direct reduction of iron ore (DR) is one of the promising technology emerging in the world's steel industry. Kinetics and Mossbauer studies of DR with hydrogen have been carried out at two temp
Jan 1, 1997
-
Drill Blast OptimisationScientific drilling and blasting techniques are currently being presented to the mining industry as an aid in the overall optimisation process. The degree of success in the development of these techn
Jan 1, 1990
-
The Ranger Project a Case StudyRanger Uranium Mines Pty. Ltd. operates an open pit mine and ore treatment plant in the Northern Territory designed to produce 3 000 tonne/yr of U308 in yellowcake from 3 500 tonne/day of mill fee
Jan 1, 1983
-
Regional Geology of New Caledonia and Northern North Island, New ZealandNew Caledonia, Norfolk Island and northern- most New Zealand lie on a long, narrow, ridge system, the Norfolk Ridge System, which is sit- uated in the centre of a geologically complex region of ridg
Jan 1, 1987
-
Virtual Hailage Trucks: Improving the Safety of Surface MinesBy Denby B, Hollands R. Schofield D
Surface mines are in operation worldwide, the vast majority employ large haul trucks for the transfer of material both to the outside world and around the site. The sheer size of these trucks and th
Jan 1, 1998
-
Zinc Extraction and RefiningAustralia has been an important producer of zinc minerals and metal for many years.Late in the last century Edgar A. Ashcroft, a versatile and enterprising electrical engineer proposed the treatment o
Jan 1, 1985
-
Electrolytic Zinc Plant Operations at Port PirieBy Martin JD, McNicol JH
The electrolytic zinc plant at Port Pirie South Australia, was designed and constructed to treat zinc oxide fume recovered by treatment of lead blast furnace slag in two fuming furnaces, The plant
Jan 1, 1975
-
A Preliminary Model of a Water-Only Cyclone and its Application to Product Quality ControlBy Spottiswood DJ, Kelly EG, Bull WR
An empirical model of a 254mm water-only cyclone treating minus 17001im coal has been developed. The model includes the prediction of by-passing, SG50 corrected, water split and the use of a single eq
Jan 1, 1985
-
History and Present Operation of the Heavy Medium Separation Plant at Renison Limited, TasmaniaIn 1972, metallurgical testwork on Renison ore indicated a significant proportion of low specific gravity, tin-barren material ideally suited to heavy medium separation (HMS). Further technical an
Jan 1, 1978
-
A major Thermal Cycle, Contributing to Late Palaeozoic-Mesozoic Magmatism and Mineralization, Pacific Rim, AustraliaMagmatism and mineralization are features of the New England Orogen in late Palaeozoic- Mesozoic time. Voluminous silicic and mafic magmatism, both orogenic and post-orogenic in association, was ac
Jan 1, 1987
-
The Evolution of Stope Backfill at Olympic Dam OperationsBackfil ling of excavated Sub Level Open Stopes has been underway since March 1989 and as at December 1992 some 1 100 000 cubic metres of Cemented Aggregate Fill have been placed. During these three y
Jan 1, 1993
-
The Extraction of Useful Values from StudiesBy Rintoul AH
Studies of many types and purposes are being carried out constantly by mining, minerals processing and other operating companies. Frequently, the staff requirements and special skills lie outside t
Jan 1, 1975
-
Resource and Reserve Calculations - The Experience at BHP-Utah Coal LimitedThe process of evaluating orebodies at the feasibility study stage is extremely important. In recent times many groups have indicated that they would like ore reserve estimation to be numeric and o
Jan 1, 1990
-
GPSS Computer Simulation of the Coal Bunker System at a Proposed Power StationBy Sturgul J. R
A major electricity generating authority have a proposal to construct a Power Station. An understanding of the operation of the bunker system is of importance to the designers and a computer simulat
Jan 1, 1988
-
Emergency Management Systems and PlansDespite improving technology, better training and the use of modern monitoring and communication systems there is a disproportionate rate of diameter occurrences in the mining industry. The use of app
Jan 1, 1998
-
Pressure Oxidation Performance at Porgera: 1995 to 1997By Raudsepp R
Since 1991, the Porgera Joint Venture has processed refractory sulphide flotation concentrate by pressure oxidation with the subsequent gold recovery, from the washed residue, via a conventional lea
Jan 1, 1997
-
The Metallurgical Evaluation of AK1 Kimberlite to Establish Process Design CriteriaBy Mack JF
A metallurgical evaluation of the Argyle Kimberlite No. 1 (AKl) orebody has been carried out using a 40 tonnes per hour pilot plant. Pilot plant results, together with laboratory investigations pro
Jan 1, 1984
-
Time Value of Money and Optimal Location of Mining FacilitiesThis paper examines the impact of the time value of money on the location of mining facilities, as examplified by a central processing plant serving several mines. Three approaches, the Euclidean-Di
Jan 1, 1995