Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    On the Effect of Dynamic Fracture Rocks on the Blasting

    The impulsive loading tests under confining pressure were performed to investigate the dynamic fracture properties of rocks in a triaxial stress state. The apparatus in this study consists of the Sp

    Jan 1, 1990

  • AUSIMM
    The Viability for Industrial Use of Acid-Activated Bentonites from the Santa Elena Peninsula, Ecuador

    By M A. Gontalves, A F. D C Varajpo, S A. Stachissini

    Clays from the Santa Elena Peninsula, south-east of the Ecuador coast, were investigated with a view to identifying their main mineralogical, physical, chemical and textural characteristics as well as

    Jan 1, 2008

  • AUSIMM
    Kinetics and M÷ssbauer Spectroscopy Studies of Direct Iron Ore Reduction

    By Zhou A, Cadogan J. M

    Direct reduction of iron ore (DR) is one of the promising technology emerging in the world's steel industry. Kinetics and Mossbauer studies of DR with hydrogen have been carried out at two temp

    Jan 1, 1997

  • AUSIMM
    Drill Blast Optimisation

    Scientific drilling and blasting techniques are currently being presented to the mining industry as an aid in the overall optimisation process. The degree of success in the development of these techn

    Jan 1, 1990

  • AUSIMM
    The Ranger Project a Case Study

    Ranger Uranium Mines Pty. Ltd. operates an open pit mine and ore treatment plant in the Northern Territory designed to produce 3 000 tonne/yr of U308 in yellowcake from 3 500 tonne/day of mill fee

    Jan 1, 1983

  • AUSIMM
    Regional Geology of New Caledonia and Northern North Island, New Zealand

    New Caledonia, Norfolk Island and northern- most New Zealand lie on a long, narrow, ridge system, the Norfolk Ridge System, which is sit- uated in the centre of a geologically complex region of ridg

    Jan 1, 1987

  • AUSIMM
    Virtual Hailage Trucks: Improving the Safety of Surface Mines

    By Denby B, Hollands R. Schofield D

    Surface mines are in operation worldwide, the vast majority employ large haul trucks for the transfer of material both to the outside world and around the site. The sheer size of these trucks and th

    Jan 1, 1998

  • AUSIMM
    Zinc Extraction and Refining

    Australia has been an important producer of zinc minerals and metal for many years.Late in the last century Edgar A. Ashcroft, a versatile and enterprising electrical engineer proposed the treatment o

    Jan 1, 1985

  • AUSIMM
    Electrolytic Zinc Plant Operations at Port Pirie

    By Martin JD, McNicol JH

    The electrolytic zinc plant at Port Pirie South Australia, was designed and constructed to treat zinc oxide fume recovered by treatment of lead blast furnace slag in two fuming furnaces, The plant

    Jan 1, 1975

  • AUSIMM
    A Preliminary Model of a Water-Only Cyclone and its Application to Product Quality Control

    By Spottiswood DJ, Kelly EG, Bull WR

    An empirical model of a 254mm water-only cyclone treating minus 17001im coal has been developed. The model includes the prediction of by-passing, SG50 corrected, water split and the use of a single eq

    Jan 1, 1985

  • AUSIMM
    History and Present Operation of the Heavy Medium Separation Plant at Renison Limited, Tasmania

    In 1972, metallurgical testwork on Renison ore indicated a significant proportion of low specific gravity, tin-barren material ideally suited to heavy medium separation (HMS). Further technical an

    Jan 1, 1978

  • AUSIMM
    A major Thermal Cycle, Contributing to Late Palaeozoic-Mesozoic Magmatism and Mineralization, Pacific Rim, Australia

    Magmatism and mineralization are features of the New England Orogen in late Palaeozoic- Mesozoic time. Voluminous silicic and mafic magmatism, both orogenic and post-orogenic in association, was ac

    Jan 1, 1987

  • AUSIMM
    The Evolution of Stope Backfill at Olympic Dam Operations

    Backfil ling of excavated Sub Level Open Stopes has been underway since March 1989 and as at December 1992 some 1 100 000 cubic metres of Cemented Aggregate Fill have been placed. During these three y

    Jan 1, 1993

  • AUSIMM
    The Extraction of Useful Values from Studies

    By Rintoul AH

    Studies of many types and purposes are being carried out constantly by mining, minerals processing and other operating companies. Frequently, the staff requirements and special skills lie outside t

    Jan 1, 1975

  • AUSIMM
    Resource and Reserve Calculations - The Experience at BHP-Utah Coal Limited

    The process of evaluating orebodies at the feasibility study stage is extremely important. In recent times many groups have indicated that they would like ore reserve estimation to be numeric and o

    Jan 1, 1990

  • AUSIMM
    GPSS Computer Simulation of the Coal Bunker System at a Proposed Power Station

    By Sturgul J. R

    A major electricity generating authority have a proposal to construct a Power Station. An understanding of the operation of the bunker system is of importance to the designers and a computer simulat

    Jan 1, 1988

  • AUSIMM
    Emergency Management Systems and Plans

    Despite improving technology, better training and the use of modern monitoring and communication systems there is a disproportionate rate of diameter occurrences in the mining industry. The use of app

    Jan 1, 1998

  • AUSIMM
    Pressure Oxidation Performance at Porgera: 1995 to 1997

    By Raudsepp R

    Since 1991, the Porgera Joint Venture has processed refractory sulphide flotation concentrate by pressure oxidation with the subsequent gold recovery, from the washed residue, via a conventional lea

    Jan 1, 1997

  • AUSIMM
    The Metallurgical Evaluation of AK1 Kimberlite to Establish Process Design Criteria

    By Mack JF

    A metallurgical evaluation of the Argyle Kimberlite No. 1 (AKl) orebody has been carried out using a 40 tonnes per hour pilot plant. Pilot plant results, together with laboratory investigations pro

    Jan 1, 1984

  • AUSIMM
    Time Value of Money and Optimal Location of Mining Facilities

    This paper examines the impact of the time value of money on the location of mining facilities, as examplified by a central processing plant serving several mines. Three approaches, the Euclidean-Di

    Jan 1, 1995