Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Non-Parametric Bayesian Framework for Automatic Block EstimationBy A Melkumyan, F Ramos
This paper addresses the problem of prediction of grade variables over volumes (block estimation) for an autonomous mine. Resource estimation is usually concerned with the prediction of the quality of
Sep 26, 2011
-
The Structural/Stratigraphic Development of the Sishen South (Welgevonden) Iron Ore Deposit, South Africa, as Deduced From Ground Gravity Data ModellingBy W J. Botha
The Palaeoproterozoic Transvaal Supergroup in the northern Cape Province of South Africa hosts high grade (>60 per cent Fe) hematitic and specularitic iron and manganese mineralisation. The mineralisa
Jan 1, 2005
-
A Study into Bonding within Reduced Titanomagnetite-Coal CompactsBy R J. Longbottom
In this study the bonding within reduced titanomagnetite-coal compacts was investigated. The aim of the study was to better understand the binding mechanisms in the reduced compacts and, based on this
Jul 11, 2011
-
Chelopech Mining EAD and Best Available Techniques for Management of Waste Rock in Mining ActivitiesChelopech Mining EAD and Best Available Techniques for Management of Waste Rock in Mining Activities
Sep 13, 2010
-
No assumptions, no surprisesBy G Deans, M Longbottom
OZ Minerals’ Carrapateena mine is one of Australia’s newest ‘greenfield’ mining deposits. It will be a 4.25 Mtpa sub level cave underground operation, with an estimated mine life of 20 years. The inte
Jul 1, 2021
-
Using technology to support best practice for tailings storage facilities (TSF) management, governance and disclosureBy H Arvidson, A Walker, N Pollock
Following the recent tailings tragedy in Brumadinho, the Investor Mining and Tailings Safety Initiative was formed representing institutional investors in the mining industry. This Initiative, led by
Jul 1, 2021
-
A New Approach to Mining Research in CanadaBy A Galley, M Plouffe, T Hynes
Canadian mining research has recently been reinvigorated through a pan-Canadian research strategy driven by the industry, the research community and government departments. These organisations have co
Jul 10, 2012
-
Quantitative airblast risk assessments for block and sublevel cavesBy C Vejrazka1
The occurrence of airblasts is one of the principal mining hazards in caving operations between the time of cave establishment and breakthrough of the cave to surface. As such, it needs to be managed
Oct 12, 2022
-
Experimental Study of Ore Characterisation Methods for AG/SAG MillsExperimental Study of Ore Characterisation Methods for AG/SAG Mills Mining companies have long recognised the importance of ore breakage characterisation in design and optimisation of their crushing
Sep 13, 2010
-
Project Feasibility Studies - A Necessary Step or the Best Opportunity to Add Value and Certainty?By J Borthwick, M Yusi, M Douge
Feasibility studies form a vital and significant component of the project delivery cycle. They are at the heart of the valuation process. This paper focuses on variables which can affect a project and
Jan 1, 2009
-
Risk "Thinking" for Australian TunnellingA paper presenting an overview of legislative and best practice approaches to the management of OHS&E and business risk for Australian tunnelling operations. Best practice can be achieved in
Jan 1, 2008
-
Operating Experience of Roller Seed Screens at the Whyalla Pellet PlantRoller seed screens were installed at The Broken Hill Proprietary Company Limited (B.H.P.) Whyalla pellet plant to replace vibrating screens on the green ball circuits. The installation of roller
Jan 1, 1984
-
A Geostatistical Approach to the Pit Optimization ProblemsThe word "optimization", refers to the search of an economic optimum, or, more precisely, to the choice of technical parameters which will define the more profitable mining project, knowing the va
Jan 1, 1986
-
Optimising Flow in the Mining Value ChainBy A Dunne, R Kruger, H Coleman, P G. Laurens
External and internal challenges in mining are increasing the difficulty and complexity of operating mines. The external mining environment has a big impact on mining operations and is driving the foc
Jul 13, 2015
-
Do we Need a Gravity Circuit or Not? A Case Study in Applying Best PracticeBy A Giblett, K Afewu
This paper uses a case study to demonstrate best practices techniques for predicting the contribution of gravity concentration in a gold recovery process flowsheet. The case study was selected as an e
Sep 7, 2015
-
3D estimation of variables with complexity in cross-correlation structuresBy N Madani
Linear interpolation of geo-related variables is important to different aspects of mining engineering such as long and short-term mine planning. The ore deposit description attained from spatial model
Nov 21, 2018
-
Applicability of TBM (tunnel boring machine) for deep lunar subsurface explorationBy T Y. Ko, Y S. Kang, S J. Park, J H. Hwang
The lunar subsurface, particularly the lava tubes formed by ancient volcanic activity, presents a promising environment for establishing safe and sustainable human habitats on the Moon. Tunnel Boring
Sep 1, 2024
-
Presentation of the Institute Medal, 1977 to Howard Knox Worner, C.B.E.By J. K. A. McLEOD
Address by the President of the Institute (Mr J K A McLeod) in presenting the Institute Medal to Howard Knox Warner, C.B.E. Address by Howard Knox Warner after accepting the award.
Jan 1, 1978
-
Efficiency improvement of Jalal Abad beneficiation plant by concentrate quality enhancement and tailings recoveryBy M Lak, R Amiri, A Haratian, M Asghari, S Haji
In recent years, due to advances in designing of various magnet assemblies, a wide range of magnetic materials with different properties can be concentrated. Jalal Abad iron ore beneficiation plant, w
Nov 8, 2021
-
Claiming the Green Revolution - Protecting Investment in Green Mineral ProcessingClaiming the Green Revolution - Protecting Investment in Green Mineral Processing
Sep 13, 2010