Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Kidston Waste Rock Dump Design and æStore and ReleaseÆ Cover Performance Seven Years OnBy G W. Wilson, P Ritchie, N A. Currey
The design and rehabilitation of potentially acid forming (PAF) waste rock dumps is site specific, being a function, among other factors, of the rock types, the dumping and storage method employed, an
Jan 1, 2003
-
Coal Mine Face Area VentilationOne of the most difficult places to ventil ate in any mine is the working face area of an advancing mine heading. With an ever changing configuration, continual modification and extension to the ve
Jan 1, 1983
-
MillMapper Experiences - A Mill Condition Monitoring and Operational Improvement Case StudyThis paper describes the MillMapper technology developed for condition monitoring of liners and other operational parameters in grinding mills used for mineral comminution, by presenting a case study
Jan 1, 2008
-
Still Pillar Mining - An Evaluation of Requirements and Techniques for Stabilisation of Bottom Slice FillBy Andersson PO
Boliden Mineral AB Boliden Mineral AB operates nine mines in Northern and Central Sweden, producing zinc, lead and silver concentrates and copper and gold. Seven of these mines use cut and fill (C&F
Jan 1, 1998
-
No. 3 Shaft Sub-Brace AreaWith the sinking of the No. 3 Shaft and the erection of a changehouse nearby, a sub-brace level structure was provided incorporating a time office, underground foremenÆs office and lamp room, in conju
Jan 1, 1957
-
Use and Abuse of Geological Data for Mine Project DevelopmentThis paper sets out to discuss some of the more common forms of geological data abuse in project development. The paper illustrates various types of abuse and the reasons behind that misuse of dat
Jan 1, 1983
-
Ball Mill Simulation Using Small CalculatorsThis paper shows how small calculators can be used for ball mill simulations. Two calculations are examined, the first to calculate the mill parameters and the second to predict the mill product. In t
Jan 1, 1976
-
Some Economic Aspects Of Ore ReservesA schematic overview of the variables which interact to determine ore reserves precedes consideration, in this context, of some recent views on the concept of a 'production cycle'. Politi
Jan 1, 1979
-
Installation of 17 Cubic Metre Flotation Cells at North Mine, Broken HillBy Harris HR
This paper documents the selection, installation and performance of six, seventeen cubic metre, Dorr-Oliver flotation cells for primary zinc flotation at the North Mine in Broken Hill. The cells wer
Jan 1, 1988
-
The Oscillating Disc Cutter - The Breakthrough Tool for Continuous Rock ExcavationBy X Li, H Alehossein
The oscillating disc cutter (ODC) is an innovative technology for the continuous excavation of hard rock. This paper will discuss:the reasons for its development;its method of operation;current experi
Jan 1, 1999
-
Supergene Enrichment of Ilmenite-Is it Related to Laterization?Supergene enrichment of ilmenite occurs through a complex series of reactions with initial oxidation and hydration followed by leaching and dehydration. Lateritization appears to be associated wit
Jan 1, 1986
-
South Comet MineThe South Comet mine is an underground silver-lead-zinc mine located on the West Coast of Tasmania with an annual production in the order of 35 000 tonne per year. All ore mined is shipped to the Rose
Jan 1, 1993
-
Twenty Five Million Tonnes of Ore and Ten Metres of RainBy Maconochie A. P
The copper-gold orebodies of the Ok Tedi project and located in an area of climatic and topographic extremes, where both the landforms and the rocks from which they have developed are so young that it
Jan 1, 1990
-
Australian Longwall Geomechanics - A Recent StudyBy Stewart A. M, Price D
This paper presents recent findings concerning longwall caving mechanisms relating to Australian mining conditions and their effect upon longwall support requirements and behaviour. The findings ar
Jan 1, 1992
-
The Development of Very Large Screens for the Preparation of Coal and Mineral Raw MaterialsThe paper describes the reasons for the development and for the selection of systems which were finally adopted; further estima- tion and design engineering problems, as well as experience with lar
Jan 1, 1984
-
Blasting for Reduced Process Plant Costs at Argyle Diamond MineBy Smallnone P, Walker B
Mining of the AKI lamproite pipe at the Argyle Diamond Mine (ADM) commenced in 1985. Originally designed to mine ore at a rate of 3.6 Mt per annum, the project has gone through two major plant expan
Jan 1, 1998
-
Strategic mine schedule optimisationBy A Tsoy
This abstract describes long-term mining schedule optimisation approach that may be suitable for complex marginal projects and is based on modern scheduling techniques. CITATION: Tsoy, A, 2018. Strate
Nov 21, 2018
-
Tailings Management at Macraes Gold MineAn important consideration in any mining operation is waste disposal management. Tailings management at Macraes gold mine allows for the disposal of tailings into fully engineered embankment dams and
Jan 1, 1992
-
Mine Management - The Need for New SkillsA case is made for broader commercial education of executive and operational managers in Australian mining companies. The competitive advantages and disadvantages of Australian miners are examined. Ar
Jan 1, 1985
-
Nuclear Waste Disposal-A New Application for Titanite CeramicsAustralia is a significant exporter of uranium for use as fuel in nuclear generating plants around the world. Although Australia does not have any nuclear power plants the Australian Atomic Energy Com
Jan 1, 1986