Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Discovery Performance for Gold and Base Metals in the Pacific/South-East Asia – 2005–2014

    By R C. Schodde

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Over the last decade (2005–2014), a total of 439 significant deposits of gold and base meta

    Mar 18, 2015

  • AUSIMM
    Long hole plug – addressing the hazard of bogged rods in ‘upholes’

    By G Noonan, S Thomas, M Limbert

    Stuck drill rods (often referred to as bogged rods) in production ‘upholes’ are a common problem in the underground mining industry. Bogged and broken off drill rods have the potential to fall out of

    Oct 16, 2017

  • AUSIMM
    Operations and Control of 32 Feet Diameter SAG Mills at Ok Tedi

    By Katom M

    Each of the two 32 feet diameter Semi Autogeneous Grinding (SAG) mills at Ok Tedi's copper and gold concentrator was treating at best 1500 tph at about 65 per cent mill availability in 1988. Th

    Jan 1, 1997

  • AUSIMM
    The Benefits of Computational Modelling in Improving Iron Ore Production and Processing

    By M P. Schwarz

    A major issue presently faced by companies producing and processing iron ore is the need to maximise throughput while minimising capital expenditure. While present high demand means this is of prime i

    Jul 11, 2011

  • AUSIMM
    The Arrium IsaMill from Design through Commissioning and Optimisation

    By G Anderson, M Mativenga, C Stanton, M Larson

    Arrium’s magnetite concentrator has recently completed a modification program to improve the process that has been in operation in Whyalla, South Australia for the previous seven years. The magnetite

    Sep 7, 2015

  • AUSIMM
    Design and calibration of a climate resilient Type B (adapted) sediment basin at the Dugald River Mine in the north-west Queensland minerals province

    By A Harburg, A Dendys, G Green

    Dugald River Mine (DRM) is located approximately 85 km north-east of Mount Isa, and 65 km northwest of Cloncurry, in the north-west Queensland Minerals Province of Australia. DRM is an underground ope

    Aug 2, 2023

  • AUSIMM
    Reducing the Cost of Tunnel Design in Australia

    By B Rouvray, R Bertuzzi

    The development of a design-and-construct tunnelling project in Australia from its concept to its construction requires designs to be prepared and reviewed at several distinct stages prior to document

    Sep 17, 2014

  • AUSIMM
    Quantifying Geotechnical Risk in the Mine Planning Process

    By T P. Medhurst

    In many cases mine design is the most important driver of the profitability of a mining project, however to reach an æoptimumÆ mine plan many compromises have to be made. Some of the fundamental profi

    Jan 1, 2000

  • AUSIMM
    Share Market Floats - Issues for Exoert Valuers

    The topic for my address is Sharemarket Floats - Issues for Expert Valuers. I've decided to focus on three areas where current practice in the preparation of prospectus valuation reports for reso

    Jan 1, 1989

  • AUSIMM
    A case study of technical, social and environmental challenges for a gold project development in Western Turkey

    By R Valenta

    Most developing projects face a range of technical and non-technical challenges, and examination of development histories can potentially provide insights into improved approaches to project developme

    Nov 21, 2018

  • AUSIMM
    A Three Dimensional Kinematic Model of Muckpile Formation in Bench Blasting

    By Kavetsy A

    In surface mining operations, the ease with which a muckpile may be dug is a dominant factor in mining efficiency. Within broad limits this is largely independent of the fragment size dis- tribution

    Jan 1, 1988

  • AUSIMM
    Productivity Gain from Advances in Mining Geology - Signposts for the Future

    By White A, Price G

    The main assets of a mining company are its orebodies; the second are the people who find and use them.The graphs in Figure 1 were derived from a paper by Rob Macdonald of Rothschild Australia present

    Jan 1, 1993

  • AUSIMM
    Errors and Uncertainty in Ore Reserve Estimates ù Operator Beware

    By A E. Annels, M NoppT

    Ore Reserves are key mining company assets and their reliable estimation is crucial for both feasibility studies and the day to day operation of a mine. The reserve is based on the Mineral Resource af

    Jan 1, 2002

  • AUSIMM
    Evaluation of Blast Furnace Slag as Base Material in Road Pavements

    Graded macadam slag base has been used successfully by the Department of Main Roads, N.S.W., in the construction of Expressways. However, the use of graded macadam in urban conditions introduces p

    Jan 1, 1979

  • AUSIMM
    Environmental Impact Assessment For A Silica Sand Quarry In A New South Wales Coastal Recreation Reserve

    By Longworth C. R

    Competing requirements for land usage sometimes make the correct all- ocation difficult. The decision can be complicated by many factors such as local resident pressure, previous government decisio

    Jan 1, 1976

  • AUSIMM
    The Economic Consequences of Drill Hole Deviation in Crushed Aggregate Production

    For many crushed aggregate producers will the finest fraction minus 4 mm represent a problem. The fine material will fetch a much lower price than the coarser products, and may even be difficult to se

    Jan 1, 1999

  • AUSIMM
    Role of On-Line Analysis in Quality Control of Iron Ore

    By P J. Mathew

    Quality and process control in the iron ore industry is based on measurements of ore grade from blast holes through to shiploading. Traditionally this has been carried out using conventional sampling,

    Jan 1, 1998

  • AUSIMM
    The Pre-concentration of Precious and Base Metal Deposits Using the Inline Pressure Jig – Higher Feed Grades and More Metal

    By G J. Delemontex, N J. Grigg

    Pre-concentration of precious metal and base metal ore types is becoming more relevant with the discovery, development and operation of many lower grade deposits around the world. The fluctuations in

    Sep 7, 2015

  • AUSIMM
    Assessment of Environmental Quality Impacts Caused by Red Mud Storage Facilities in China

    By S Zheng, Y Zhang, Z Wen, S Ma

    Red mud (RM) is a solid waste product generated during alumina refinery process, and is usually stored in SFs (SFs) because it canÆt be disposed of easily. In this paper, environment degradation cause

    Jul 10, 2012

  • AUSIMM
    Oxygen Potentials and Slag-Matte Reactions in the Kalgoorlie Nickel Smelter

    By Waladan M, Elliot B, Rankin W. J

    A survey was undertaken on the Kalgoorlie Nickel Smelter in which samples of slag and matte were taken along the length of the integrated flash smelting furnace and analysed to determine the variati

    Jan 1, 1991