Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Mount Leyshon Gold Mine (NE Queensland), an Intrusive Breccia and Igneous ComplexBy Orr T. O H, Hodkinson I. P
The Mount Leyshon breccia complex is located on an east-west trending contact between Cambrian metasediments (Puddler Creek Formation) and the Ordovician Mt. Leyshon granite, within the Lolworth-Rav
Jan 1, 1991
-
The McArthur River ProjectBy Kareise G. J, Leung K
The McArthur River (HYC) deposit, located in the Northern Territory of Australia, was discovered by Mt Isa Mines Limited geologists in 1955. It is one of the largest sedimentary stratiform zinc-lead
Jan 1, 1993
-
Reduction Kinetics and Mechanism of Pellets Prepared from High-chromium Vanadium-titanium Magnetite ConcentrateBy P N. Duan, Z G. Liu, M S. Chu, X X. Xue, B Liu, G J. Cheng, T Jiang, J X. Liu
High-chromium vanadium-titanium magnetite has not been exploited and made full use of on a large scale so far due to the immature utilisation technology and the reality that the utilisation efficiency
Jul 13, 2015
-
CFD modelling of slag fuming, with focus on freeze-lining formationBy N Voller, A Ishmurzin, G Hackl, M Wu, A Kharicha, M Chintinne, C M. G Rodrigues, A Ludwig
Slag fuming (SF) is a critical process for recycling zinc-containing slags, but the corrosive nature of molten slag poses challenges to the reactor durability. The freeze-lining (FL) technique offers
Aug 21, 2024
-
Five years of cover performance monitoring and modelling for a store and release cover at Century MineBy T Rohde, P Defferrard
In 2010 a store and release cover (the cover) was constructed on the south waste rock dump (SWRD) at Century mine. This also included aerial seeding of province native trees and shrub seeds. The purpo
Jul 23, 2018
-
The Modernisation and Upgradeáof Concentrator Operations at the Chelopech Mine, Bulgaria - Design, Installation and Operation of the 250 tonnes per hour Comminution CircuitBy K Evtiminova, G Jobson, M Nolte, S Meik
Chelopech Mining EAD (CMEAD) is a wholly owned subsidiary of Dundee Precious Metals Inc (DPM) and operates the Chelopech underground mine and processing facility located in Bulgaria. The final product
Oct 29, 2012
-
Developing the West Pilbara Iron Ore ProjectBy K Watters
API Management Pty Ltd (API) is currently developing the West Pilbara Iron Project (the ‘Project’). The Project is a substantial greenfi elds mining and infrastructure development proposed for the wes
Jul 11, 2011
-
Productivity Enhancements to Increase Ore Production from 18 to 36 Mt at AitikBoliden's Aitik open pit mine located in northern Sweden, will expand yearly production from 18 to 36 Mt of copper ore during 2010. The expansion includes a new concentrator located 3 km off the
May 1, 2010
-
Consideration of asymmetric drive geometry and conditions on the loading capacity of pastefill barricadesBy M Revell, B Sainsbury, D Sainsbury
This paper extends the existing knowledge associated with the design and placement of prefabricated pastefill barricades through a consideration of asymmetric drive geometry and conditions. The load c
Nov 29, 2022
-
Ore Reserve Estimation - The Systematics to Get it RightBy S N CARRAS
Ore reserve estimation is a procedure involving data collection, data storage and judgement and assumptions about geology mining and metallurgy. Calculations are based on these assumptions and an e
Jan 1, 1992
-
Innovative Victoria Park Tunnel design is Communicated Effectively to Stakeholders with the Aid of Three-Dimensional Visualisation MediBy M Sparrow
The Victoria Park Tunnel project is an inner-city alliance project in central Auckland, New Zealand. The existing two-directional viaduct will be modified to single-direction flow, and a new northboun
Mar 8, 2011
-
Mining a Narrow Ore Body - Innovative Mining and Blasting MethodsBy LeJuge G. E, McKenzie C. K
Innovative mining and blasting techniques were demanded at the Richmont Mines, Francoeur Mine in Quebec, Canada, by a narrow, shallowly dipping high grade gold ore body. The ore body being mined oc
Jan 1, 1992
-
Comparison of Belt Transmission of Power with other Forms of Power TransmissionThe comparison of belt drives with other types of power transmission involves the consideration of many factors before a final choice is made. Where other forms of power transmission might also be s
Jan 1, 1964
-
Control of Water PollutionThe hydrological cycle in nature, with particular reference to Australia . 2. The definition of water pollution drawing on the experience of several major countries. 3. A description of the pollutan
Jan 1, 1971
-
Opening Address (5eb675c1-7727-4226-8a83-797323192c83)Mr. Chairman, Distinguished Guests, Ladies and Gentlemen. I was delighted to be invited, and to accept the invitation, to welcome to this specialist meeting on an intriguing subject, the local par
Jan 1, 1981
-
Better Decision-Making from Mine to Market By Better Assessment of Geological UncertaintyInadequate understanding and/or assessment of technical and economic risk associated with geological uncertainty are key reasons many mining projects do not achieve forecast profitability. In the last
Jan 1, 2009
-
A Problem-Solving Curriculum for Metallurgical Process EngineeringPart of a four-year course in metallurgy, dealing with metallurgical process engineering, was designed for students to acquire knowledge and skill from physical science, metallurgy, process engine
Jan 1, 1984
-
Cement Properties Related To The Behaviour of Cemented FillEconomies in cemented fill demand the utilisation of the full potential of the portland cement component of the mix. If declined tailings are used, it is desirable to establish the optimum particle
Jan 1, 1973
-
Kwinana Nickel Refinery - Recent Plant ChangesBy Troman L, Groutsch J. V
The Kwinana Nickel Refinery began operations in 1970 processing sulphide concentrates from Kambalda using the Sherritt Gordon pressure leach and hydrogen reduction process to produce nickel metal as
Jan 1, 1996
-
The Establishment and Operation of Queensland Alumina LimitedThe operation of a one tonne submerged combustion pilot plant for the recovery of copper from anode furnace and converter slags is described and the effects of variables discussed. Using coal as r
Jan 1, 1978