Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Cave Tracker Flow Monitoring System Installation at Argyle Diamond Mine

    By M Wilson, D Whiteman, P Kuiper, S Talu, G Watt, A van As

    Once the draw process has begun in a block cave, it is very difficult to identify which regions of the cave have successfully propagated, where the caved material is flowing from and where it is flowi

    May 9, 2016

  • AUSIMM
    Improving the Performance of Precipitator Tanks in an Alumina Refinery Using CFD Modelling

    By A Manzoori, M T. Shadloo

    This paper describes a CFD modelling study which was carried out to investigate possible improvements in the design of an alumina precipitator tank at the Jajarm plant of Iran Alumina Company. In part

    Jan 1, 2006

  • AUSIMM
    False Colour Backscatter Electron Images and Their Application During Electron Microprobe Analysis of Ores and Host Rocks

    By Ramsden AR, French DH

    The limited contrast range of conventional black and white imaging does not enable full use to be made of the dynamic range of the video signal obtained from a scanning electron microscope or micro

    Jan 1, 1989

  • AUSIMM
    Where DEM and SPH collide – wet screening optimisation with numeric tools

    By J Plinke

    The imperative to operate sustainably requires all equipment and processes to operate at their maximum possible efficiency. Achieving this ideal state requires a thorough understanding, not only of th

    Nov 8, 2021

  • AUSIMM
    Pre-concentration via waste rejection based on fragment size – Olympic Dam case study

    By K Ehrig, V Liebezeit, Y Li, B Pewkliang, M Smith, E Macmillan

    Pre-concentration of low grade ores via the rejection of low/no value materials based on fragment size is the subject of many published papers and studies over the past decade. However, the possibilit

    Nov 10, 2020

  • AUSIMM
    West Works-Mount Morgan (Queensland) Chlorination

    THE treatment by chlorination of the Mount Morgan Gold Mining Company's ores was first accomplished, early in 1886, by a works having a capacity of 25,000 tons per annum. Shortly afterwards anoth

    Jan 1, 1911

  • AUSIMM
    Process Information Management System at Mount Isa

    The implementation of a process information management system (PIMS) is to provide a single online, real-time information system. This system provides a unique and completely open view for everyone, b

    Jan 1, 2005

  • AUSIMM
    Sources of Alluvial Gold, Nokomai Catchment, Northern Southland

    By P Wopereis

    The Nokomai valley is located within the pumpellyite/actinolite facies of the Otago Schist, a regional scale metamorphic belt in Southern New Zealand. The Otago Schist is dominated by psammitic and pe

    Jan 1, 1996

  • AUSIMM
    Incorporating Economic Risk in Pit Slope Designs

    Advances in technology have led to larger and deeper open pit mines and, consequently, also increased the potential economic impact associated with slope failures. If the ultimate aim of mining operat

    May 1, 2010

  • AUSIMM
    The VIMP Program and Major Advances in Geological Mapping in Victoria

    By OÆShea P. J, Dickson T. W

    In April 1994 the Victorian Premier announced new State initiatives, collectively termed the Victorian Initiative for Minerals and Petroleum (VIMP), for exploration totalling $16.5 m over three yea

    Jan 1, 1997

  • AUSIMM
    Production of Cobalt Oxide, Cobalt Sulphate and Electrolytic Cobalt

    In, one stage of the purification sequence of the zinc sulphate electrolyte used at Risdon, cobalt is, precipitated as cobalt nitroso-,B-naphtholate, which is separated from the solution by filtration

    Jan 1, 1949

  • AUSIMM
    The Contribution of Diamond Drilling to the Geology and Development of the Ipswich Coalfield

    Drilling at Ipswich during the last twelve years by the Queensland Department of Mines has proved large quantities of reserves which have assured the security of the field for many years to come. This

    Jan 1, 1963

  • AUSIMM
    Applied Mineralogy of Refractory Copper Ores from the Nchanga Mine in the Copperbelt of Northern Zambia

    By A M. Hagni

    Certain copper ores from the Nchanga Copper Mine in the northern Zambia Copperbelt are refractory with respect to conventional beneficiation techniques. This paper reviews recent study of those ores t

    Jan 1, 2008

  • AUSIMM
    Why combine reverse circulation and diamond drilling in Mineral Resource estimation at Purnama?

    By A N. Kasnanto, D A. Sims, J Pocoe, B Pulungan

    In this case study we compare the sampling quality of diamond drilling (DD) and reverse circulation (RC) drilling at the high sulfidation Purnama gold–silver (Au-Ag) deposit located in northern Sumatr

    Sep 20, 2017

  • AUSIMM
    Pit-Lake Water Quality in Coal Deposits, Southland, New Zealand

    By D Craw, J Pope, B Peake

    Southland contains over 70 per cent of New ZealandÆs recoverable coal resources, and an investigation into the potential effects of coal mining on SouthlandÆs water resources is therefore of interest.

    Jan 1, 2006

  • AUSIMM
    In Situ Rehabilitation of Concentrate Tailings at Macraes Mine: A Contingency Option

    By D Craw, D Wilson, D Chappell

    Gold is extracted by cyanidation of a sulphide-rich concentrate at Macraes mine, and after cyanidation, the concentrate is discharged to tailings impoundments. The concentrate tailings were discharged

    Jan 1, 1998

  • AUSIMM
    Geological Modelling of a Stoping Block at BHP's Cannington Ag-Pb-Zn Mine

    Production of oic at BHP Minerals Pty Ltd's Cannington Mine commenced in May 1997. The initial sloping blocks at the [nine are located in the upper part of the Footwall Lead lode, and the Hangi

    Jan 1, 1997

  • AUSIMM
    Styles of High-Sulphidation Gold, Silver and Copper Mineralisation in Porphyry and Epithermal Environments

    High-sulphidation (HS) gold, silver and/or copper deposits are generated in both the epithermal and the upper parts of the underlying porphyry environments over vertical intervals of up to 2 km. The H

    Jan 1, 1999

  • AUSIMM
    Verified Stability Modelling of Highwalls

    By D Fergusson, J D. St George

    Highwall stability is a major consideration in optimising opencast mine geometry. It involves assessing the risk of those slope failures that are large enough to have significant cost, safety and/or o

    Jan 1, 2006

  • AUSIMM
    Physical modelling of tailings dam breach: exploring overtopping following shear failure

    By W A. Take, M McKellar, A Walsh, S McDougall, S G. Evans

    Recent tailings dam failures have heightened public awareness of the hazard posed by storage facilities for mining waste, illustrating the need for a more critical examination of tailings dam breach m

    Jul 1, 2021