Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Advances in Mathematical Modelling of Sintering Performance of Iron Ore Fines

    By T Raynlyn, R J. Holmes, J R. Manuel, A Poliakov, L Lu

    The prediction of sintering performance of iron ore fines and the possibility of targeted optimisation of specific sinter properties are very important for both the iron ore industry and related resea

    Jan 1, 2009

  • AUSIMM
    Flotation Process Control Optimisation at Prominent Hill

    By J Lombardi

    OZ Minerals' Prominent Hill copper-gold concentrator is located 130 kilometres south east of the town of Coober Pedy in the Gawler Craton of South Australia. The concentrator was built in 2008 an

    Aug 8, 2011

  • AUSIMM
    The Use of Integrated Exploration Techniques to Improve Geological Reliability of Longwalls and their Development Roads

    The exploration methods used by the British Coal Corporation in 1990 improve the geological reliability of underground coal production. Although some of the techniques in common use have been proved t

    Jan 1, 1991

  • AUSIMM
    Classification Improvements Using Air Core Booster (ACB) Assisted Cavex Cyclones in the Mt Charlotte Circuit at KCGM

    By K Paki, K Parker, J F. Dupont

    The Mount Charlotte grinding circuit at KCGMÆs Fimiston mill was recently equipped with three 650 mm CAVEX cyclones in order to improve the overflow P80, reduce the fines bypass to the underflow and i

    Jan 1, 2007

  • AUSIMM
    The Development and Application of Health, Safety, Environment and Community Management Standards in BHP Billiton

    Prior to the merger of BHP and Billiton, both companies had a keenfocus on improving their performance in health, safety, environment and community (HSEC) matters. This shared intent, albeit executed

    Jan 1, 2002

  • AUSIMM
    Water Conservation at Construction Projects

    By B Hannah, M Uriarte, F Labarca, C Madore, G Ganapathi, L Martin, T Haase

    BechtelÆs Mining and Metals projects across the globe are executed in remote arid and semi-arid countries where providing even basic water supplies impose considerable challenges. Opportunities for wa

    Nov 26, 2013

  • AUSIMM
    The Application of High Pressure Water to Shearer Loaders

    The patented "Epytensic" pump of Minnovation Ltd, a multiple piston pump, is used widely on shearer loaders and by partial high pressure watcr jet cutting strategically in relation to cutter picks not

    Jan 1, 1991

  • AUSIMM
    Prevention of Coal and Gas Outbursts in Taiwan Coal Mines

    By Liu C. H, Juang Y. F

    Coal/gas outbursts were one of the rather difficult safety problems faced in the coal mines of this Country, with coal fields characterized by frequent disturbances of folds, faults and pinch-offs.

    Jan 1, 1988

  • AUSIMM
    Influence of Pack Design Upon Gateroad Deformation in Soft Floor Conditions

    By Payne AR

    The high cost of gateroad repairs and maintenance in U.K. longwall coalmining is a clear indication of the failure of permanent support systems to fulfill their prime function, i.e. control of str

    Jan 1, 1986

  • AUSIMM
    Corrosion and Fouling Control in a Cooling Water System

    By Tobin GJ

    Testwork carried out in the cooling water circuit at the Yabulu treatment plant of the Greenvale Joint Venturers (Metals Exploration Queensland Pty. Ltd. and Freeport Queensland Nickel Incorporated) s

    Jan 1, 1985

  • AUSIMM
    Maturity of Jurisdictional Abandoned Mine Programs in Australia Based on Web-accessible Information

    By C J. Unger, A M. Lechner, A Walton, V Glenn, M Edraki, D R. Mulligan

    In Australia, responsibility for abandoned mines can be unclear. With a few exceptions, state and territory governments have become responsible for abandoned mines on Crown land and private landholder

    Jul 16, 2014

  • AUSIMM
    Resource Efficient Mining Processes of Tomorrow

    By P Holtham, K Duffy, W Valery, A Jankovic

    In the face of increasing energy costs, limited water resources, more stringent legislation, and lower feed grades, the mining industry is searching for more sustainable technologies and practices. Me

    Nov 4, 2015

  • AUSIMM
    Metallurgical Accounting Standards in Process Plants

    Metallurgical accounting can be defined as the monitoring of the valuable metals from the time the ore is broken at the primary crusher until the time that we have the saleable products and residues.

    Jan 1, 2009

  • AUSIMM
    Role of Oily Bubbles in Enhancing Bitumen Flotation

    By J Masliyah, Z Xu

    The largest oil sand deposit in the world is located in Alberta, Canada, with a total proven reserve of 2.5 trillion barrels of oil. The water based extraction process is currently being used in comme

    Jan 1, 2005

  • AUSIMM
    How Much Do We Need to Drill?

    By C Taylor, E Retz

    Sequential Gaussian conditional simulation of wide-spaced exploration data has been completed in order to optimise a drilling grid at Fortescue’s Eliwana deposit. The aim of this drill grid is to impr

    Jul 13, 2015

  • AUSIMM
    Sustainable Development Reporting in the Australian Minerals Processing Industry

    By A Bossilkov

    Although environmental and sustainable development reporting has now become widespread in the Australian mining and minerals processing sector, there remains a great deal of diversity in reporting con

    Jan 1, 2004

  • AUSIMM
    Preliminary Investigation of the Effect of Pressure on Flotation Performance

    In a previous study, various pyrite depressants were examined to improve the flotation performance of a copper-sulfide ore. Optimal results from this study were used to examine the effect of elevation

    Jan 1, 2005

  • AUSIMM
    Blast design and execution drives mine site profits

    By J Loeb, J Dampney, P Cameron

    Optimisation of Blast Design and Execution must be done right the first time. It is too late after the ore is broken. Consequences of poor design and execution negatively affect productivity from load

    Jun 22, 2022

  • AUSIMM
    Optimising Underground Mining Strategies

    By A M. Ebbels

    "Underground mine scheduling decision-making has been based on production requirements, equipment productivities and the mine planner’s instincts on the best scheduling strategy for the mine to optimi

    Mar 8, 2016

  • AUSIMM
    Unlocking mine productivity by changing-the-equation on the where, what and when of orebody characterisation

    By S Warden, T Neville, P Leckie

    At its simplest, the classification and characterisation of an orebody is a matter of Where, What and When. Where and with what spatial resolution are measurements taken, What properties are measured,

    Sep 1, 2024