Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Pre-concentration via waste rejection based on fragment size – Olympic Dam case studyBy K Ehrig, V Liebezeit, Y Li, B Pewkliang, M Smith, E Macmillan
Pre-concentration of low grade ores via the rejection of low/no value materials based on fragment size is the subject of many published papers and studies over the past decade. However, the possibilit
Nov 10, 2020
-
Simulating Mine Backfill in a Fully Drained Condition Using Discrete Element ModellingBy A Karrech, A Hasan
This paper presents the numerical simulation of mine backfilling in underground stopes using three-dimensional discrete element modelling (DEM). The simulation predicts the forces exerted at the stope
Nov 5, 2014
-
Measuring the Redistribution of Stresses Resulting from New Excavations with Ambient Seismic Noise CorrelationsBy F Brenguier, R A. Lynch, G Olivier
The seismic velocities of intact rock are dependent on the applied stress. Unfortunately, the low susceptibility of seismic velocity to stress changes mean that changes in seismic velocity have to be
May 9, 2016
-
Use of Alkaline Industrial Wastes and Mine Tailings to Neutralise Acid Mine DrainageBy I Doye
Acid mine drainage is a serious environmental problem caused by the oxidation of sulfide minerals responsible for highly acidic, sulfate and metals-rich drainage. Several methods of mine waste managem
Jan 1, 2003
-
Design and Construction of the Access Tunnels for the New Top Ryde City Shopping Centre, Northern SydneyBy Q Yang
This paper describes the design and construction of three 7.2 m span access ramp-tunnels to the three level underground car park of the newly redeveloped Top Ryde City Shopping Centre in northern Sydn
Mar 8, 2011
-
Unlocking the Value in Waste and Reducing Tailings – Magnetite Production at Ernest Henry MiningBy J Siliézar
The Ernest Henry Mine (EHM) is situated 38 km north-east of Cloncurry in the Mount Isa – Cloncurry mineral district of northwest Queensland. The EHM orebody is an iron oxide copper gold deposit with a
Jul 11, 2011
-
The Kinetics of Ilmenite Leaching in Hydrochloric AcidThe production of synthetic rutile from ilmenite using hydrochloric acid leaching is investigated. Previously published data is used to comment on the optimum process conditions. It is shown that the
Jan 1, 2001
-
A review of the GAG as an effective firefighting toolBy D Chalmers
After the sustained use of the GAG (Górniczy Agregat Gaśniczy) engine at a Queensland coalmine, it has raised questions as to its effectiveness as a remote firefighting tool. All firefighting apparatu
Oct 12, 2022
-
Analysis of the Productive System for the Fully-Mechanised Coalface Using Simulated Model of the System DynamicBy Lu Fujun, Chen Xuewei
This paper will analyse the cause-effect relationship of the main factors influencing the production of the fully-mechanised coalface by mainly using the basic system dynamics theory. On the basics
Jan 1, 1998
-
Gold and Silver Enrichment in the Burdekin Goldfields-Implications for a Second Generation Mining and Metallurgical TechnologyMineralisation adjacent to Herberton occurs within three main subcentres. The Her- berton Hill subcentre is characterised by the association of Sn,W the Herberton Dividing Range South subcentre by S
Jan 1, 1978
-
Alternative Host Rocks for Archaean Gold Deposits: Nature and Genesis of Hydrothermal Gold Deposits, Kanowa, Western AustraliaAbout 20 percent of world gold production has been contributed by gold deposits in Archaean greenstone belts, of which ca 2100 tonnes of gold has been produced from Archaean greenstone belts in Wester
Jan 1, 1984
-
The Design and Evaluation of a Large Direct-Contact Ice-Air Cooler for Vaal Reefs Gold MineBy Bluhm S. J, Feio L, Ramsden R
A new mining area at the Vaal Reefs gold mine is to have a shaft. system which will extend to a depth of 4 200 m and will require 130 MW of cooling. A novel feature of the proposed cooling system
Jan 1, 1988
-
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer ProgrammingBy Y Li, S Ramazan, E Topal
A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t
Nov 24, 2014
-
Targeting dilatancy in upstream constructionBy A Simmons, J Chan, A Li, Q Gu, D M. Brett
The paper presents an example of field density achievements using thin layer deposition and solar drying and compares this with compaction data from laboratory testing and field trials of mechanical d
Jul 1, 2021
-
Adapting to Geotechnical Change – a Case Study of the Carina Open Pit MineBy R Jaine, D Strang, M Fowler
"This paper presents a case study demonstrating active geotechnical pit slope management at the now completed Carina Iron Ore Project operated by Mineral Resources Ltd (MRL). The site is located 105 k
Nov 15, 2016
-
The Method of Moments - A New Method for the Inversion of Gamma-Ray Logs from Uraniferous ZonesBy Lee T. J
The area, A, under a gamma-ray log that passes through a horizontal bed given by: A = gl/k. Here is the equivalent concentration of U3O8 in the body, l the thickness of the body, and k the calibration
Jan 1, 1981
-
Thermodynamic modelling of the Fe-Al-Ti-O system and evolution of Al- Ti complex inclusions during Ti-added ultra-low carbon steel productionBy Y B. Kang, Y J. Park
Ti-added ultra-low carbon (ULC) steel is produced by adding Al and Ti during the secondary refining process to deoxidise molten steel and to bind C and N which are detrimental to the deep drawing qual
Aug 21, 2024
-
A Simulation Approach for the Comparison of In-Pit Crushing and Conveying and Truck-Shovel Mining MethodsIn-pit crushing and conveying (IPCC) is being increasingly considered as an alternative to traditional truck-shovel mining methods. The move towards IPCC is driven by a number of factors including the
Dec 6, 2010
-
Excavating the First Underground Gyratory Crusher at the Deep Mill Level Zone Mine, PT Freeport IndonesiaBy E Hernandez, I Agustian, W Kusumohastuti
PT Freeport Indonesia is completing the first underground gyratory crusher excavation at their Deep Mill Level Zone (DMLZ) mine located in the mountains of Jayawijaya, District of West Papua, Indonesi
Mar 24, 2014
-
The Port Hedland FINMET« Project - Fluid Bed Production of High Quality Virgin Iron for the 21st CenturyBy Mayfield P. L J, Honeyands T. A
BHP's two million tonne per annum nominal capacity Hot Briquetted Iron (HBI) plant at Port Hedland in the Pilbara region of Western Australia is based on FINMET¦¦ direct reduction technology. T
Jan 1, 1999