Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Design, Installation and Commissioning of an Absorption Refrigeration System at Gwalia Gold Mine in Western AustraliaBy J deVries, A Broodryk, P Kyselica, K McLean
Gwalia gold mine is located close to the town of Leonora in the Goldfields region of Western Australia, some 830 km from Perth. The mine is wholly owned by St Barbara Ltd, an Australian Securities Exc
Aug 31, 2015
-
Case Study of Iron Ore Value Chain OptimisationBy J Foo, T Kleinschmidt, B Reynolds, K Kennewell
The consideration of complex supply chains often highlights multiple system bottlenecks that are localised and dynamic – they shift depending on what variability last influenced the system. Using the
Jul 13, 2015
-
Thernodynamic Properties and Phase Diagram of the Copper-Lead BinaryAlloy SystemABSTRACTFor the binary system copper-lead two relationsEquation 1andEquation 2have been derived for the activities of copper and lead at compositions and absolute temperatures within the liquid region
Jan 1, 1971
-
Non-Ideal Shock Energy Factor versus Powder Factor for Open Pit Blast Design – ANFO and Chemically-Sensitised EmulsionsBy K G. Fleetwood
This paper proposes an approach to determine the influence of non-ideal detonation characteristics related to the charge diameter, explosive type and confinement conditions on the available shock ener
Nov 8, 2011
-
Extending Real-Time Decision-Making Systems into Mine Maintenance ProgramsBy M Lewis, A Cook
This paper is based on the technology and functionality of a Modular Mining IntelliMINE« system which is a real-time decision-making tool. The IntelliMINE« system, incorporating Dispatch, is a fully I
Jan 1, 2000
-
Research Needs in Regard to Design, Performance Criteria, Construction, Maintenance Assessment and Repair of Coal Mine SealsLegislation introduced for Queensland and New South Wales Coal mines provides different levels of prescription regarding specification of mine seals û generally in relation to capacity to withstand ov
Jan 1, 2005
-
Maintenace Of Diesel Equipment UndergroundThe successful operation of diesel equipment underground does not entirely depend on selection of robust, reliable, easily maintained machines. Results are also heavily influenced by the following
Jan 1, 1977
-
Water Reform, Tradeability and Understanding the Value of Water for Large-Scale Resource ProjectsBy C Fenton
The mining industry is a relatively minor user of water, which has historically been largely soured from private schemes. Frequently mines are often located in areas with limited available water resou
Jan 1, 2003
-
Planning Open Stopes: Operating ConstraintsMine planning for ore recovery by open stoping and pillar recovery is becoming more sophisticated, but there are basic operating constraints which must be imposed if this planning is to realise th
Jan 1, 1982
-
Rehabilitation: Where Are We Now?Rehabilitation has been very effective in the short to medium term in providing a cost effective and reliable means of containing the side effects of land disturbance. However, there is still insuffic
Jan 1, 1992
-
Low Cost Production of Sulphuric Acid by the Minproc/Fattinger ProcessBy Sneyd R. J, Walton M. C
In early 1987 Minproc acquired a license from the inventor to engineer and construct acid plants incorporating the Fattinger technology. The process offers a simple and reliable method of producing
Jan 1, 1989
-
Morwell Open Cut: Mine Scheduling (36eba653-885d-47b0-b25f-6e2b458bad34)By Brimblecombe P
Morwell Open Cut is a continuous mining operation employing 5 buck- etwheel excavators, I bucket chain excavator and 54 conveyors. The combined bunkering capacity at both client Power Stations repres
Jan 1, 1989
-
A Method for Determination of Strength of Coal MassBy Qixiang Y
The strength of coal mass saturated with gas is an essential parameter in studying the mechanism of gas and coal outburst,and its prediction method. Up to now, there has not been a method for dete
Jan 1, 1992
-
Role of Quality Assurance in Manufacturing of Mining EquipmentCoal Mining machinery has undergone enormous changes in design and complexity of controls in the past 10 years. Specialised, high productivity equipment has been manufactured in Australia, in sufficie
Jan 1, 1991
-
On-Line Moisture Determination of Ore Concentrates ù A Review of Traditional Methods and Introduction of a Novel SolutionBy P Barrette
The manual gravimetric drying moisture determination methods currently employed by most mineral processing plants fail to provide timely and accurate information required for automatic control. The co
Jan 1, 2003
-
Critical process design considerations from test work to operationsBy A Dennis, T Hunter, R Coleman
For metallurgical plant design, it is necessary to progress through successive phases of test work, piloting and process development before involving all the other engineering disciplines and “freezin
Sep 11, 2017
-
Productivity and safety improvements supported by MST’s ImPact System at Glencore’s Mount Isa Copper OperationsBy D Kent, J Bullock, M Wilkinson
Over the last few years at Glencore’s Mount Isa Copper Operations (MICO) mining conditions have become increasingly challenging through lower head grades and higher work indices. MICO has had great su
Oct 16, 2017
-
An integrated and balanced approach to developing pre-concentration technologies across the mining value chainBy G J. Wilkie, P A. Revell
The R&D landscape for ore pre-concentration technologies within mining is characterised by the development of individual technologies and point solutions. This presents METS and mining companies with
Nov 10, 2020
-
The Impact of Gravity Gold Recovery at Kalgoorlie Consolidated Gold MinesBy D Hillier, A Giblett, K Parker, V Ramsell
Kalgoorlie Consolidation Gold Mines (KCGM) operates the Kalgoorlie Super Pit open cut, Mt Charlotte underground mine, Fimiston process plant and Gidji Roaster facility for joint venture partners Newmo
Oct 29, 2012
-
Developments at MHD 'Berzelius' DuisburgBy Tack K
During its 28-year life the MHD ISP smelter has gone through two phases, each of about a dozen years. The first phase was a learning one; in the second phase the lessons were applied and throughput
Jan 1, 1993