Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Variographic case study for designing, monitoring and optimising industrial measurement systems – the missing link in Lean and Six Sigma

    By O Bøckman, E Thisted, K H. Esbensen, U Thisted

    Process industry measurement systems, once installed, are often interpreted as static black boxes delivering correct values as long as not proven otherwise. After first implementation and set-up with

    May 9, 2017

  • AUSIMM
    Blasting Logistics at Rio Tinto Coal Australia's Hail Creek Mine

    In March 2003, Rio Tinto Coal AustraliaÆs (RTCA) new Hail Creek open cut coal mine commenced operations in the Bowen Basin. Hail Creek is a two-seam strip mining operation utilising two 90 m3 dragline

    Jan 1, 2007

  • AUSIMM
    Block Cave Evaluation

    By R J. Butcher

    Many deposits have been evaluated as potential block caves over the last 20 years due to the perceived benefit of low operating costs. However, block cave projects are typically capital intensive, wit

    May 9, 2016

  • AUSIMM
    The importance of rate of rise in life-of-mine planning of an upstream raised tailings storage facility – a case study

    By D A. Williams, P J. Chapman

    The acceptable rate of rise of the tailings beaches on upstream-raised tailings storage facilities (TSFs) is critical to life of mine planning. This is illustrated through a case study in Western Aus

    Jul 23, 2018

  • AUSIMM
    Understanding Reactions in Iron Ore Pellets

    By A R. Firth

    The induration furnace for iron ore pellets was originally designed to process concentrates with high contents of magnetite. To support the use of haematite concentrates, internal fuel was added to th

    Jul 11, 2011

  • AUSIMM
    System of Geological Plans and Sections of North Broken Hill Limited

    The inauguration of a geological department for the mines of North Broken Hill Limited necessitated the provision of accurate plans and sections upon which geological facts and projections might be pl

    Jan 1, 1940

  • AUSIMM
    Stope Blast Vibration Analysis at Dugald River Underground Mine

    By J Player, R de Vries, E Villaescusa, R Hassell

    Concerns regarding the uncertainty of stope dilution at MMG Dugald River Underground Mine led to a trial stoping program to acquire full-scale comprehensive geotechnical information and to test the va

    Aug 24, 2015

  • AUSIMM
    Planned Preventive Maintenance

    The development and introduction of a preventive maintenance scheme in the coke ovens department, coal preparation section, of The Broken Hill Proprietary Co. Ltd., Newcastle steelworks, is described

    Jan 1, 1961

  • AUSIMM
    Bringing Split Flotation to Reality ù The Cannington Experience

    The BHP Billiton Cannington mine uses sequential flotation to treat a silver, lead and zinc ore supplied from an underground mine. The final products from the process plant are a silver rich lead conc

    Jan 1, 2003

  • AUSIMM
    Categorical and multiple indicator kriging – are we ignoring the geology?

    By P C. J Blackney, I M. Glacken

    Spotted Quoll is a massive sulfide nickel deposit located in the Forrestania greenstone belt in the Archaean Yilgarn block in Western Australia. Discovered in October 2007, mining has progressed from

    Mar 22, 2022

  • AUSIMM
    Team Alignment Towards Alternative Project Delivery Methods

    Project delivery in our current market is not as efficient as it could be. Industry at large (both client and consultant), is diligently following the engineer, procure, construct, manage (EPCM) or en

    Jan 1, 2009

  • AUSIMM
    Making Rectangular Tunnels with the Mobile Miner

    Throughout 1992 Pasminco conducted field trials of the Mobile Miner MM130 at Broken Hill. The goal was to develop the machine to achieve acceptable reliability and establish production rates.

    Jan 1, 1993

  • AUSIMM
    Chemical Enhancement to Magnetic Separation for Effective Separation of Silicates from Titanium Phases at Finer Particle Size Fraction

    By S A. Ravishankar

    In heavy minerals separation, the titanium and iron oxide phases are separated from silicates in the coarser particle size range (80 - 150 mm) using magnetic and electrostatic separators. With the ong

    Oct 5, 2011

  • AUSIMM
    The Integrity of Cover Systems ù An Update

    By D J. Williams, E M. Rykaart

    Soil cover systems are routinely used to reduce acid rock drainage (ARD) from mine waste rock dumps and tailings impoundments. A technology for the analysis, design, instrumentation and monitoring of

    Jan 1, 2003

  • AUSIMM
    Wallaby - The Horizontally Challenged Opportunity

    Barrick Gold Granny Smith Mine is currently undergoing conversion from an open cut operation to an underground mine at the Wallaby deposit. The underground project commenced in 2005 with the developme

    Jan 1, 2008

  • AUSIMM
    Increasing the deportment of titanium species to, and the stability field of pseudobrookite phase for valourisation of titaniferous slags

    By J Nell, J Petersen, X C. Goso

    The feasibility of increasing the deportment of titanium species and the stability of the pseudobrookite solid solution (M3O5) in a titaniferous slag was investigated, to facilitate the valourisation

    Jun 19, 2024

  • AUSIMM
    Construction of the Molineux Facility Underground LPG Storage Cavern

    The underground storage of LPG and other hydrocarbons is in current commercial use in Northern Hemisphere countries in Europe, Asia and the USA.Elgas Pty Ltd, a 50 per cent joint venture between AGL a

    Jan 1, 1999

  • AUSIMM
    Broken Hill Metallurgy - A Story of Innovations in Processes, Equipment and Instruments

    By AJ LYNCH

    Broken Hill metallurgists have been responsible for some of the most important developments in mineral processing technology. These occurred mainly in two periods, 1902 - 15 and 1955 - 70. Mineral

    Jan 1, 1992

  • AUSIMM
    Lignite/Coal Injection System Installed at the Arbed Esch-Belval Works in Luxembourg

    By Bernard G, Limpach R, Ulveling L

    A major aspect in competitive ironmaking is to replace metallurgical coke by injecting alternative cheap fuels. Whereas in the past, heavy oil injection as well as on a lower scale natural gas inj

    Jan 1, 1981

  • AUSIMM
    Modular SAG mill discharge trommel for maintenance flexibility and performance

    By K Katov, S T. Ciutina, J D. Pyke

    The development and optimisation of mill discharge trommels, and specifically their screen panels, can be a neglected area in the complex operation of a minerals processing plant. Trommels are often s

    Aug 29, 2018