Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mount Angelo Copper Prospect, East Kimberleys, W.A.

    The Mount Angelo prospect outcrops as two copper rich gossans, the larger of which is 250 ft long and 70 ftwide. The mineralization is epigenetic and replaces part of a brecciated and disturbed lime t

    Jan 1, 1966

  • AUSIMM
    Surface Subsidence Modelling for Prediction of Settlements from Thick Seam Partial Extraction

    This paper discusses the prediction of subsidence over partial extraction systems in thick coal seams. A model based on empirical techniques using influence functions is developed to calculate the sur

    Jan 1, 2002

  • AUSIMM
    Epithermal Vein Mineralisation and Alteration, Waiotahi Valley, Thames

    By D S. Clarke, K B. Sporli

    The Thames Goldfi.eld has been a major gold resource in the west of the Coromandel Peninsula, New Zealand, with the Waiotahi quartz vein system forming a large part of the field. Mineralisation is hos

    Jan 1, 1991

  • AUSIMM
    Presidential Address (f9446de2-f07b-4880-8e2a-dc5f91667a36)

    Mr. BRADFORD said :-On assuming this chair, which has been occupied by so many gentlemen of conspicuous ability; my first words must be an expression of the gratitude I feel for the honour you have do

    Jan 1, 1926

  • AUSIMM
    DeGrussa Copper Mine, Western Australia - Feasibility to First Production: A Case Study in Developing a Working Geometallurgy Model from First Principles

    By P Vass, C Butler, J Condon, B Hooper

    DeGrussa Copper Mine, resource status 10.2 Mt at 5.7 per cent Cu, 2.1 g/t Au (Sandfire Resources, 2013), commenced concentrate production through its 1.5 Mt/a conventional copper flotation processing

    Sep 29, 2013

  • AUSIMM
    Mill relining optimisation – a story of collaboration

    By P Rubie, B Morgan, J Russell, C Stewart

    The relationship between efficient liner exchange, concentrator availability and concentrator profitability is well documented. Russell Mineral Equipment’s (RME) relationship with OZ Minerals’ Promine

    Sep 11, 2017

  • AUSIMM
    Rheological Behaviour of Clay-Rich Gangue Mineral Dispersions During Hydrometallurgical Treatment

    Rheological Behaviour of Clay-Rich Gangue Mineral Dispersions During Hydrometallurgical Treatment Alumino-silicate minerals invariable may present an intractable challenge in hydrometallurgical opera

    Sep 13, 2010

  • AUSIMM
    Heat and Moisture Exchange in Mine Airways

    Au airway hteat and moisture exchange .,Jgorithm is described which is generalised to suit most mining situations and can be run separately on a microcomputer or used within a network simulation.

    Jan 1, 1988

  • AUSIMM
    Lead and Zinc Smelting Charges

    By Grey CA

    Any economic evaluation of a lead-zinc mining project requires the estimation of net revenue per tonne of concentrate at the "mine gate". The value at the mine gate equals the Net Smelter Return min

    Jan 1, 1990

  • AUSIMM
    Improvements in the Application of Water Cooled Tests for Cupellation

    Since the introduction of water cooled test rings the operation of cupelling retort bullion has not alone been sImplified, but has also been the means of concentrating the bullion for the fining test

    Jan 1, 1901

  • AUSIMM
    Metana Minerals N.L. 1970-1990: An Emerging Diversified Miner

    Metana Minerals commenced life in 1970 and graduated to a mining company in 1981 with the opening of a small alluvial tin-tantalite mine at Wodgina (W.A.) The present board of directors assumed cont

    Jan 1, 1989

  • AUSIMM
    Weighing, Sampling, and Analysis for Sales Realisation - the Bougainville Experience

    Bougainville Copper Limited (BCL) ships about 600,000 dry tonnes of copper concentrate per annum to Japan, Germany and Spain, with some spot sales to other countries. Concentrate sales value for 19

    Jan 1, 1986

  • AUSIMM
    Current Situations, Problems, Countermeasures and Suggestions for ChinaÆs Metal Mine Development

    By L B. Zhou, S Li, B L. Wang, S B. Li, Q Wang

    The rapid development in ChinaÆs metal mine resources has caused a series of mine environment problems such as serious ecological damage and environment pollution, and secondary geological disasters.

    Jul 10, 2012

  • AUSIMM
    Wetting and drying cycles as a means to determine the effect and consequences of tailings ageing

    By T Baumgartl, R Akesseh, M Edraki, B Usher, M Shaygan

    With the continuing demand for industrialisation and urbanisation, the rate of mining and processing lower grade ores will also increase, producing large quantities of waste. As extreme weather events

    Jul 25, 2018

  • AUSIMM
    Lead-Zinc Flotation Circuits Tested at Mount Isa Mines 1959-1963 (9858f0dc-f385-4a3d-8b45-7d50f36477d6)

    By Tanner A. C, Harraway D. H

    Various circuits were tried at Mount Isa Mines during the period 1959 to 19G3 with the objective of improving the differential flotation of galena and sphalerite. Many benefits and disadvantages of th

    Jan 1, 1963

  • AUSIMM
    The Halloysite Clays of Northland, New Zealand

    By R B. Evans, M G. Townsend

    In Northland, New Zealand, localised large deposits of halloysite clay have been produced by in-situ alteration of rhyolite volcanics of Pliocene or Pleistocene age, which were erupted through pre-Pli

    Jan 1, 1990

  • AUSIMM
    Recovery of Colloidal Gold from Oxidised Concentrate Wash Liquor - Further Improvement

    By R Symes

    The Fosterville Goldmine in Victoria Australia employs the BIOX« Process to liberate gold from its sulfidic flotation concentrate through bacterial oxidation. Gold occurrence is primarily as submicron

    Oct 29, 2012

  • AUSIMM
    Pillar Recovery Adjacent to Stabilised Rock Fill at the Ballarat Gold Project

    By D P. Sainsbury, J Western, B L. Sainsbury, V Mutton, P E. Petrie

    Remnant rib pillars at Castlemaine Goldfields Ltd’s Ballarat Gold Project have been sterilised by the placement of loose rock fill in production stopes. The application of selectively injecting low-vi

    Nov 5, 2014

  • AUSIMM
    Shift Roster Modification to Increase Productivity at PT Freeport Indonesia Underground Mine

    By B Ganesia, H Sahupala

    PT Freeport Indonesia is a copper-gold mine operation located in West Papua, Indonesia about 3500 km east of Jakarta. Current ore production is about 270 000 tpd, of which 30 000 tpd comes from underg

    Jan 1, 2002

  • AUSIMM
    Description of the Shear Stree Distribution around and Excavation at WIPP

    The estimation of the shear stress distribution around an excavation is important to the design of the excavation since shear stresses can generate cracks, loosen grain boundaries or otherwise degrade

    Jan 1, 1998