Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Deposit Morphology and Current Efficiency in Electrolytic Zinc DepositionBy Pollard D, Meadows N
The presence of impurities which are electropositive to zinc in acid zinc electro- lyte causes changes to deposit morphology and reduced current efficiency. Glue may be added to control some impuri
Jan 1, 1984
-
Geological Modelling of a Stoping Block at BHP's Cannington Ag-Pb-Zn MineProduction of oic at BHP Minerals Pty Ltd's Cannington Mine commenced in May 1997. The initial sloping blocks at the [nine are located in the upper part of the Footwall Lead lode, and the Hangi
Jan 1, 1997
-
Mill Auto-Pilot at CSA MinesBy A Thornton, D Engelhardt, J Woodg
Grinding is a critical part of nearly all mineral processing operations. It is the largest consumer of energy on the mine site (and thus indirectly a producer of greenhouse gas through the generation
Jan 1, 2004
-
Cost-Benefits in Underground Urban Public TransportationUrban railway systems need high invest- ments, especially if their routes and stations have to be placed in the subsurface. In the FRG the construction and equipment cost of urban underground railw
Jan 1, 1987
-
Copper Tank House Technology Reviewed and AssessedThe present practices in electro-refining of copper are shown to be the result of piecemeal and gradual improvements and innovations as metallurgists responded to changing cost pressures and the avail
Jan 1, 1985
-
Operation at Blackwater MineThe Blackwater Coal Mine is a modern open cut operation using large draglines for over- :)urden removal and shovels, loaders and trucks to mine and haul coal to the crushing and coal ?reparation pla
Jan 1, 1974
-
Practical Design and Operational Aspects of Bulk Solids Storage and Discharge FacilitiesBy Ooms M, Scott OJ
This paper is concerned with the design and operation of storage and discharge facilit- ies for bulk solids handling. It presents an overview of the basic design philisophy emphas- ising the influenc
Jan 1, 1978
-
Application of SMELT-2 Package to a Study of Continuous Converting in Sirosmelt ReactorsBy Denholm W. T
The SMELT-2 package is specifically designed to perform on-line simulation of smelting processes. This paper describes its application to the simulation of continuous matte converting followed by r
Jan 1, 1989
-
Acid Rock Drainage Treatment Technologies ù Identifying Appropriate SolutionsBy N Murphy and, S Santomartino, M Cramer
Acid rock drainage (ARD) can have detrimental effects on mining infrastructure, water reuse options and environmental discharge. As a result, some form of short- or long-term treatment is required at
Jan 1, 2003
-
Tarong Power Station Ash Thickening PlantBy C Hertle
GHD-Black & Veatch (GHD-BV) have completed design and specification of the ash thickening plant at Tarong Power Station, including operation of a pilot plant. Construction of the plant is in progress
Jan 1, 2003
-
Some Aspects of Intelligent Mine and ModelsAlmost all industrial products, such as buildings, cars, plastics, railways, radio and television sets, computers, and others are made from materials extracted from the Earth. Earth is main resource o
Jan 1, 2003
-
The Chinese Tectonics Structure and their Stress AnalysisThrough the stress synthesis of many exanples of macrostructure from eastern to western parts of China, it can be concluded that in Chinese tectonics there are two push- twisting forces, one of w
Jan 1, 1987
-
The Estimation And Mining Of Gove Bauxtie ReservesFormed in 1965 to investigate the bauxite deposits on the Gove Peninsula, in the Northern Territory of Australia, Nabalco Pty. Limited undertook to determine the feasibility of establishing a minin
Jan 1, 1979
-
Recent Advances in Excavation Technology - The Mitsui RoadheaderRoadheaders have had a chequered history in hard rock excavation in Australia since their introduction into the country in 1972. This has resulted in a poor reputation among both clients and contracto
Jan 1, 1993
-
The Development of a CADD Mine Design SystemBy Gill L. F, Gleeson HB
This paper describes the development of a Computer Aided Design and Drafting based mine planning system in the State Electricity Com- mission of Victoria. The system combines a commercially available
Jan 1, 1989
-
Roof Bolting Machines in the Australian Coal IndustryBy Balks AI
Systematic roof bolting in Australian coal mines began at Elrington Colliery in 19)49. Since that time the proportion of the roof supported by roof bolts has increased until, in 1970, 1.5 million w
Jan 1, 1971
-
The Nickel Sulphide Deposits of Kambalda, Western AustraliaBy Hopkins G. M F
Intensive exploration of the Archaean ultra mafic sequence bordering the Kambalda dome has resulted in the discovery of at least ten dis- tinct areas of nickel sulphide mineralisation subsequent to
Jan 1, 1973
-
The Behaviour of Cobalt During Nickel Smelting ConvertingThis paper outlines the thermodynamic and mass balance principles which affect the distribution of cobalt between matte and slag during the pyrometallurgical treatment of nickel - copper sulphides
Jan 1, 1992
-
New Zealand Offshore Gold Exploration - The Harvester ProjectBy N G. Corner
A sea bed sampling programme by CRA Exploration Pty Limited over an area of 12 000 km offshore from Westland, Southland and Otago, New Zealand, led to the discovery of the Harvester Prospect, an area
Jan 1, 1990
-
The Split Rock Prospect, Chillagoe District, North QueenslandThe Split Rock low grade copper prospect was discovered in 1969 by Cyprus Mines Corporation using stream geochemistry. Cyprus "Imes carried out geochemical and geophysical investigations, geologica
Jan 1, 1978