Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Quartz Vein Associated Gold Deposits in New Zealand, Geology and Geochemistry of Characteristics Types

    By Hinton A. T

    Three, and possibly four, distinct types of quartz-vein associated gold mineralisation are recognised in New Zealand. They are: epithermal, schist-hosted, metagreywacke-hosted and metamorphic core com

    Jan 1, 1990

  • AUSIMM
    Mechanized Cut and Fill Mining Long Shaft - Kambalda Nickel Operations

    In line with mining operations throughout Australia, Western Mining Corporation Limiter' is striving to increase productivity by intro-ducing mechanized mining techniques wherever possible. Kamba

    Jan 1, 1985

  • AUSIMM
    Consideration to Increase Gas Drainage Ration Basing Upon Methane Drainage Practice in Japan

    By Ohga K, Isobe T

    Basing upon many and long practical experiences of gas drainage from coal seam and results investigations on the gas flow through in si-tu coal seam using tracer gases,it became clear that solid co

    Jan 1, 1982

  • AUSIMM
    Al Assisted Coal Interpretation Techniques

    By Godresse M, Turczynski G. P J, Driver I. J, Low G, Ozawa N

    Geological evaluations of coal deposits have been traditionally undertaken in a somewhat manual manner. Information is collected downhole by chip sampling, coring and using downhole geophysical log

    Jan 1, 1995

  • AUSIMM
    Lead-zinc Ore Mining by Mount Isa Mines Ltd, Hilton Mine, Mount Isa, Qld

    Hilton Mine is located 20 km north of the city of Mount Isa and Isa Mine in far north west Queensland. The sealed road used by the 500 employees to commute from the city is part of the Barkly Highway

    Jan 1, 1993

  • AUSIMM
    Installation of an Automatic Truck Despatch System at Bougainville Copper Limited

    In early 1985, Bougainville Copper Limited commissioned an automatic truck despatch system to control its fleet of 44 trucks and 9 shovels. Productivity gains in the past have been the result of i

    Jan 1, 1986

  • AUSIMM
    Review of Some Recent and Current Open Cut R&D Projects

    By Brett J. R

    Some recent and current research and development projects relating to strip type open cut coal mining are reviewed. The projects include a dragline-hopper-truck mining system, an overburden slusher

    Jan 1, 1991

  • AUSIMM
    Geotechnical Shaft Reconciliation at Oyu Tolgoi, Mongolia

    By A Purvee, M F. Lee, L J. Mollison

    Oyu Tolgoi is a large Cu-Au porphyry deposit in the south Gobi desert, Mongolia. The first of several deep, large-diameter, concrete-lined shafts, Shaft 1, is nearing completion. It will have a finish

    Jan 1, 2008

  • AUSIMM
    Groundwater Search Management In Desert and Arid Terrain - A Case History Telfer, Great Sandy Desert, Western Australia

    During the intial two years (1972 - 1974) of exploration at Telfer, water require- ments were limited to supporting a 50 man camp and diamond drilling to verify thickness and grade of the strataboun

    Jan 1, 1988

  • AUSIMM
    Lithological Controls on Disseminated Gold Mineralisation, Macraes Mine, Otago Schist, New Zealand

    By D Craw

    Interactions between structure and lithology in the Hyde-Macraes Shear Zone controlled the style of gold mineralisation at the Macraes mine. Large volumes of rock in some mine pits have most gold diss

    Jan 1, 2004

  • AUSIMM
    Lateritic Weathering of Serpentinite at Rockhampton, Queensland

    By Hewitt D

    A study of two laterite profiles developed on a serpentinite near Rockhampton, shows that loss of Si02 and MgO results in the relative concentration of Fe203, A1203 and a number of minor elements.

    Jan 1, 1974

  • AUSIMM
    Recent Developments in Electrical Exploration

    The MIMDAS geophysical data acquisition system developed and tested by the former MIM Exploration Pty Ltd (MIMEX) is now commercially available worldwide through Geophysical Resources and Services Pty

    Jan 1, 2004

  • AUSIMM
    Mining A 100 Million Tonne Orebody Without Subsidence (1eceb353-235c-4b84-8df9-2b3937c9c8f3)

    The major copper orebody at Mount Isa is being extracted at a rate of four million tonnes per year. The method used requires an equivalent rate of back filling with (mainly) cemented fill. There w

    Jan 1, 1980

  • AUSIMM
    Rockburst: Understanding and Control - Past, Present and Future

    By Hagan T. O

    The problem of rockbursts presents a serious threat to many deep, hard-rock mines. For several decades, the owners and managers of affected mines have been concious of the urgent need to control r

    Jan 1, 1986

  • AUSIMM
    Challenges in Light Metal Production

    By M Cooksey, C Goodes, G Wellwood

    Light metals have great potential for application in the automotive and aerospace industries because of their excellent physical properties. The usage of aluminium, titanium and magnesium is limited b

    Jan 1, 2006

  • AUSIMM
    Haul Truck Maintenance Procedures at Bougainville Copper Limited

    The procedure used for Truck Maintenance is described systematically in this paper. Emphasis is given to manpower required, work facilities, daily maintenance and oil sampling procedure. Scheduled

    Jan 1, 1982

  • AUSIMM
    Improvements in Truck and Shovel Scheduling Based on Capacity Constraint Modelling

    By P C. Hagan

    Production scheduling is often reliant on an estimation of a mineÆs trucking capacity. While this mechanistic approach is relatively simple, it often over-estimates actual throughput resulting in und

    Jan 1, 2007

  • AUSIMM
    Recovery of Gold from Lancefield Arsenical Sulphide Ore

    By Kellett KR

    Gold Mining at the Lancefield Mine was commenced initially in 1897 and continued intermittently through to 1956 when rising costs and mine cave-in forced closure. The mine was redeveloped in 1981 and

    Jan 1, 1984

  • AUSIMM
    Predicting Slope Stability in Open Pit Gold and Coal Mines

    By L Clarke, R N. Campbell, F Bourke, J Anderson

    Lithological units have been classified geotechnically with mechanical tests and discontinuity measurements from the GRD Macraes Limited, Macraes Gold Project and Rotowaro coal mine open pits, New Zea

    Jan 1, 2000

  • AUSIMM
    Management of Mine Water Integrated to Mining Systems

    By Owen D

    A central part of mine planning is to ensure the protection of the beneficial uses of water. Integrated mining software does not generally provide tools to help the mining engineer to achieve this o

    Jan 1, 1995